EXECUTIVE SUMMARY
1.1 BACKGROUND
LEA Associates South Asia Private Limited, New Delhi, has been appointed by
National Highways Authority of India (NHAI) for ‘Updation of Detailed Project Report
for Project Stretch of National Highway 4A from Km 0.000 to Km 84.120 in the State of
Karnataka’.
1
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
1.3 OBJECTIVES
The upgradation of the existing road to entirely 4 lane is affected by the restriction of
available land due to both protected and non-protected forest patches along the
project corridor. The available RoW (Right of Way) and the proposed sectional width
have been proposed as follows:
The details of the availability of the land as per the present Land Acquisition Plan
have been presented as below:
2
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
On discussion with Client and the representatives of CALA the Consultant came to
understand that there some private stretches within Km 15+400 to 22+000 and hence
proposed some additional land acquisition within the stretch for introducing grade
separated intersections in built-up locations with service roads and for the layout for
toll plaza. The details of the locations of the additional land requirement have been
given in the Drawing Volume II and the final available width of land is as follows:
0+000 14+800 60 60
14+800 16+100 45 45
16+100 16+700 60 60
16+700 17+300 45 45
17+300 18+900 60 60
19+500 20+100 60 60
20+100 22+200 45 45
22+200 27+800 60 60
27+800 30+000 45 45
During the review of the Draft DPR report as presented by the Consultants in various
forums it was recommended by the Client that the single project is to be split up into
two Packages as follows:
A. Package I: Four Laning of Belgaum (Km 0.000) - Khanapur (Km 30.500) Section
of NH 4A in the State of Karnataka.
B. Package II: Two Laning with Paved Shoulder from Km 30.900 to Km 70.800 and
Two Laning without Paved Shoulder from Km 70.800 to Km 84.120 of NH 4A in
the State of Karnataka.
3
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
Based on the available land width, Packaging for the project corridor and the
pavement recommendation the Consultant proposed the following typical cross
sectional widths for the development of the project corridor:
The edge shyness which was initially given 0.25m in the draft DPR was modified to
0.5m as recommended by the Authority. The schematic representation of the Typical
Cross Sections is given in Volume II (Drawings).
Chainage
Sl. No. Packages TCS Type Length
From To
Package I
4
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
To cater the free moving of traffic in major cross roads and reduce conflicts, grade
separated junctions are proposed at some locations. The grade separation is achieved
by provision of VUP (vehicular underpass having a minimum clearance height of 5.5m)
and LVUP (light vehicular underpass having a minimum clearance height of 4m. These
grade separators have been proposed which was not in the initial DPR.
Minimum
Sl. Design Structure Overall width No. of Clear Span / Vertical
No. Chainage type (m) Spans Openings (m) Clearance
(m)
5
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
The Consultant proposed 7.0m service roads to be provided all along the bypass
sections, built up locations and at locations where VUP and LVUP has been proposed.
The locations of the service roads are as follows:
Chainage
Sl. No. TCS Type Length SR Width Side
From To
1 1+100 5+700 TCS 3 4600 7 BOTH
2 7+200 8+600 TCS 2 1400 7 BOTH
3 8+600 9+700 TCS 3 1100 7 BOTH
4 9+700 11+400 TCS 2 1700 7 BOTH
5 11+400 12+600 TCS 3 1200 7 BOTH
6 12+600 13+100 TCS 2 500 7 BOTH
7 13+100 13+700 TCS 3 600 7 BOTH
8 13+700 14+800 TCS 2 1100 7 BOTH
9 16+100 16+700 TCS 3 600 7 BOTH
10 17+300 18+660 TCS 3 1360 7 BOTH
11 19+700 20+100 TCS 3 400 7 BOTH
12 22+200 22+960 TCS 3 760 7 BOTH
13 24+000 24+700 TCS 2 700 7 BOTH
14 24+700 25+600 TCS 3 900 7 BOTH
15 25+600 26+200 TCS 2 600 7 BOTH
16 26+200 26+550 TCS 3 350 7 BOTH
17 27+100 27+800 TCS 3 700 7 BOTH
The project corridor takes off from Km 497.500 of the existing chainage of NH 4 (Pune
– Bangalore Highway). It was studied by the Consultant and recommended by the
Client that there is a considerable amount of local traffic from that location going
towards Belgaum city. For this traffic the state government has already developed a
6
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
six-lane road form this location uoto the city limits. To make the movement of the
main traffic bound for NH 4A unhindered from the city traffic the Consultant has
proposed a VUP (2x 20m) at the start point that Km 0+000. The Bidding Agreement
has been modified accordingly to ensure that the Concessionaire constructs the
grade separated structure along with the approaches and service roads to cater the
traffic movement.
The following bus shelters have been proposed along the project corridor:
7
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
One number of truck lay bye location has been proposed on the project corridor as
below:
The toll plaza at Km 19+200 caters the traffic for the four lane section and the
configuration for each up and down traffic lane consists of 4 nos. of 3.2m lane for fast
traffic + 1 no. of 4.5m lane for extra wide traffic and 1 no. of 3.2m outer lane for slow
traffic / local traffic. The plaza shall be accompanied by a administrative building and
shall comply the specifications of the Four Laning Manual IRC SP 84 – 2014.
At Toll Plazas
8
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
Full width overhead gantry boards shall be provided at the start and end locations of
the project corridor and half width cantilever gantry boards shall be provided at major
junction areas, toll plaza locations etc
The consultant has conducted the following traffic surveys on the project corridor to
project the optimistic traffic growth rates and to finalise the design MSA for pavement
design.
The (ADT) average daily traffic obtained from the 3 volume count locations are as
follows:
Km. 20+000,
Location/ Modes
Ganebail
2 wheeler 5386
3 wheeler 238
Car 1683
Passenge
r Utility vehicle (Jeep, Van) 1169
Vehicles
Mini Bus 114
Standard Bus 363
LCV Passenger 224
Motorize
d LCV Goods 265
Vehicles 2-Axle Trucks 1051
3-Axle Trucks 343
Multi-Axle Trucks (Semi
Goods 207
articulated)
Vehicle
Multi-Axle Trucks
51
(Articulated)
Tractors 9
Tractors with Trailer 33
Cycle 24
9
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
Km. 20+000,
Location/ Modes
Ganebail
Total Number (Both
PCU 13,208
Direction)
PCU/Vehicle Ratio 1.18
Analyzing the ADT and the derived projected traffic at the 3 homogeneous sections
are as follows:
Based on the factors of the heavy rainfall in the region, tractive effects of heavy
vehicles negotiating sharp curves in the ghat / mountainous sections, heavy seepage
and surface runoff flow the Consultant in consultation with the Client opted rigid
pavement for the main carriageway for both four lane section as per the following
layer thickness:
10
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
The rigid pavement composition for the service roads designed for a traffic loading of
10 MSA is as follows:
1.11 STRUCTURES
On review of the plan and profile drawings the following new major brides has been
proposed. The span arrangement for the major bridge at Khanapur Bypass and at
Ramnagar Realignment has been kept as per the initial DPR.
1.11.2 RoB
The Consultant has proposed the following New ROBs on the project corridor:
11
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
Overall
Design Span
Sl. Structure width of
Chainag arrangeme Remarks
No. type structure
e nt
(m)
Steel ROB not yet approved
1 6+620 Composite 16+16 3x20 from the concerned
Girder railway department
GAD approved vide
dwg. No.
Steel 19.240 +
SWR/2016/GAD-
2 23+140 Composite 13.4+13.4 37.240 +
28/ROB@Km.587/200-
Girder 19.240
300/KNP-DUR/LD-
MRJ/NHAI/Sheet 1&2
The span arrangement and the width of the ROBs which are already approved from
the concerned railway department have been kept as it is in the final DRP. The GAD of
the ROB at Km 6+620 and the Approved GADs has been presented in the Volume II
(Drawings).
1.11.3 Culverts
The Consultant during initial reconnaissance inferred that most of the existing culvers
which are generally slab and pipe are in poor condition with severe damages. Hence
the Consultant recommended reconstruction for all the existing structures and the
replacement with new box structures.
The project cost as worked out by the Consultants based on the latest SOR – The rate
for each item has been worked out as per the SOR PW,P & IWTD, North Zone, Dharwad
(2016-17) of Karnataka State is as follows:
ABSTRACT OF COST
S
Description Amount (Rs.)
#
1. Bill No. 1 - Site clearance and Dismantling
1,74,12,488
2. Bill No. 2 - Earthwork
95,60,49,320
3. Bill No. 3 - Granular Sub-Base and Base Course
36,32,02,657
4. Bill No. 4 - Pavement Courses
2,90,85,56,012
5. Bill No. 5 - Culverts
16,82,92,755
12
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
10 A - Toll Plaza
8,77,84,759
10 B - Bus Bay
74,13,530
10 C -Truck Lay Bye
45,76,626
10 D -Rest Area -
10 E -Highway Lighting
4,78,94,902
8,37,36,11,39
Total Construction Cost
0
The consultant after finalization of the Drat DPR presented the same to the Authority
on 20.06.2017 at NHAI Head Quarter, New Delhi (the minutes have been attached as
Appendix 11-1). The following recommendations have been made by the Client and the
Consultants complied accordingly:
Sl.
No Recommendation from Authority Compliance by Consultant
.
13
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
6 Rigid pavement shall be adopted for main The same has been updated in the DPR
carriageway and flexible pavement for
service road/slip roads.
8 Shyness should be made 0.5 m and service The same has been updated in the DPR
road / Slip road width shall be minimum 7
m.
Based on the point no. 3, a joint site visit was conducted with the Project Director,
PIU Dharward for the finalization of the locations of the VUP and LVUPs on 05.07.2017.
The minutes for the joint site visit have been attached as Appendix 11-2 and the
compliances are as follows:
Sl. Comments of Draft DPR during joint site visit Compliance by Consultant
No
.
14
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
3 During the site visit the following service road The locations of service roads have
locations with 7.0m carriageway width has been been incorporated in the DPR.
finalized instead of slip roads:
Sl. From To Side Width
No. Chainag Chainage (m)
e (Km) (Km)
1 0+000 6+500 Both 7.0
Side
15
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
16
DETAIL DESIGN REPORT
Consultancy Services for Updation of Detailed Project Report for
Project Stretch of
National Highway 4A from Km. 0.000 to Km. 84.120 in the State of
Karnataka
The Consultant needs to furnish Draft 3(A) The Consultant has marked the
8 Notification for the additional land requirement requirement for the additional land for
for the project corridor. the project.
17