Product manual

LB7 40.5-300
Oil current transformer (hairpin type)
The information contained in this document may be subject to change without prior warning and should not be considered as binding
on ABB Jiangsu Jingke Instrument Transformer Co., Ltd. (abbr. ABB Jiangsu) 's behalf. ABB Jiangsu accepts no liability for any errors
that may appear in this document. ABB Jiangsu is not liable for any damage resulting from the incorrect interpretation of this document.
This document, or parts thereof, may not be reproduced or copied without ABB Jiangsu's consent. It must not be distributed to others,
or used by unauthorized parties. Any breaches to the above will be penalized with the support of applicable laws.

Copyright 2015 ABB All rights reserved.

ABB Jiangsu Jingke Instrument Transformer Co., Ltd.


No.9 Gucheng Road, Su-Su Industrial Park, Suqian, Jiangsu Province, 223800, P.R. China
Tel: +86 527 8288 0810
Fax: +86 527 8288 0868

www.abb.com.cn

02 LB7 40.5-300 | Oil current transformer (hairpin type)


Table of contents

04 Packing, transport and storage

06 Product and application

08 Installation

12 Maintenance

13 Troubleshooting

14 Product information

Oil current transformer (hairpin type) | LB7 40.5-300 03


Packing, transport and storage

Packing Storage site: The ground should be strong enough to stand the
ABB will prepare, pack and load its materials and instrument pressure of packing case. Please make sure the rain-proof
transformer according to requirement of customer inspection, measure is taken if instrument transformer is stored in outdoors.
guaranteeing that equipment and packing material are qualified for
international freight by sea or by air. Ambient condition: The surrounding air must be free from dust
and corrosive medium. The temperature is not less than -30 .
Instrument transformer will be packed in horizontal direction in Outdoor storage time should be less than 12 months. For long
wood crate and plywood, the packing crate will be treated by term storage, products must be packed. Please clean the outer
steam to guarantee that it will be free of insect eggs, plant seeds insulation before assembling.
or animalcule. Instrument transformer packed in vertical direction
should be in the plywood package. The crate is strong enough for Before using the product again after storage or prolonged period
transport under normal conditions by sea and road freight. of suspension from service, check signs of oil leakage and
measure insulation resistance of winding and end shield, power
All parts of the plant shall be carefully packed and marked to losses factor, capacitance and power losses, chromatography
ensure quick identification and erection on site. All packing will be and moisture content of transformer oil. Appropriate measures
seaworthy for on-deck/under-deck transport. must be taken if result is not conform to requirements.

Transport Stacking of cases: Stacked layers should be confirmed with the


For extreme bad freight condition, purchaser should provide packing requirements (please refer to the markings on the packing
information before award of order and special packing can be cases). Cases of different widths shall normally not be stacked. If
applied accordingly with agreement of the customer. cases of different widths need to be stacked, a framework must
be used between the cases in order to distribute the pressure
When products are transported by trucks, the speed of trucks evenly. Stacking of more than two cases is not allowed. It must be
shall be steady to avoid mechanical damage. noted that stacking causes instability sidewise and therefore the
cases must be secured, i.e., prevented from tumbling down or
Storage rolling over.
Upon arrival each unit should be checked according to the
shipping documents and the order. If damage is discovered or An approved store is defined as:
suspected, the case should be opened and photos should be Stored in indoor or under the roof to avoid the exposure to
taken. The package should be opened carefully to avoid the sunshine and rain. The equipment can be stored outdoors. If this
damage on the outer insulation. happens they should be protected by at least a tarpaulin. The
tarpaulin shouldn't be so tight so that air circulation to zinc coated
If intermediate storage cannot be avoided, please recover the surfaces is still prevented.
package for safety storage.

04 LB7 40.5-300 | Oil current transformer (hairpin type)


Marking Packing crate illustration
There are clear markings to indicate the terminals which should Product packing and markings:
meet the requirements of instrument transformer standards.

Nameplate: All permanent equipment of the works shall be


provided with a securely fixed nameplate maker's name, model,
serial number, year of manufacturing, main characteristic data of
the respective equipment and further relevant information. All main
equipment should have the nameplates in English or language
upon request.

Figure 1 Product packing Figure 2 Transportation marks


Note: Products are not free of secondary transfer. If necessary, please contact to us!

Oil current transformer (hairpin type) | LB7 40.5-300 05


Product and application

Application Product structure


ABB oil-paper insulated current transformer (hairpin) applies The product is oil-paper insulated and hairpin type with a chain
highest voltage of equipment 40.5, 72.5, 126, 145, 245, 252, 300 structure primary winding (40.5 kV), but U structure primary
kV and rated frequency of 50 Hz or 60 Hz. The functions are winding (72.5 kV and above). The product has high insulation level,
current electric energy metering and measuring, busbar differential low partial discharge, and small and stable dielectric dissipation
protection, overcurrent protection, and distance protection. factor.

Stainless steel expansion bellows are installed on the top of the


Product feature current transformer to isolate oil from the outside. It prevents
With Multi-layer limit sealing and strictly control on the moisture absorption and slows aging of inner insulation. The oil
compression ratio and compression strength, it ensures reliable volume can be adjusted due to temperature changes. The oil level
sealing without overpressure and oil leakage. Effectively extend indicator on the bellow can be used for inspecting the oil level. Oil
the service life of the product. tank is located at the bottom. On the oil tank, it has secondary
terminals, lifting hook, oil drain valve and earthing plate.
With multi main screen and thin insulation structure in the design,
it guarantees good partial discharge, good withstand voltage and External insulation
impact resistance performance. The external insulation of the product adopts high strength
porcelain bushing or composite hollow insulator and we can meet
With reliable contact type and enlarged contact area, it reduce the customer's requirements by providing corresponding
contact resistance to avoid partial overheating. configuration. Its flashover distance and creepage distance
guarantee to meet the actual application requirements of
customers.

Main technical parameters


Technical parameters comply with IEC 61869-1:2007 and IEC
61869-2:2012 or upon request. Individual project technical
parameters please refer to technical datasheet approved by
contract and nameplate.

Operation conditions
Application Outdoor or indoor
Ambient temperature Maximum temperature +45
Maximum daily average temperature +35
Minimum temperature -40
Altitude Less than 3500 m *
Atmospheric conditions There shall be no dust, corrosive or explosive mediums in the ambient air that may significantly influence the
insulation of current transformers
Maximum daily average relative humidity 95% (25 )
Maximum wind velocity 35 m/s *
System grounding method Neutral point effectively grounded (products with maximum voltage of 72.5, 126, 145, 245, 252, 300 kV)
Neutral point not effectively grounded (products with maximum voltage of 40.5 kV)

Note: * or upon request.

06 LB7 40.5-300 | Oil current transformer (hairpin type)


Electrical schematic diagram Nameplate
Figure 3 is sample of electrical schematic diagram. Individual Figure 4 is sample of standard nameplate in English. Other
projects diagram please refer to nameplate and diagram delivered language is available upon request.
along with products.

C2 C1
P2
P1

6S3 6S1 5S3 5S1 4S3 4S1 3S3 3S1 2S3 2S1 1S3 1S1
Figure 3 Electrical schematic diagram sample

MC
Current Transformer 13000001
Type Creepage Distance mm Oil NO. # Outdoor
Standard Rated Frequency Hz Rated Primary Current A
Insulation Level kV Rated Continuous Thermal Current A

Winding NO. Secondary Terminal Ratio Rated Output Accuracy Class


S1-S2 A VA
S1-S3 A VA
S1-S2 A VA
S1-S3 A VA
S1-S2 A VA
S1-S3 A VA

Short-Time Thermal Current kA s Oil Weight kg No.

Rated Dynamic Current kA Total Weight kg Date

Connection Diagram
C2 C1
P2
P1
6S3 6S2 6S1 5S3 5S2 5S1 4S3 4S2 4S1 3S3 3S2 3S1 2S3 2S2 2S1 1S3 1S2 1S1

ABB JIANGSU JINGKE INSTRUMENT TRANSFORMER CO., LTD.

Figure 4 Standard English nameplate sample

Oil current transformer (hairpin type) | LB7 40.5-300 07


Installation

Delivery
Check the current transformer for any transport damages
immediately upon delivery. Damage to packaging may be a sign of
rough handling. Note any damage (it is advisable to take pictures).
FOR YOUR SAFETY
DO NOT ATTEMPT TO HANDLE, INSTALL, USE
OR SERVICE THIS PRODUCT BEFORE READING Products are provided with this product manual, quality certificate,
THE INSTRUCTION MANUAL.
packing list. Please check the software and accessories along
Failure to read the instruction manual prior to with the product according to the packing list. Be careful not to
performing these actions can lead to serious damage the product.
injury and/or damage.

Check the products as below after unpacking.


Safety notice
This current transformer should be installed within the design Note!
limitations as described on its rating plate and in these Check the product appearance for damage.
instructions. Follow your company's safety procedures.

This product is intended to be operated and maintained by Note!


qualified persons who are thoroughly trained and who Check the software and accessories according to the
understand the hazards involved. This publication is written packing list to ensure they are complete.
only for such qualified persons and is not intended to be a
substitute for adequate training and experience in safety
procedures for this device. Note!
Check if there is oil leakage phenomenon.

WARNING
DETAILED DESCRIPTIONS OF STANDARD REPAIR Note!
PROCEDURES, SAFETY PRINCIPLES AND SERVICE Check if the product marking are clear and correct.
OPERATIONS ARE NOT INCLUDED. IT IS IMPORTANT TO
NOTE THAT THIS DOCUMENT CONTAINS CERTAIN
WARNINGS AND CAUTIONS REGARDING CERTAIN Note!
SPECIFIC SERVICE METHODS THAT COULD CAUSE The double-ratio product is delivered from factory with
PERSONAL INJURY TO SERVICE PERSONAL OR COULD parallel inter-connection wiring; check if the wiring is
DAMAGE EQUIPMENT OR RENDER IT UNSAFE. PLEASE correctly connected.
UNDERSTAND THAT THESE WARNINGS CANNOT COVER
ALL CONCEIVABLE WAYS IN WHICH SERVICE, WHETHER Lifting the instrument transformer
OR NOT RECOMMENDED BY ABB, MIGHT BE PERFORMED The current transformer shall be hoisted with lifting rope that can
OR POSSIBLE HAZARDOUS CONSEQUENCES OF EACH stand its weight (Figure 5 Product lifting), then install it vertically on
CONCEIVABLE WAY, NOR COULD ABB INVESTIGATE ALL a horizontal base, and rigidly fix it to the base by bolts through
SUCH WAYS. ANYONE USING SERVICE PROCEDURES OR mounting holes at the bottom of the product. P1 and P2 terminals
TOOLS, WHETHER OR NOT RECOMMENDED BY ABB, are concatenated in AC circuit. The secondary cable should be
MUST THOROUGHLY ENSURE ONESELF THAT NEITHER put into the cartridge at the bottom of the secondary junction box
PERSONAL NOR EQUIPMENT SAFETY WILL BE and reliably connected to the secondary terminals to the
JEOPARDIZED BY THE SERVICE METHOD OR TOOLS corresponding measuring and protective instrument. Product
SELECTED. grounding shall be reliable. The earthing terminal of primary
winding shall be grounded reliably.
All information contained in this manual is based on the latest
product information available at the time of printing. The right
is reserved to make changes at any time without notice.

08 LB7 40.5-300 | Oil current transformer (hairpin type)


Caution! Site test
Protection shall be established at the contact points Carry out site test according to IEC requirements; the results need
between the product and the sling during lifting and it is to be compared with the data in the product quality certificate.
strictly forbidden to scratch the surface of the product. Significant differences are not allowed; otherwise further analyses
and judgments are required, informed of us when necessary.

Caution! Test conditions: temperature 10 ~30 , relative humidity not


The inclined angle during lifting shall not exceed 15 larger than 60%.

Caution!
As the center of gravity of the product is relevantly high, Horizontal transport

anti-toppling measures shall be taken during lifting,


storage and installation so as to prevent product damage
and hidden quality problems.

Caution!
Product grounding should be reliable and there should be
no floating potential.

Caution!
Stand up Stand up
Touch point of External conductor and P1, P2 should be
solid and reliable, and contact surfaces should be large
enough.

Caution!
Be careful when installing the product and do not damage
the sealing

Caution!
Open circuit of secondary winding is strictly prohibited
while it's running. Standby secondary winding must be
grounded by short circuiting.

Caution!
When installing external wire, ensure that mechanical load
taken by primary terminal should not exceed the standard
value.

Caution!
The Current Transformer must be placed in the vertical Figure 5 Product lifting
position at least 24 hours before energization.

Oil current transformer (hairpin type) | LB7 40.5-300 09


Installation

Oil sampling Inspection before commissioning


Oil sampling and oil adding shall be done on sunny day. The It should be comprehensively inspected before commissioning.
relative humidity should not exceed 60%. Special attention should be paid to check the reliability of all
electrical connections. Check if the indication of the density meter
Oil sample shall be not more than 150ml every time. When do oil pointer is proper and if the pressure value meets requirements.
sampling, unscrew the cover of the oil drain valve, remove the
rubber cap on the spool and loosen the spool until oil flows out Measure the winding DC resistance, and the difference between
from the oil drain valve, then do oil sampling under sealing the measured value and the factory value should not be greater
condition. After complete oil sampling, screw the spool and cover than 10% (under the same temperature)
it with the rubber cap. Clean it and screw the cover of the oil drain
valve. Please refer Figure 6. At room temperature, measure insulation resistance between each
winding and earth by the 2500 V Meg-ohm meter. And there
If oil level is not visible in the winter, it shall add the same should be no obvious difference between the measured value and
specifications, treated qualified transformer oil. The oil level shall the factory value.
meet the environment requirements. Please contact us when filling
the oil. Check the fastening of the product's anchor bolts.

Current ratio switching Product grounding should be reliable and there should be no
If the product has double ratios, users may obtain their desired floating potential.
ratios by changing the series and parallel connection of the
product. Touch point of External conductor and P1, P2 should be solid and
reliable, and contact surfaces should be large enough.
For example:
If the rated current ratio is 2 750/5 A Open circuit of secondary winding is strictly prohibited while it's
Then the ratio for series connection is 750/5 A running. Standby secondary winding must be grounded by short
And the ratio for parallel connection is 1500/5 A circuiting.

Please see Figure 7 and Figure 8 for current ratio switching.

Figure 6 Oil sampling procedure

10 LB7 40.5-300 | Oil current transformer (hairpin type)


Parallel Series

P2 P1 P2 P1
C2 C1 C2 C1

Connecting plate

P2 C2 C1 P1 P2 C1 C2 P1

Figure 7 Option 1: current ratio switching

Parallel Series

C1 C1
P2 P1 P2 P1
Front

Equipotential Connecting plate


connection piece

C2 C2
P1 P2 P1 P2
Back

Connecting plate

P2 C2 C1 P1 P2 C1 C2 P1

Figure 8 Option 2: current ratio switching

Mount the connecting plate on the primary terminal, see Figure 4 and 5, with M12 bolts and
washers and torque to 70 Nm.

Oil current transformer (hairpin type) | LB7 40.5-300 11


Maintenance

Minimal maintenance is required due to the transformer being Caution!


hermetically sealed. The routine check is proposed as below: Open circuit of secondary winding is strictly prohibited
while it's running. Standby secondary winding must be
- Visual check grounded through short circuit.
- Routine clearance of dusty on surface of
current transformer
- Check oil indictor of expansion bellow. Caution!
Primary terminals shall be free from deformation and the
Clearance operating temperature rise shall be lower than the value
Conductive dust on the external insulation surface shall be specified by the standard.
removed regularly in order to ensure safety operation of the
product.
Caution!
Oil leakage check Acetylene of transformer oil during operation shall not
Oil leakage shall be not allowed during the operation. The oil shall exceed 1 10-6 ( L/L).
be roughly in line with the marking. If leakage is found, take
effective measurement and inform the factory timely.
Caution!
Routine check oil level indicator compared with neighboring Whether has oil leakage? Whether oil level indictor is in
product. If abnormal issue happened, please find out the reasons the normal range?
or even quite operation.

Oil sample Caution!


Routine check oil sample and do analysis including power losses, External insulation maintenance should be performed
chromatography and micro-water content of transformer oil. If the carefully to avoid damage.
acetylene in the transformer oil is more than 1 10-6 ( L/L),
operation should be stopped immediately and inform the factory
timely. Caution!
Product grounding should be reliable, floating potential
Patrol inspection shouldn't appear.
It is recommended to have routine patrol inspection.
Overhaul
During high and low temperature, high moisture, abnormal Minor maintenance shall be conducted once every 1-3 years,
climates, as well as in period of peak load, seasonal high voltage, generally in combination with preventive test. The minor
equipment abnormality, patrol shall be strengthened. maintenance cycle for products working at high pollution places
should be shortened.

Overhaul shall be conducted when necessary based on


comprehensive analysis and judgement according to preventive
test results of transformer and on-line monitoring results in running
(if any). Inform the manufacturer if necessary.

Temporary overhaul shall be performed for serious defects found


during operation.

12 LB7 40.5-300 | Oil current transformer (hairpin type)


Troubleshooting

Note! Transformer secondary circuit open circuit processing:


In case of abnormal indication on expansion bellow during According to relevant provisions on the relay protection and
operation, take oil sampling and proceed automatic device, exit from relevant protection.
chromatographic analysis. Stop operation of product if
necessary. Find out the fault point and try to make it short circuited at the
terminal near the open circuit under the premise of ensuring safety
but no fuse. If open circuit couldn't be eliminated, power should
Note! be cut for handling.
If there is abnormal sound during operation, please check
whether secondary windings are open-circuited.

Note!
If the external insulation flashover, its external insulating
surface should be cleaned.

Note!
In case of transformer overheating, check for overload
operation or if terminals are in good contact and secure.

Note!
In case of reduced insulation resistance of the transformer,
check whether its surface is wetted or polluted.

Note!
If the transformer is on fire cut off the power immediately
and put out the fire using fire extinguishers.

Oil current transformer (hairpin type) | LB7 40.5-300 13


Product information

Please refer to Figure 9 for product outline and installation drawings.

Note!
Current transformer is customized product, dimension may adjust upon varies rating and configuration. Detailed drawing please
refer to project drawing.

Please refer to the nameplate of the product for weight etc. information.

Dimension
LB7-245
LB7-40.5 LB7-72.5 LB7-126 LB7-145 LB7-170 LB7-300
LB7-252
1875 1915 2390 2430 3060 3700 3950
A
1805 -- 2310 2660 2980 3620 3870
1430 1420 1905 1960 2545 3110 3340
B
1420 -- 1825 2205 2465 3030 3260
650 735 815 815 1020 1050 1050
C
650 -- 735 735 940 970 970
D 258 475 475 475 475 610 610
E -- -- -- -- -- 450 450
F 18 18 18 18 18 25 25

Note: Above are typical dimension, dimension may adjust upon varies rating and configuration.
All dimensions are in mm LB7-245, 252, 300 1
2

LB7-170 1
2 3
P2 P1

4
P2 P1 3
LB7-72.5, 126, 145 1
2 4

LB7-40.5 P2 P1 3
1
2
A 20
A 20

3 4
B 20

P2 P1
B 20

4
A 20
B 20
A 20

5
B 20

6 5 5 5
6
7 6
C

7
C

8 6 7
C

7
C

8 8
8 9
9
9
258 258
9
D D 4 F D D 4 F D D 4 F D E 4 F

1 2 3 4 5 6 7 8 9
Expander Oil-level indicator Primary terminal Bushing Lifting piece Oil tank Secondary terminal box Nameplate Wiring board

Figure 9 LB outline and installation drawing

14 LB7 40.5-300 | Oil current transformer (hairpin type)


Customer notes

Oil current transformer (hairpin type) | LB7 40.5-300 15


Contact Us

TECH-WI-2713 REV.1
ABB Jiangsu Jingke Instrument Copyright 2015 ABB. All right reserved
Transformer Co., Ltd.
Note: We reserve the right to make technical
Add.: No.9 Gucheng Road, Su-Su changes or modify the contents of this document
Industrial Park, Suqian, Jiangsu Province, without prior notice. With regard to purchase
orders, the agreed particulars shall prevail. ABB
223800, P.R. China does not accept any responsibility whatsoever for
T e l : +86 527 8288 0810 potential errors or possible lack of information in
Fax: +86 527 8288 0868 this document

We reserve all rights in this document and in the


www.abb.com.cn subject matter and illustrations contained therein.
Any reproduction, disclosure to third parties or
utilization of its content - in whole or in parts - is
forbidden without ABB's prior written consent.

Das könnte Ihnen auch gefallen