Beruflich Dokumente
Kultur Dokumente
A) Improper planning***
B) Extra wide roads
C) Additional thickness of pavement
D) Traffic congestion
A) Trip distribution
B) Trip generation***
C) Modal split
D) Traffic assignment
A) Trip distribution
B) Mode choice***
C) Route assignment
D) Trip generation
A) Activity system***
B) Trip generation & trip distribution
C) Modal split
D) Traffic assignment
A) Diversion curves
B) All-or-nothing assignment
C) Capacity restraint***
D) None of the above
A) Analysis of variance
B) Multiple regression***
C) Category analysis
D) Situational analysis
A) Canals
B) Horses
C) Public buses***
D) Bicycles
E) Subways
Which of the following are the various ways for controlling traffic
A) I and II
B) I and III
C) II, III and IV***
D) I, II and IV
A) I and II
B) I,II and III
C) I,II and IV
D) I,II,III and IV***
Which of the following are the various ways for controlling traffic
A) I and II
B) I and III
C) II,III and IV***
D) I,II and IV
A) Driveways
B) Access roads
C) Parking lanes
D) Frontage roads***
A) Average speed
B) Spot speed***
C) Space-mean speed
D) Time-mean speed
A) Spot Speed***
B) Journey Speed
C) Trip Generation
D) Average Annual Daily Traffic
'Desire Lines' are associated with
The study of the transportation system that meets the travel need
of several people by sharing a vehicle is
A) Mass transportation***
B) Intelligent transport system
C) Passenger transport
D) None of the above
A) Link volume***
B) Link cost
C) Level of service
D) None of the above
A) Safety
B) Aesthetics
C) Mobility***
D) Pollution
A) Efficient, free and rapid flow of traffic with least priority given to
accidents
B) Efficient, free and rapid flow of traffic with fewer accidents***
C) Efficient and rapid flow of traffic
D) Rapid flow of traffic
I. Traffic characteristics,
II. Traffic studies and analysis,
III. Planning and analysis,
IV. Geometric design,
V. Traffic operation,
VI. Road safety and administration.
A) Rural roads
B) Urban roads***
C) Highways
D) Express ways
A) Harvest season
B) Harvest and lean season***
C) Rainy season
D) Summer season
A) Highway engineering***
B) Railway engineering
C) Traffic engineering
D) Harbour engineering
A) Arithmetic method
B) Geometric method***
C) Incremental increase method
D) Harmonic method
A) Inter linked***
B) Intra linked
C) Not linked
D) Depends on the network
A) Channelization***
B) Rotaries
C) Clover leafs
D) Diamonds
A) Traffic flow
B) Traffic Volume***
C) Traffic capacity
D) Traffic Ratio