Terumo Vietnam Factory 3

TOPOGRAPHIC SURVEY

[Sub-Contractor’s Name]

[Document Code/Revision…]

[Name of Work] [Name of Project]


[Sub-Contractor Logo]

Project: Terumo Vietnam Factory 3

METHOD STATEMENT

Topographic Survey
[Document number]

Revision History
Revision Date of issue Purpose of issue (approved/revision)

Submitted by SC [ ]
Name Position Date Signature
Prepared by
Reviewed by
Approved by
Approved by Kajima Vietnam
Checked by Position Date Signature
Design Team Chief Design Coordinator
Engineering Senior Engineering Manager
QA-QC Chief QA-QC
Construction/
M&E
HSE HSE Manager
Reviewed by
Senior Project Manager
Approved by
Project Director
Approved by Client [ ]
Name Position Date Signature
Prepared by
Reviewed by

[ Topographic Survey ] [Terumo Vietnam Factory 3]


[Sub-Contractor Logo]

[ Topographic Survey ] [Terumo Vietnam Factory 3]


[Sub-Contractor Logo]

1. Application Standards
TCVN 9398:2012: Surveying in construction - General requirements

TCVN 9364:2012: High - rise buildings - Technical guide for survey work during
construction

TCVN 9360:2012: Technical process of settlement monitoring of civil and industrial


building by geometrical levelling

TCVN 9399:2012: Buildings and civil structures - Measuring horizontal displacement by


surveying method

2. Introduction
Project was located at Lot 44A+ 44B+ 44C, Quang Minh Industrial Park, Chi Dong
Town , Me Linh District, Ha Noi, Vietnam.