HPCL-VRMP -VISAKHAPATNAM
SURFACE PREPARATION AND PAINTING INSPECTION REPORT
Unit : Report No: Date:

AREA/LOCATION:

ITEM: PIPE,PIPE SPOOLS,STRUCTURE,TANK PLATE/TANK

Surface Preparation Method Surface profile required : microns


Shot Blasting/ Wire Brush cleaning/ Temperature : 0
C Hygrometer SI No. : Calib Due Date:

Grit Blasting Power brush cleaning Humidity : % DFTgauge SI No.: Calib Due Date:

Coating Method : Brush Coating Roller Airless Spray Conventional Spray (Air Spray)

Paint Specification Batch No. Mfg.date & Shelf life DFT required IMIR No.

Primer paint

Primer paint
Intermediate
coat
Finish coat

Primer coat Intermediate coat Final Coat


Surface profile
Drg. No./ Line No./Spool No. /Eqp. No./ Str. Shop Field 1 coat
st
2 nd
coat 1 coat
st
2nd coat
Sl.No. Quantity
Mark No.
µ Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ ) Checked DFT ( µ )

E
M PL
SA
REMARKS:
SA
Adhersion test (if applicable) : Acceptable, Not acceptable
Based on visual check, DFT readings, proper color coding & ID mark; painting of above items is accepted.
DESCRIPTION Sub-Contractor EIL/TPIA
Inspector’s name

Signature

Date
Format No:
IMIR No.

t Remarks

2 nd
coat

Checked
TPIA