Attendace Reg.

Questions

SUMMARY
1. There are ______________ in the way designers
and contractors are selected by the owner.
Designers are selected _______. Contractors can be
selected based _______, but in publicly funded
work, they are often selected through
_________________________.
2. The ___________ starts with the _____________
and completes when the ______________________.
3. The bid package, made up of _____, _______,
______ and ______ conditions, and _______ form,
defines the project requirements, including both
what is to be _________ and the legal ____________
between the ______ and contractor.
4. Many contraction owners have standard ________
and standard ____________ that they use
repeatedly on their projects (SA GCC 2014).
5. Contract changes during construction are made
through the use of __________. The _______
process is the source of _____________.
6. Unethical and illegal bidding practices such as
______ and _______ do occur. These activities carry
heavy ________ and ____________. All contractors
must _______ them.