PENULANGAN PENINGGIAN KEPALA ABUTMENT-A1 & A2 (4 Unit) JEMBATAN SUNGAI RAMPAH

DIMENSI (mm) Unit


DIA. DINSTANCE Total Total Weigth
TYPE Weight Number (PCS) Remarks
(mm) (mm) Lenght (m) (Kg)
a b c d e f (Kg)

H.1 16 195 1,070 640 1.710 1.580 84 225.843 Chemical

H.1a 16 195 1,150 640 1.790 1.580 84 236.409 Chemical

H.2 16 - 12,000 9,460 21.460 1.580 14 474.695

H.3 16 195 1,070 300 1.370 1.580 84 180.938 Chemical


H.4 22 100 800 0.800 2.980 326 777.184 Coupler
H.5 22 100 865 260 865 1.990 2.980 163 966.623
H.6 16 250 860 160 870 1.890 1.580 65 194.700
H.7 16 - 12,000 9,460 21.460 1.580 6 203.441
H.8 16 137.5 12,000 9,460 21.460 1.580 12 406.882
H.9 13 275 50 315 50 0.415 1.040 178 76.746
H.10 25 1000 550 0.550 3.850 19 40.233

Total Titik D13 76.75


252 Titik (1 Unit) 1008 Titik (4 Unit)
Chemical Anchor D16 985.96
Total Titik D19 -
326 Titik (1 Unit) 1304 Titik (4 Unit)
Coupler D22 1,743.81
D25 40.23
D32 -
TOTAL 2,846.75 1 UNIT
TOTAL WEIGHT
ABT -A1 & A2
(4 11,386.99 (KIRI-KANAN)
Unit)
PROGRESS OPNAME :
PEKERJAAN PILE HEAD

Kepada Yh : No. SPMK :


#REF! Tanggal : 11 November 2018
Proyek Jalan Tol PPKA 4A Progress ke- : 1 (SATU)
Tanggal : 11 November 2018

Kontrak Harga Satuan Mandor


S/D LALU
NO DESKRIPSI PEKERJAAN UNIT BOBOT
VOLUME Harga Kontrak PRICE
(%) VOL PRICE

BESI
Type 1 Fabrikasi dan Instalasi pembesian Pilehead Unit 4,634.33
Fabrikasi Pilehead Unit 4,634.33
Type EJ Fabrikasi Pilehead Unit 14,887.00
Fabrikasi Spiral isian tiang pancang Unit 199.50

Lansiran Besi dari Workshop ke STA 11.000 Kali


Lansiran Besi dari Kalimalang ke Workshop
D 13 1500 btg
D 16 360 btg
D 19 780 btg
D 25 80 btg
TOTAL (2)

Prestasi s/d saat ini : Rp (2)


Nilai Kontrak Awal (Exc.PPn) : Rp -
Nilai Kontrak Addendum II :

Tagihan s/d saat ini : Rp (2)

Tagihan saat ini : Rp 98,180 Rencan di tanggal 20 November 2018

Margin (Laba Kotor) Rp 1,370,790,305


1,050,790,304.50 Laba Bersih Estimasi
Perihal :
Pengajuan Prestasi Pekerjaan Mandor Iwan

PROGRESS
S/D LALU SAAT INI S/D SAAT INI
Ket
BOBOT Price BOBOT
Unit Vol VOL PRICE
(%) (%)

3.00 13,903 11,817,550.00


5.00 23,172 19,695,916.67
1.00 14,887 12,653,950.00
27.00 5,387 4,578,525.00
-
40,833 6,124,875.00
- 98,180 ### (2) -

Diajukan oleh,
PT Laa Tansa Utama

Aris Munandar Saputra