Sie sind auf Seite 1von 1

Document No.

:
Effective Date :
SAMPLING Revision No. :
Page No. :
Prepared by : Revised by : Approved by :

GEOLOGIST AND SR GEOLOGIST

Determine coal interval Record sample ID


Input to sample
A Sample submission list submission sheet
into sample ID Packaging sample with
Sheet table in sample ID in each plastic
(sample list)
Reconciled Log bag
Sheet

NO

EXPLORATION OFFICE
Check and make sure Prepare Lab. Submission Approval Lab.
sample interval with Any YES Revise sample Send sample
Sheet/LSS (sample Submission Sheet
sample list and fill in Correction ? list to Lab.
analysis requisition) for from GeologyMgr.
sample ID Lab.

LABORATORY Receiving LSS and Analysing samples Release Analysis


samples from from exploration Results by email/
exploration
hard copy

YES

DATABASE ADMINISTRATOR

Receive email Any


Input to Format
Daily Lab. Report Correction ? NO END
Quality
/Results

Das könnte Ihnen auch gefallen