Sie sind auf Seite 1von 4

ASIF KHAN

ELECTRIAL & INSTRUMENT TECHNICIAN

PROFICIENT SUMMARY:
Having around (10) years of experience in various projects such as execution, installation, third party
inspection in Electrical & Instrumentation in Pakistan, well reputed companies such as A.G.E CABLE
INDUSTRIES.WORK IN MAINTENANCES

PERSONAL INFORMATION:
Father’s Name Hakim Khan
Nationality Pakistani
Date of Birth 29 July, 1982
Religion Islam
Marital Status Married
passport QM4101643

Experience Summary
➢Inspection of Installation of Various Process Control Instruments According To P&IDS, Hook up Drawings
and Location Drawings
➢Loop folder inspection and preparation of documents.
➢Witness Calibration of Various Electronic/Pneumatic Instruments & Verify Against Specification/Data
Sheet
➢Witness on Pressure Test of Instrument Impulse Lines and Instrument air lines.
➢ Witness on Leak Test of Instruments Air Headers Air Sub-Headers and Pneumatic signal Lines
➢Inspection of Instrument Installation
➢Witness of Pressure safety Valve Testing & Preparation of Documents
➢Insulation Resistance Test of Instrument Cables and installation of Instrument Cables, Installation of
Marshalling Cabinets, Consoles, Control Panels, Local Control panels, Analyzer and Junction Box.
➢Instrument Servicing, Maintenance, Calibration & Troubleshooting of All Type of Instruments
➢Preparation of Calibration certificate and instrument loop check record.
➢Verification of instruments and valves, the way which mounted on pipe as per P&ID flow direction,
proper process connection etc.
➢Rectify the punch list items which issued by operation and client.
➢Calibration of instruments as per field parameters using HART communicator, Micro-calibrator,
Temperature & Pressure calibrator and Simulator.
➢Calibration and repair of control valves, ON/ OFF valves including Pneumatic and Electro-pneumatic
positioner.
ASIF KHAN
ELECTRIAL & INSTRUMENT TECHNICIAN
Job description and equipment handled:
Working on various control systems and instrumentation worked include monitoring of instruments control
panel and necessary actions upon generation status report of recorders and controllers.
 Assisted calibration of field of instruments.
 Implementation of instrumentation standard prior on the operation manuals, design and schematic
diagram/drawings.
 Reviewing and finalized all daily reports, work schedules, requirements need such as manpower and
equipment on the job site.
 Maintenance of different Control Loop Instruments
 Troubleshooting and Maintenance of different Computers & Its Peripheral Devices.
 Updating and Preparation for instrumentation drawings Such as ILD, interconnection Drawings
Equipment layouts, Cause and effect, wiring diagram etc.
 Excellent Technical, Documentation & Communication skills.
 Preparation of Loop folders with sub-contractor.
 Write inspection report, Non-Compliance Reports, etc.
 Review inspection waiver request.
 Familiar with the policies for Safety, Health, Environment & Quality Assurance and their relevant
documentation

EQUIPMENT PROFICIENCY

Equipment’s utilized in different field works detail are given below;

Temperature:
Temperature Transmitters, Temax, PT-100(RTD), Thermocouple (J&K) Type, Temperature Gauges, Temp
Switches, and Pyrometers.

Pressure:
Pressure Transmitter (E+H), Pressure Gauges, Pressure Switches.

Level:
Silo Pilot, Navo Tester, Ultra-Sonic Level Detector, Level Switches, Oil Level Switches, Silophant, Radar Type
Level Sensors.

Flow:
Turbine Flow Meter, Magnetic Flow Meter, Rota Meter, Mano Meter, Flow Switches, Feed Control & Flow
Control Loops, Weighing Feeders of Pfister, Motorized Feed Control Gate, Belt Weigher.

ACTUATER & DAMPERS:


Calibration and maintenance of Auma Actuators, Bernard Damper & Actuators, Motorized Control Valves &
Pneumatic Control Valves.
ASIF KHAN
ELECTRIAL & INSTRUMENT TECHNICIAN

Also Worked At Other Different Equipment’s such as:

Proxy Switches, Limit Switches, Wire Emergency Switches, Speed Monitor, Solenoid Operating Valves of various
shapes & types, Shut-Off-Valve, Magnetic Switches, Mill Diaphragm Temp, Pneumatic Cylinder (Buffer, Feed,
Bag Discharge), Air Compressor, Sway Detector & Switch, Kiln Camera (Siemens), Shock Blaster, Vibration
Sensors & Load Cell.

Work experience:
Company : Samcon Industrial Solutions
Project : Instrumentation Work For Building Risk Mitigation Project.
Position : ELECTRIAL & INSTRUMENT TECHNICIAN.
Employment Period : 16 March Till To Date.

Company : Ruwailan General Contracting Est.


Project : Rehabilitate of Marine Berths at Al Muajjiz Terminal.
Position : INSTRUMENT TECHNICIAN.
Employment period : February 2015 To 13 February 2016.

Company : Dragados Gulf Construction Co.Ltd


Project : AL-Khafji Joint Operations
Position : INSTRUMENT TECHNICIAN.
Employment period : February 2014 To December 2014

Company : (SABIC) Petrochemical PLANT.


Maintenance : SAUDI KAYAN.
Position : INSTRUMENT TECHNICIAN.
Employment period : October 2013 To 30 january2014.

Company : SAMSUNG SAUDI ARABIA CO. LTD


Project : MA’ADEN Aluminum Rolling Mill
Position : INSTRUMENT TECHNICIAN.
Employment Period : October2012 to 28 September 2013.

Company : SAMSUNG SAUDI ARABIA CO. LTD


Project : MA’ADEN Aluminum Costen Mill
Position : INSTRUMENT TECHNICIAN.
Employment Period : April 2012 to. 30 September 2012.

Company : AL-SUWAIDI INDUSTRIAL SERVICES


shutdown : PETROCHEMICAL KEMYA
Position : INSTRUMENT TECHNICIAN.
Employment Period : February 2012 to March 5- 2012
ASIF KHAN
ELECTRIAL & INSTRUMENT TECHNICIAN

Company : PETROFAC ARABIA CO. (S.A KENTZ)


Project : SAUDI ARAMCO, KHURZANIA PLANT (K.G.P)
Position : INSTRUMENT & ELECTRICAL Foreman.
Employment Period : March 2011 to 15 January 2012.

Company : OLAYAN DESCON


Project : SAUDI ARAMCO, YAMBOO PLANT (T/A)
Position : INSTRUMENT TECHNICIAN.
Employment Period : 27 January 2011 to 15 February 2011.

Company : S.A KENTZ


shutdown : SHARQ (SABIC) T/A
Position : INSTRUMENT TECHNICIAN
Employment Period : 21 December 2010 to 18 January 2011.

Company : KABBANI COSMA


Project : QASSIM BULK PLANT (SAUDI ARAMCO)
Position : INSTRUMENT TECHNICIAN
Employment Period : JULY 2010 TO DECEMBER 2010

Educational Qualification

2003 D.A. E Diploma in Electrical 2004


Pakistan Peshawar

Declaration

I solemnly declare that the above-furnished information’s are true, correct and complete to the best of my
knowledge and belief.

Place: Saudi Arabia Signature

Date: 30.06.2019 ASIF KHAN

Das könnte Ihnen auch gefallen