Muller & Phipps Pakistan (Pvt.) Limited referred to in this document as M&P, agrees that the information
in this document shall not be disclosed outside the recipient’s organization and shall not be duplicated or
used in whole or in part for any purpose other than to evaluate this document.
InfoTech Private Limited, referred to in this document as (InfoTech), is eager to discuss any aspect of this
document or other services that may be needed by M&P to support their information requirements. Any
issues or queries arising should be addressed to:
Jahangir Khan
Key Accounts Manager
InfoTech Private Limited
First Floor, Ebrahim Alibhai Tower, Shahrah-e-Faisal
Tel: +92.21-111.427.427
Cell: +92(0)311-3991142
Email: jahangir.khan@infotechgroup.com
This Technical Proposal has been written for the use of M&P. Whilst every care has been taken to ensure
that the contents of this Technical Proposal are complete and realistic, InfoTech reserves the right to
change or withdraw the document in the light of further information on M&P specific requirements.
General Statement
All the information, representations, statements, opinions and proposals in this document are correct and
accurate to the best of our present knowledge but are not intended (and should not be taken) to be
contractually binding unless and until they become the subject of separate, specific agreement between
the parties.
The information contained herein has been prepared on the basis that the agreement entered into
between the parties as a result of further negotiations will be based on the terms of the InfoTech
Customer Agreement.
If not otherwise expressly governed by the terms of a written confidentiality agreement executed by the
parties, this proposal contains information which is confidential to InfoTech and its subsidiaries and is
submitted to M&P on the basis that it must not be used in any way nor disclosed to any other party, either
whole or in part. The only exception to this is that the information may be disclosed to employees or
professional advisors of M&P where such disclosure is on a need to know basis and is for the purpose of
considering this proposal. Otherwise disclosures may not take place without the prior written consent of
InfoTech.
We are confident that we offer the best and most timely business approach to meet Muller &
Phipps Pakistan (Pvt.) Limited requirements now and well into the future. Our solution brings
much needed functionality that satisfies Muller & Phipps Pakistan (Pvt.) Limited immediate and
future requirements.
Our approach provides the ability for Muller & Phipps Pakistan (Pvt.) Limited to achieve its key
business goals and objectives as well as achieve significant improvement in asset utilization,
inventory optimization and overall enterprise efficiency by:
• Advancing your enterprise systems from your current infrastructure to a new business
infrastructure through an integrated suite of modules that enables global business
visibility.
• Fulfilling the requirements of a global enterprise through the use of multi-site
performance management, multi-organisation, multi-lingual and multi-currency
functionality within a tightly integrated software solution.
• Establishment of an Enterprise level performance management and analytics platform
that enables a culture of management by facts and management by exception.
The proposed solution is poised to deliver significant value add to Muller & Phipps Pakistan (Pvt.)
Limited in the following ways:
• Decrease administrative costs through self-service & process automation.
• Reduce paperwork and manual processes through automation.
• Implement and adopt standard globally accepted business policies.
• Provide global reach of a single global foundation.
Muller & Phipps Pakistan (Pvt.) Limited will gain a complete business methodology that includes
integrated, industry-leading products combined with award-winning support services. Oracle values
our relationship and welcomes the opportunity to provide Muller & Phipps Pakistan (Pvt.) Limited
Oracle Cloud is the industry’s broadest and most integrated public cloud. Oracle Cloud helps
organizations drive innovation and business transformation by increasing business agility,
lowering costs, and reducing IT complexity.
As requested, we have provided you with a solution covering all your needs for:
1. Financials
a. General Ledger
b. Accounts Payable
c. Accounts Receivable
d. Bank / Cash Management
e. Fixed Assets
2. Purchasing (Procurement)
3. Inventory Management
All the above shall be covered by Oracle process flows of Financials. We provide you a solution
that is modern, complete, adaptable, integrated and secure.
Using the Oracle Cloud, you get a unified environment providing flexible Cloud infrastructure, a
powerful standards-based platform, and a comprehensive portfolio of business applications — all
on a subscription basis. Backed by 19 worldwide data centers, an army of Oracle – Badged security
experts and a round the clock monitoring and support, Oracle provides the assurance you need
to ensure your data is safe.
1.3 Conclusion
• InfoTech is proud to offer this proposal to Muller & Phipps Pakistan (Pvt.) Limited. We are
confident that our proposal includes the software and services necessary for Muller & Phipps
InfoTech is a premier IT Systems Integrator with capacity and experience for providing strategic
technology solutions that achieve real business results for businesses. Founded in 1995, Info Tech
is at the forefront of revolutionizing the information technology arena by providing the best
products and services to a wide range of industries and enterprises. The company’s strategy which
is elucidated by a determined and compelling focus on convergence and innovation, strives to
establish InfoTech as a synthesized speculator and benchmark for new IT services globally.
InfoTech is a truly global company, executing business in several countries through three of its
own subsidiaries, InfoTech Middle East FZ-LLC, UAE, InfoTech Global PTE LTD, Singapore and
InfoTech Africa Limited, and developing technology that affirmatively impacts businesses all over
the globe.
The world of information technology is changing rapidly. Rapid information dissemination and
other forces create an ever-changing environment. This environment makes it difficult for the
traditional organizations and companies, even armed with the best in commercial technology, to
deliver consistent, accurate and up to the mark solutions. Our leading-edge solutions allow us to
develop incomparable products and services and provide high-end consulting, design,
optimization and provisioning of IT infrastructure to various enterprises around the globe. Our
philosophy allows us to build meticulous and contemporary predictive business models and an
analysis of the behavior of financial markets.
True to its motto, InfoTech aims at consistently ensuring that the solutions are brilliantly built to
enable customer’s sustainability. Industry specific work procedures and methodologies,
technologies, domain expertise, tools and training are the company’s forefront. We aspire to draw
on this substantial substructure to create visible business impact for clients around the globe,
resulting in long-term relationships. We understand our client's business realities and have the
know-how and solutions needed to advance their business goals. Consistent year-on-year growth
of over 35%, during last decade, shows confidence of our customers that our engagement with
them is based on long term “Technology Partnership”, and not just on transactional business.
A key InfoTech strength is its ability to successfully manage Enterprise level Information
Technology projects. We have years of experience of working with multiple subcontractors and
specialize in large complex Systems Integration activities. In addition to the above, below is a brief
summary of InfoTech strengths and track record as a Systems Integrator:
InfoTech is committed to keeping the customer’s interest first by being vendor agnostic and
cultivating partnerships with leading global technology manufacturers. We are partner of
choice for global IT giants including but not limited to the following:
IBM
Oracle
Microsoft
CISCO
McAfee
Barracuda
Computer Associates (CA)
Fortinet
Emerson
Detailed information regarding InfoTech can be found in in our company profile in Annexure A
and on our website www.infotechgroup.com.
3.7 Training
Training has been identified as a critical activity for the project, and we have recommended a
“Train the Trainer approach” which has been further detailed out in Training Plan Section.
We have proposed an aggressive time frame of Four Months for the solution implementation at
M&P Head office at Karachi. A further detailed breakup of the project Implementation schedule
is provided in a subsequent section.
The comprehensive end-to-end technology services and solutions offered in this proposal will
allow M&P to:
• Leverage technology to meet specific business needs and goals of M&P by offering unique
and superior service to its customers
• Achieve more efficient and effective operations by gaining a clear picture of strategic
options and act as a catalyst for M&P’s service improvement goals
• Reduce costs, minimize risk and better leverage available resources
• Maximize value derived from technology solutions
• Reduce redundant processes by maximizing value derived out of innovative leading-edge
technology investments
• Leverage the Core Competencies of our partnership
In short, InfoTech will be a one window solution provider assisting M&P fulfill end to end Solution
for Implementation Oracle Financials Cloud seamlessly. Our people, partnerships, and proficiency
in tools and methodologies utilization are the core strengths and the factors that differentiate us
from other IT service organizations.
The methodology combines the best of features of both on-premise implementations and
cloud-based ones. The methodology is a guidebook, similar to a roadmap, which will allow
our clients to tailor the methodology content to their business requirements. Much like
the diagram below, the methodology is sequential in nature, but flexible as well, and
overlaps may exist due to client requirements and/or project timeframes. The
methodology explains each and every phase of implementation in terms of the purpose,
overview, objectives, entry criteria, activities, deliverables and the milestone/exit criteria.
5.2 Deliverables
Phase Deliverables
• Project Charter
• High-level Project Plan
• Workshop plan for Analysis and Design
Plan • Project Organization Chart with defined Roles & Responsibilities
• Sample Deliverables Formats
• Change Management Strategy
• CRP Plan
• Configuration Design Document
• Custom Interface and Reporting Design
Analysis and Design
• Unit Test Plan
• Training Plan
• Complete configuration, development and Unit Testing
Develop, Configure and • System Test Plan
Prototype • Updated System Configuration Document
• 1 prototype session and summary report
• Completed system testing report
• Completed UAT report
Test • Training Materials (soft copy)
• User Training
• Go-Live Cutover Plan
• Application Go-Live
Go-live • Project Closure report
• Post Go-Live Issue Tracking Reports
Mapping
Data mapping is the process of mapping the old data elements in the existing systems to
the data elements in the new system to decide which data is:
• To be transferred / translated / converted
• Redundant
• New and must be created by assigning proper value
• To be verified / balanced / reconciled
The detailed mapping document will be created for each module and would be used in
designing the conversion programs.
Conversion Programs
Note – The following abbreviations are used in the responsibility matrix documented for
every phase.
BA Business Analyst
InfoTech M&P
Activity
PM TC FC PM BA LSS
Functional Study R R R PA (100%) PA (100%)
• Appoint a Single Point of Contact & Teams • Appoint a Single Point of Contact
as per requirements of Project (SPOC) & Teams as per Project
requirements
• Ensure Key Stakeholders participate in the
Weekly Status calls and Governance Calls. • Ensure Key Stakeholders participate
in the fortnightly status calls and
Common/ • Raise timely concerns, queries or issues
Steering Committee meetings
affecting project schedules and quality of
Overall
deliverables to M&P • Facilitate timely resolution of queries
and issues raised by InfoTech so that
• Incorporate review feedback / comments
from M&P ’s into technical and non- overall timeline is not impacted
technical artifacts • Provide timely review feedback /
comments to InfoTech on its
deliverables
Issue
Onsite POC
Document
open
Escalate to Program
Issue Open or Closed
Manager
Resolved
Document
We are also available to meet with key M&P representatives upon request, or whenever our
program needs to be evaluated.
Business Reviews that address M&P agreed upon performance parameters are prepared and
distributed periodically (i.e., quarterly) for client review. Data is collected from a variety of
sources, including in-person assessments at on-site locations. A typical agenda included within
the completed client Business Reviews, which can be segmented by geographic or business
delineations, may cover the team performance, project timeline, cost variance if any, issues and
risks.
Solution Timelines
Implementation of Oracle Financials – Cloud identified in section (3)
Five Months
including One Month Support
• Training document
Training InfoTech M&P
• Standard Operating procedures
• Test scripts
Testing InfoTech M&P
• Test Report
• Issue log
Post Go Live support InfoTech M&P • System hand over report
• Project close certificate
• Support refers to ensuring that whatever version has been provided at ‘go-live’ runs
without any issues or bugs. It will not cover support of any NEW modules, New
Functionality, New Development, New Reports. However these can be supported as a
chargeable activity and shall be managed through Change Request.
• Deviations from Scope: Any deviations in the scope and approach stated above would be
considered as a Change Request.
• Implementation or Configuration of any other Application or Oracle Modules apart from
what is listed in 8.1.
• Support and training for any new locations and/or any new users of M&P which come up
during the support period.
• Re-training, or ‘refreshers’ for already completed training / users
• Application upgrade with respect to maintenance pack and release upgrade will be out of
scope and can be done through Change Request.
• Data Entry of any kind
• Report Generation and Printing
• Business Process Reengineering: Support does not cover streamlining the existing
systems and procedures in the functional areas through a process re-engineering study.
• Data cleansing and Data Migration
• Setup and deployment of new Application / modules.
• Hardware (PC, Workstations, Laptop) Support Warranty
• Development of Technical / User Manuals
• Any required hierarchies e.g. Location, Organization etc. shall be provided by M&P in
format provided by Implementation project team.
• Provision of clean history in Implementation project team provided format shall
be responsibility of M&P.
• The scope detailed in this proposal, consisting of all timelines, deliverables, and
associated consulting days for the implementation engagement will be confirmed
by the entire project team during the Project Initiation Phase.
• The proposed Software, Database, Infrastructure and adequate Storage for Test
Environment purpose should be provided maximum of two (02) weeks from the
start of the project. Late provision shall have appropriate effect on timelines.
• The proposed Software, Database, Infrastructure and adequate Storage for
Production Environment purpose should be provided two (02) weeks before
completion of the Build Phase. Late provision shall have appropriate effect on
timelines.
• Business Process Owners will be accountable for signing off on processes as the
sole responsibility of M&P.
• Accurate and current documentation of M&P’s information systems, including
platforms, applications, details of existing interfaces, and physical architecture will
be provided by M&P at the start of the project.
• M&P will provide resources to assist implementation team understand all the
legacy systems, extract programs and files, and will deliver said programs/files in
accordance with project work plans that will be finalized prior to the beginning of
each major project phase.
• Implementation team resources will be given access to the necessary
development and production environments per timing to be outlined in the
project work products.
• All M&P key team members must be in place on the targeted start date. This will
be agreed to the staffing plan and roll-on schedule to be approved prior to project
launch.
• M&P resources will be made available for interviews, meetings, workshops and
consultation as necessary.
• Members of the M&P project team will have the ability and authority to make
timely decisions and commitments on the enterprise-wide design for their
respective lines of business.
• M&P project team personnel will possess the requisite business or technical
knowledge skills to perform the work outlined in the project plan, which will be
mutually accepted by M&P and Info Tech.
• M&P project team will provide interface description, data structure details and
applied business rules for all the source systems.
• M&P will adopt a timely and effective issue resolution process such that any and
all issues can be resolved within five (5) working days of being identified. Critical
11.5 Dependencies
InfoTech expects M&P to have the following basic facilities at all time:
• The support project initiation will require a lead-time of Four (4) weeks, from the date of
receipt of purchase order, to mobilize project resources.
• Active Software Maintenance with Oracle.
• M&P will assign a Project Manager as SPoC (Single Point of Contact) to co-ordinate all the
requirements during the Support period
• InfoTech’s resolution timelines and priority levels will only become applicable after the
3rd party hardware, software, equipment, services and application or system involved
has been rectified.
• Any issues that require M&P’s intervention, agreement or comments will require prompt
response from M&P within 24 hours. Any delays on part of M&P to provide such
responses will affect the resolution timelines and InfoTech will not be responsible for such
delays and the associated delays
• Any delay in resolution of issue/problem escalated to OEMs Support will not be
categorized as delay of InfoTech.
• M&P will make suitable arrangements for remote access to the Development, Test and
Production environments. Availability of such access is key to ensure smooth support
services. Absence of such access could sometime lead to delay in resolving issues, if any,
where help from remote site is required.
• M&P will be responsible for coordination with third parties involved in this project, if any,
InfoTech is not responsible for activities conducted by third parties directly engaged by
M&P.
• M&P will provide following infrastructure items to support staff;
o Office space, telephone lines for local and inter-office calls, fax/copier machines
““Keeping in view the Project requirements, CVs of resources are provided below for
reference purposes. The description below indicates the knowledge, skills and
experience required for the Project. The résumés provided are to illustrate the caliber of
staff which would be assigned to the project. However, please note that finalization of
resources would be undertaken upon awarding of contract subject to their availability. In
case the resources have been assigned to other projects, they would be replaced with
suitable alternative resources of comparable experience and qualification”
o SCM
Inventory
Purchasing
Order Management
o Oracle HRMS
Core HR
Payroll
SSHR
email: mhabuhijleh@mopa.ae
URL : www.mopa.ae
Duration of Assignment: Start Date: Completion Date:
9 Months Oct, 2011 Jun, 2012
Description of Actual Services Provided by InfoTech Staff:
InfoTech is the Implementation Partner of SSGC and has played a significant role of
deploying the e-Business Suite across its business.
SSGC has gone through the transformation of its people, processes and technologies and
InfoTech has helped it through the change process.