Sie sind auf Seite 1von 4

1. Muro interior PSMC60 H:2.

50m
CANTIDAD M2 12026 H: 2.90M Abril 27 2016

1. SUPONER TODOS LOS MUROS INTERNOS PISO TECHO


2. NO SE INCLUYE EQUIPO COMO TUBERIA DALMINE,ANDAMIOS,RUEDAS, CANES,TACOS ETC
3. NO SE INLCUYE PROVISIONALES OBRA
4. SE SUPONE TIEMPO DE DURACION X 6MESES PARA 10.000M2
5. LA MARCACION ES POR PARTE DE LA OBRA SOLO PISO
6. NO SE INCLUYE ENSAYOS DE EXTRACCION NI CILINDROS

MAT. PRODUCCION UN TENOR VR. UNITARIO VR. TOTAL


PANEL PSMC 50 M2 0.71 $ 21,510 $ 15,346
PANEL PSMC 100 M2 0.32 $ 27,241 $ 8,623
MALLA L M2 0.63 $ 4,437 $ 2,789
MALLA U M2 0.33 $ 4,691 $ 1,529
MALLA PLANA M2 0.38 $ 3,042 $ 1,154 Precio multiplicador
TOTAL $ 29,442 26497.9582521 $ 2,944

MAT. MORTERO UN TENOR VR. UNITARIO VR. TOTAL


CEMENTO M2 0.50 $ 26,087 $ 12,913
ARENA M2 0.07 $ 45,000 $ 3,240
CAL M2 0.30 $ 7,500 $ 2,228
TOTAL $ 18,381

MAT. FIJACIONES UN TENOR VR. UNITARIO VR. TOTAL


ACERO ANCAJES M2 1.72 $ 1,457 $ 2,513
ALAMBRE DE AMARRE M2 0.15 $ 3,016 $ 452
TOTAL $ 2,965

M.O UN TENOR VR. UNITARIO VR. TOTAL


M.O INSTALACION M2 1 $ 8,803.84 $ 8,803.84
M.O SCRASH M2 1 $ 5,000.00 $ 5,000.00
M.O REVOQUE M2 1 $ 18,000.00 $ 18,000.00
M.O X FUERA CIUDAD M2 0 $ 6,436.06 $ -
TOTAL $ 31,803.84 M.O.T.C $ 53,149

EQUIPO UN TENOR VR. UNITARIO VR. TOTAL


TURBOSOL+CONCRE+OPER M2 0.0174621653 206920 $ 3,613.27
OTROS MENORES M2 0.0349243306 3650 $ 127.47
EQUIPO DE ENCOFRADO M2 7.2118742724 146 $ 1,052.93
TOTAL $ 4,793.68

TRANSPORTE UN TENOR VR. UNITARIO VR. TOTAL


TRANSPORTE PANEL M2 0.0026663063 $ 250,000.00 $ 666.58
TRANSPORTE MATERIAL M2 0.0005820722 $ 120,000.00 $ 69.85
TOTAL $ 736.43

COSTO ADMINISTRATIVO UN TENOR VR. UNITARIO VR. TOTAL


RESIDENTE M2 0 $ 4,250,000.00 $ -
RUBRO X FUERA CIUDAD M2 0 $ 3,330,000.00 $ -
TOTAL $ -

COSTO OPERATIVO UN TENOR VR. UNITARIO VR. TOTAL


MAESTRO+SYSO M2 0.0011641444 $ 2,890,000.00 $ 3,364.38
RUBRO X FUERA CIUDAD M2 0 $ 1,830,000.00 $ -
TOTAL $ 3,364.38
OTROS COSTOS UN TENOR VR. UNITARIO VR. TOTAL
HERRAMIENTA M2 0.0203725262 $ 50,000.00 $ 1,018.63
EPP M2 0.0203725262 $ 50,000.00 $ 1,018.63
POLIZAS M2 0.01 $ 93,523.00 $ 935.23
IMPUESTOS M2 0.01 $ 93,523.00 $ 935.23
TOTAL $ 3,907.71

SUBTOTAL $ 95,393.80 $ 92,449.59


A.I $ 10,493.32 $ 10,169.45
U $ 3,815.75 $ 3,697.98
Valor Total x m2 $ 109,702.87 $ 106,317.02
Valor Total multiplicador $ 106,758.66

VALOR TOTAL $ 1,319,286,768


VALOR TOTAL MULTIPLICADOR $ 1,283,879,607
RESUMEN EVALUACION DEL CONTRATO PALERMO
DESCRIPCION ITEMS CONTRATO REAL UTILIDAD
1. Muro interior PSMC60 H:2.50m $ 1,283,879,607 $ (1,283,879,607)

VALOR TOTAL $ - $ 1,283,879,607 $ (1,283,879,607)


UTILIDAD $ 166,769,808.65

TIEMPO: 7
7 PRIMEROS PISOS PARQUEADEROS
14 PISOS APARTAMENTOS M2: 912 Y H: 2.90M
Cantidades x piso :
PSCM50: 595 M2
PSMC100 : 264 M2
RG1:540 UN
RG2:326 UN
RGU :280 UN 859

PSMC100 3696 31%


PSMC50 8330 69%
RG1 7560 63%
RG2 4564 38%
RGU 3920 33%
TOTAL MUROS EDIFICIO 12026 100%

Anclaje 1/4
Acero 1/4 L=0.50m $ 515
Epoxico para 60 huecos $ 735
Broca 3/8 $ 50
Bomba pera $ 25
$ 1,325

Mano de obra
Suponer 1 piso terminado x semana

oficiales ayudantes rend/sem rend/cuadrilla


Instalacion 1 1 430 420
alineacion 1 1 430 420
scrash 1 1 859 200
revoque 9 9 859 100
preparacion de mortero 2 2 430
transporte y aseo 0 4 430
accesorios y anclajes 1 0
6 9
M.O SIN REVOQUE $ 12,240,000 $ 11,475,000
VALOR TOTAL $ 23,715,000
VALOR M2 $ 13,804

Equipo de encofrado
Suministro para dos pisos - ml : 600
Se requiere 1200ml de tubo para dos pisos
Tubo x 3ml : 413 un
verificacion valor cuadrilla
1.02
1.02
4.30
8.59