JOB TITLE: Upgrade RMWT Load Center DATE: NEW

Installation of Fire Alarm System 23-06-2013


JSA NO. 001 REVISED
TITLE OF THE PERSON WHO DOES Site Manager: ANALYSIS BY:
THE JOB: Amiel Dionio
COMPANY/ORGANIZATION: PLANT/LOCATION: DEPARTMENT: REVIEWED BY:
Rod Mill
Hani Dalupang
REQUIRED AND/RECOMMEDED APPROVED BY:
Always wear hand gloves during lifting and installation works. Daily tool box meting on site is
required before start to work and shall be attended by permit issuer or client representative.
Proper coordination required with the end-user for any activity to be performed. Only competent
persons shall work on this project.
All activities should be performed under a valid work permit signed by the permit
issuer after joint inspection with the permit receiver. During installation, that copy of JSA
shall be attached to every work permit and shall be displayed on site until duration of work.
Employees shall work out only the scope of work mentioned in the work permit.

SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARDS RECOMMANDED ACTION OR


PROCEDURE

1.Safety orientation 1. Lack of information 1. Management Support


2. Lack of communication 2. Safety orientation by end-user is required
to understand the hazards and risk at work
places.

2. Permit Receiver 1. Not certified employee 1. Only certified permit receiver shall open
2. No joint site inspection by permit issuer work permit.
and receiver. 2. Permit issuer and receiver must perform
3. Incomplete information written in the join site inspection before signing the work
work permit. permit.
3. Complete information required to be
written clearly in the work permit.

3. Scaffold erection in places with 1. Not inspected/no scaffold tag 1. Certified/ competent person to erect the
work at height and use of ladder 2. Fall scaffold.
2. Scaffold collapse 2. Scaffold has to be inspected and certified
3. Electrocution by certified inspector/supervisor and place
4. Bad Planks
5. Not inspected ladder green tag before using.
3. Use only scaffold with green tag.
4. Wear completes PPE. Body harness to be
worn and 100% tie off while at platform.
5. Ladder has to be inspected before use
6. Secure both ends of ladder before use.
7. Entry point of scaffold and ladder must
be clear from any obstruction.

4. Unloading of materials near site 1. Injury 1. Obtain permission from end-user for area
work. 2. Slippage to use for temporary storage of equipments
3. Damage to properties and materials.
4. Miscommunication 2. Wear suitable PPE while unloading is
going on.
3. Wear leather gloves when carrying sharp
edges materials.
4. Avoid passing under suspended load.
5. Barricade the stored materials and put
signage.

5. Installation of conduits that 1. Damage to cable wires. 1. Use the right tools for the job.
includes drilling and cutting work by 2. Hands and finger injury 2. Inspect all tools and equipment with color
hack saw. 3. Fall from height code.
4. Dust 3. Use proper PPE.
5. Flying objects 4. Removal of any combustible materials in
6. Electric shock the area for at least 11 meters radius.
5. Provide Certified fire watch complete with
fire protection equipments
6. Installation of cable wire 1. Damage to cable wires. 1. Only competent person to do the
2. Hands and finger injury installation.
3. Fall from height 2. Wear full body harness and 100% tie off
4. Dust when on height
5. Flying objects 3. Wear suitable PPE while doing the work

7. Installation of fire alarm and 1. Damage to property 1. Only competent person to do the
detection device and accessories 2. Hands and finger injury installation.
3. Fall from height 2. Wear full body harness and 100% tie off
4. Dust when working on height
5. Flying objects 3. Wear suitable PPE while doing the work

8. Termination of cable wires to the 1. Damage to property 1. Only competent person to do the
device. 2. Hands and finger injury installation.
3. Fall from height 2. Wear full body harness and 100% tie off
4. Dust when on height
5. Flying objects 3. Wear suitable PPE while doing the work.
Only competent person to do the
termination to avoid damage

9. Housekeeping everyday 1. Slip/trip 1. Proper housekeeping every time.


2. Fall at the same level 2. Proper arrangement of materials.
3. hands and finger Injury 3. Wear suitable PPE especially hand gloves.

10. Work permit 1. Violation when returning late. 1. Close/Renew the permit on time
2. Do not return the permit on the following
day.
3. Always close the permit on specified
schedule.