TECHNICAL QUERY
FOR CONTRACTOR USE
Problem: 1. How is the Pumping Sytems for Chilled water at Chiller Plant?
2. Pressure requirement of chilled water supply at Tapping Point.
3. System of operation of Chiller Plant.
4. Does Chiller Plant Connected and Controlled by BMS Systems.
5. Altitude of Tapping Point to Chiller Plant.
6. Minimum and Design Ambient Temperature at Chiller Plant.
7. Pressure and flowrate requirements of Water Supply and Firepro System at
Tapping Point.
8. Does Water Supply and Fire Protection Combine in One Pipe Sytem to
Tapping Point?
Approved by Date:
PROJECT MANAGER – ZFP CORE TEAM
Distribution: