A8 Supply and Laying of 2C x 1 Speker Cable in Existing 25mm dia. PVC 200 Mtrs.
conduit ( Speker Cable )
A9 Supply & laying of 3+1 CCTV Camera cable in Existing 25mm dia. PVC 200 Mtrs.
conduit
A10 Supply & laying of RG6 cable in Existing 25mm dia. PVC conduit 100 Mtrs.
A7 Supply and installation of 200 x 50 x 1.5 thickness GI Perforated Cable 57.5 Mtrs.
tray with 8 MM Threded Rods hanging arrangment
B CABLE CONNECTIONS & TERMINATIONS
B Supply, Connections & Termination of Medium voltage PVC insulated
cables as per the specification & instruction of Engineer-in-charge. The
unit rate shall include supply & connection of adequate size single
compression type brass cable glands and tinned copper / AL. lugs
including cutting/stripping of cable insulation, fixing of cable glands,
crimping the lugs,PVC insulated tape and all other material required.
C1.7 One Exhaust Fan point control by one switch without plug. Mains to be 1 Nos.
considered in Runnig Meter & Off wiring shall be 5Mtr.
C1.8 6A plug point controlled by one switch on switchboard. Mains to be 5 Nos.
considered in Runnig Meter.
C1.9 Primary 6A plug point controlled by one switch at separate location. 5 Nos.
Mains to be considered in Runnig Meter.
C1.10 Secondary 6A plug point controlled by one switch at separate location. 5 Nos.
Mains to be considered in Runnig Meter.
C2 PLUG POINT WIRING
C2 Supply, Installation, Testing & commissioning of 6/16A Plug point as per
specification, drawing and as per instruction of Engineer-in-charge.6/15A
universal plug point controlled by one 16A switch on switchboard es in
25mm dia. PVC conduits as a mains from MCBDB to point. The unit rate
shall comprise of universal socket, switch, plate, Box and PVC pipe &
wires.
C2.1 5/15A plug point primary - Mains to be considered in runnig meter. 30 Nos.
C2.2 5/15A plug point secondary - Mains to be considered in runnig meter. 29 Nos.
C3.1 5/15A plug point primary - Mains to be considered in runnig meter. 4 Nos.
C3.2 5/15A plug point secondary - Mains to be considered in runnig meter. 4 Nos.
ELECTRICAL BOQ
SR. DESCRIPTION BOQ UNIT RATE
NO. QTY.
C3 LIGHT FIXTURE INSTALLATION
C3 Installation, testing, Connection & commissioning of Light Fixture as per
specification and drawings.The unit rate shall include supply, assembling,
marking of light fixture at false ceiling or ceiling.( if using additional
supporting then that cost will be extra as per design)
1 Nos.
D2.1 12Way SPN DD DB With 1no.#32A DP ELCB and 10no.#10A SP MCB
D2.2 16A SP MCB 12 Nos.
6Way TPN DD DB With 1no.#63A FP ELCB,3no.#32A DP 1 Nos.
D2.3
MCB,12no.#16A SP MCB
E EARTHING WIRE
E1 8 SWG CU.wire 10 Mtrs.
TOTAL
NOTES
1 Billing As per Site Measurements
2 In Switchboard and there Accessoires we have consider Legrand
( Britzy ),MK ( Blenze ) or equivalent
3 This BOQ made by take a refrence from Drawing so at that exicution
time qty will be increase or decrease up to 30%
4 At the Execution time if we will need or found NT ( Extra Item ) Item
then its rate share sepretly