FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

EMPLOYER : FARABI YANBU PETROCHEMICALS COMPANY

PROJECT : FARABI NORMAL PARAFFIN AND DERIVATIVES COMPLEX

LOCATION : YANBU, SAUDI ARABIA

EPC CONTRACTOR : L&T HYDROCARBON ENGINEERING

DOCUMENT
ISSUED FOR CATEGORY APPROVAL CODES
(USE TICK MARK)

[CODE 1] REJECTED
Revise and Resubmit.

[CODE 2] COMMENTS AS NOTED


Work may proceed subject to compliance with and
incorporation of comments.

[CODE 3] NO COMMENTS
Work may proceed.

[CODE 4] INFORMATION ONLY


Accepted for information only.

EMPLOYER Approval
Date ( DD-Mmm-YY)
Signature
Code

This approval does not absolve the CONTRACTOR from meeting


their contractual obligation of delivering a complete, safe and
efficiently operating unit/facilities meeting all requirement of the
contract

01B 10-Nov-17 Internal Issue PPJ NK RHD SC KMS

01A 10-Oct-17 Internal Issue PPJ NK RHD SC KMS


Issued for Review
01 25-Sep-17 PPJ NK RHD SC KMS
(IFR)
Date PREPARED REVIEWED APPROVED REVIEWED APPROVED
Rev DESCRIPTION
DD-Mmm-YY BY BY BY BY BY
ALL RIGHTS RESERVED
THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF L&T HYDROCARBON ENGINEERING (L&T HE) AND THE
COPYRIGHT THEREIN IS VESTED IN LTC NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR
USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF L&T HE.

Page 1 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

TABLE OF CONTENTS
Sr. No. Section Page No.

1. INTRODUCTION 3
2. COOLING TOWER BASIN DIMENSIONS & DETAILS 4
3. SCOPE OF SUPPLY 7
4. HOLDS 7
5. ATTACHMENT 7

Page 2 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

1. INTRODUCTION

This document is intended to cover basic design data and minimum technical
requirements for Cooling Tower basin (801-TK-01).

The Cooling Tower, 801-ME-01, covered in a separate specification, will be mounted on


a concrete Basin. The dimension of the Basin shall be determined to suit the
requirements and foundation plan, and shall include any required support pillars or walls
within the Basin.

Cooling Tower Basin (801-TK-01) will be divided into sections

Section-1: Cooling Tower Basin

Section-2: Intake basin downstream of sluice gate valve including pump suction bay.

Section-1: Section of cooling tower up to the sluice gate valves and wall shall be
designed by the cooling tower vendor. Section-1 will be divided into compartments
corresponding to the number of Cooling Tower Cells. Sluice gate valves will be provided
for each section in order to be able to isolate it without shutting down the whole system.
Access to each compartment for maintenance shall be provided. Each cell shall be
provided with 4" connections in the bottom of the Basin wall at the lower side of the
Basin to enable sludge removal.

Section-2: The Basin and pump suction bays shall be designed in line with the
requirements of the Hydraulic Institute to prevent vortex formation and cavitation. Two
pump suction bays shall be provided, connected to each compartment via a channel
with sluice gates. The inlet to pump suction bays shall be fitted with trash screen.
Arrangement for removing of trash screen is to be provided. Trash screens shall be
designed and supplied by cooling tower vendor. Each suction bay will be provided with
arrangement for manual cleaning of sludge.

Water make up shall be Raw Water, delivered under level control into the channel.
Chemicals shall be dosed in the channel at a location designed to provide adequate
time for mixing whilst avoiding the overflow. Separate pump suctions shall be provided
Page 3 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

for each pump, the inlet ends being turned downwards and ending in a bell mouth to
minimize vortex formation in the suction lines. Water average velocity at the entry of the
bell mouth shall not exceed 1.7 m/s and the clearance at the bottom of suction bay shall
not be less than half the diameter of the bell mouth.

2. COOLING TOWER BASIN DIMENSIONS & DETAILS


Dimensions
Basin (Section-1: Cooling Tower Vendor Scope)
Length 33210 * mm
Width 9240 * mm
Depth 4050 * mm from top of kerb
Depth 3550 * mm from high water level
MOC Concrete (High sulphates and chlorides resistant type)
(Section-2: Intake Basin LTHE Scope)
Section-A:
Length 33210 * mm
Width 4500 * mm (Hold-4)
MOC Concrete (High sulphates and chlorides resistant type)
Section-B:
Length 18000 * mm
Width 7300 * mm
MOC Concrete (High sulphates and chlorides resistant type)
* For detailed dimensions refer Attachment-1

Screens: 1 per pump suction bay shall be designed and supplied by cooling tower
vendor.

Page 4 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

Details
(A)

PLAN VIEW
ARRANGEMENTS SHOWN FOR 3 CELLS
NOT TO SCALE
ALL UNITS IN mm UNLESS STATED OTHERWISE

Page 5 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

(B)

Note: Level settings are mentioned w.r.t grade level

Note (1): Design of wall between Cooling Tower cell and Cooling tower basin shall be such
that overflow of cooling tower cell will be towards Cooling Tower common basin.
(2): Slope angle will be less than or equal 10 °. This will be confirmed after CFD analysis.
ELEVATION VIEW

(C) Nozzle Details / Summary


Nozzle Service Nozzle Nozzle Remarks
No. Size Quantity
(in)
I1 Makeup Raw Water Inlet 6 1
I2 Filtered Cooling Water 8 1
L1 Level Instrument (Radar) 4 1 With stilling well
L2 Level Instrument (Radar) 4 1 With stilling well
C1~C5 Chemical Dosing ¾ 5 Separate nozzles for
dosing dispersant,
corrosion inhibitor, non-
oxidant/oxidant biocide,
anti-scale agent.
MH1/2 Manhole 2 One manhole per intake
basin. Manhole size to
be decided by Civil.
O1 Overflow 8 1 Overflow from common
bay
D1/2/3 Cooling Tower Basin Drains 4 3 1 drain for each cooling
water cell
D4/5 Intake Pit Drains 4 2 1 drain for each intake
basin.

Page 6 of 7
FARABI YANBU PETROCHEMICALS COMPANY

FARABI NORMAL PARAFFIN AND DERIVATIVES


COMPLEX, YANBU, KINGDOM OF SAUDI ARABIA
DOC. NO – G446-2801-PDS-0140-0002, Rev 01B
PROCESS DATASHEET FOR COOLING TOWER
BASIN (801-TK-01)

3. SCOPE OF SUPPLY
The scope of supply of some of the items identified along with the cooling tower
basin will be as follows:
 Trash Screens: These will be supplied by the cooling tower vendor along with the
necessary mechanism needed for taking it out for maintenance.
 Sluice gates: These will be supplied at each section of the cooling tower unit for
individual isolation of cooling tower section without complete isolation.
 Bellmouth: This will be supplied by the cooling water pumps vendor or by others.
 Vortex breaker: requirement will be confirmed after CFD analysis.

4. HOLDS
1. Width shall be confirmed after receiving vendor data of cooling tower.
2. Deleted.
3. Deleted.
4. CFD analysis result.

5. ATTACHMENT
Attachment-1: Sketch of Cooling Tower & cooling water intake basin.

Page 7 of 7
NOTES:
1. DESIGN OF WALL BETWEEN COOLING TOWER CELL AND COOLING TOWER BASIN SHALL BE
SUCH THAT OVERFLOW OF COOLING TOWER CELL WILL BE TOWARDS COOLING TOWER
COMMON BASIN.
COOLING TOWER AND COOLING WATER INTAKE BASIN 2.
CFD ANALYSIS.
(801-TK-01)

C5

FOR FREE
I2 C3 C4 L2

BOARD
MH2
I1 C1 C2 L1
SCREEN MH1

INTAKE BASIN HIGH


NORMAL LOW
LOW LOW

COOLING TOWER
BASIN

HOLD 4
GRADE GRADE

GENERAL NOTES:

HOLD 4
D1

HOLD 4

HOLD 4
D2 D4 D5
1. DIMENSION SHALL BE OPTIMIZED AND CONFIRMED AFTER RECEIVING INFORMATION FROM
D3 PUMP VENDOR.
HOLD 4
* INCLUDES FOUNDATION OF 340mm FOR PUMP.
SECTION 'A-A'
# 150mm BETWEEN EACH CONSECUTIVE LEVEL.

SLUDGE DRAIN (100 mm) SLUDGE DRAIN (100 mm) SLUDGE DRAIN (100 mm)

HOLDS:
1. WIDTH SHALL BE CONFIRMED AFTER RECEIVING VENDOR DATA OF COOLING TOWER.
2. DELETED.
3. DELETED.

COOLING TOWER FAN-1 COOLING TOWER FAN-2 COOLING TOWER FAN-3 4. CFD ANALYSIS RESULT.

'A'

HOLD 1 HOLD 1 HOLD 1


SLUICE GATE SLUICE GATE SLUICE GATE
HOLD 4

OVERFLOW (200 mm)


SECTION - A SECTION - A

SCREEN SCREEN

SECTION - B SECTION - B

REV. DATE DESCRIPTION

Employer / PMC Approval Document Review Status (by Employer / PMC)

SLUDGE DRAIN (100 mm)

DETAILED ENGINEERING
CENTER:

'A' EPC CONTRACTOR:

PMC

EMPLOYER

FARABI NORMAL PARAFFIN AND DERIVATIVES COMPLEX,


YANBU, KINGDOM OF SAUDI ARABIA
TITLE:
COOLING TOWER AND COOLING WATER INTAKE BASIN
(801-TK-01)
(ATTACHMENT - 1)