Sie sind auf Seite 1von 35

Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampura

Daily Progress Report


S.NO ITEMS DESCRIPTION MANPOWER DEPLOYMENT

BAR
MASON CARPENTER LABOUR
BINDER

1.0 Tower- H

(A) External Plaster(finishing work) 2 - - 3

(B) Internal Plaster 2 - - 2

(C) katai work for internal plaster - - - 2

(D) P.C.C. 1 - - 3

2.0 Tower- G

(E) Materials Shifting - - - -

(F) Tiling Work & Kaccha work also 5 - - 5

(G) R/F Binding For RCC Ledge wall - - 3 0

(H) Shuttering of RCC Ledge wall - 0 0 0


(300mm)

Total:- 10 0 3 15

Note:-
SIGNED BY ALLIANZE SITE
ENGINEER
sh palace,Pitampura.New delhi-110034

MENT LOCATION FLOOR Unit no. WORK DONE UNIT

COOLEE

8 Tower-H 8th to 7th - 12.60 Sqm

Tower-H 5th Stair Case 0.00 Sqm

Tower-H

Tower-H 12th 1st &2nd 0.43 Cum

0 - - - - -

1st,2nd,3rd
Tower-G 7th to 8th 0.00 Sqm
& 4th

Tower-H 10th 1st MT

Tower-H 12th 4th nos

Skilled Manpower required to be increased for Tower- G External pl

Today Carpenters absent(Require for RC

Require manpower for IPS Flooring & Tiles work in Tower-H


Require Bandhani in Tower- G for External Plaster(toda

SIGNED BY CHINTEL SITE ENGINEER


QUALITY CHECKED TARGET OUTPUT ACTUAL OUTPUT

AVERAGE SATISFACTORY

Yes 12.60 12.60

Yes 0.00 0.00

Yes 0.43 0.43

- - -

Yes 0.00 0.00

Yes 0.000 0.000

Yes 0.000 0.000

for Tower- G External plaster(Start work in 3phases) & Tile work

s absent(Require for RCC ledge wall)

& Tiles work in Tower-H and also require for Brick Coba
or External Plaster(today bandhani not reach at site)

SIGNED BY ALLIANZE PROJECT MANAGER


Date:- 29/8/2014

SIGNATURE BY SIGNATURE BY REMARKS IF ANY


SITE INCHARGE CLIENT

- -

- -

10mm
Aggregate
finished in
stock .
- -

- -

- -

- -
SIGNED BY CHINTEL PROJECT MANAGER
Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampura.New delhi-110034
Daily Labour Report

MANPOWER DEPLOYMENT IN TIME OUT TIME


S.NO LOCATION WITH DESCRIPTION

MASON CARPENTER BAR BINDER LABOUR COOLEE

1 Tower G tiles work & Kaccha work 5 - - 5 0 9:00 6:00

2 Tower H External Plaster 2 - - 3 0 9:00 6:00

3 Tower H Internal Plaster( in stair case) 2 - - 2 0 9:00 6:00

4 For materials shifting & Cleaning in tower G & H 0 - - 0 8 9:00 6:00

5 Cheeping for internal plaster - - - 2 0 9:00 6:00

6 R/F Binding For RCC Ledge wall( Tower- H) - - 3 0 - 9:00 6:00

7 Shuttering For RCC Ledge wall - 0 0 - 9:00 6:00

8 P.C.C. 1 0 3 - 9:00 6:00

Total:- 10 0 3 15 8
SIGNED BY ALLIANZE SIGNED BY CHINTEL
SITE ENGINEER SITE ENGINEER
Date:-
SAFETY MEASURES

SIGNATURE BY SIGNATURE BY
TARGET OUTPUT ACTUAL OUTPUT FULL DAY HALF DAY OVER TIME HELMET SHOES BELT
SITE INCHARGE CLIENT

0.00 0.00 All Nil Nil Yes Yes Not Required - -

12.60 12.60 All Nil Nil Yes Yes Yes - -

0.00 0.00 All Nil Nil Yes Yes Not Required - -

- - All Nil Nil Yes Yes Not Required - -

- - All - - Yes - - - -

- - All - - Yes - - - -

- - All - - Yes - - - -

0.43 0.43 All - - Yes - - - -


Y CHINTEL SIGNED BY ALLIANZE SIGNED BY CHINTEL
NEER PROJECT MANAGER PROJECT MANAGER
29/8/2014

REMARKS IF ANY
CHINTEL
ANAGER
Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampura
DAILY MEASUREMENT REPORT

MEASUREMENT
S.NO ITEMS DESCRIPTION UNITS NOS.
BREADTH/
LENGTH WIDTH

1.0 External Plaster(finishing work) Sqm 1.0 7.00

Total Sqm
2.0 Internal Plaster

Total Sqm
3.0 Toilet Tiles

Total Sqm
4.0 P.C.C.
Kitchen Plateform cum 2.0 2.40 0.56
cum 2.0 1.42 0.56

Total cum
SIGNED BY ALLIANZE SITE ENGINEER SIGNED BY CHINTEL SITE
palace,Pitampura.New delhi-110034 Date

ASUREMENT
SIGNATURE BY
QUANTITY EXPLANATORY NOTES SIGNATURE BY CLIENT
SITE INCHARGE
HEIGHT/ ENGINEER
DEPTH

1.80 12.60

12.60

0.00

0.00

0.10 0.27
0.10 0.16

0.43
SIGNED BY CHINTEL SITE ENGINEER SIGNED BY CHINTEL PROJECT MANAGER
29/8/2014

REMARKS IF ANY

Manpower required
to be increased for
Tower- G&H
External
plaster(Start work
in 3phases) & RCC
Ledge wall
TEL PROJECT MANAGER
Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampura
DAILY PROGRAMME CHART
MANPOWER DEPLOYMENT
S.NO ITEMS
MASON LABOUR COOLEE

1 P.C.C(1:4:8) 2 4

2 P.C.C(1:5:10)

3 IPS Skilled Manpower Require for Towe

4 RCC

5 STEEL

6 SHUTTERING Carpenter Require for Tower-H

7 STRUCTURAL STEEL Febrication Materials Require

8 VETRIFIED TILES

9 CEREMICS TILES WALLS Skilled Manpower Require for Towe

10 CEREMICS TILES FLOOR

11 SUNKEN WATERPROFFING

12 BASEMENT WATERPROFFING

13 COBA Skilled Manpower Require for Towe

14 GRANITE COUNTER

15 GRANITE FLOOR

16 GRANITE CLADDING

17 INTERNAL PLASTER WALL

18 INTERNAL PLASTER CEILING

19 EXTENAL PLASTER Bandhani & Skilled Manpower Require fo

20 KOTA STONE

21 FLUSH DOORS
SIGNED BY ALLIANZE
SITE ENGINEER
Subhash palace,Pitampura.New delhi-110034

LOCATION FLOOR UNIT NO. DESCRIPTION TOTAL QTY TARGET QTY

Kitchen
Tower-H 12th 2nd Plateform

Skilled Manpower Require for Tower-H

Carpenter Require for Tower-H

Febrication Materials Require

Skilled Manpower Require for Tower-H

Skilled Manpower Require for Tower-H

ani & Skilled Manpower Require for Tower-G


SIGNED BY CHINTEL
SITE ENGINEER
Date:- 29/8/2014

SIGNATURE BY SIGNATURE BY REMARKS IF ANY


COMMULATIVE QTY SITE INCHARGE CLIENT

P.C.C. Started in
kitchen
SIGNED BY CHINTEL
PROJECT MANAGER
Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampur
PROJECT MILESTONE CHART FOR TOWER G AND H

S.NO ACTIVITY START DATE FINISH DATE TOTAL DAYS

1 P.C.C(1:4:8) 7/11/2014 10/25/2014 106


2 P.C.C(1:5:10) 7/15/2014 11/15/2014 123
3 IPS 7/11/2014 10/25/2014 106
4 RCC 7/25/2014 9/20/2014 57
5 STEEL 8/1/2014 10/7/2014 67
6 SHUTTERING 7/12/2014 9/15/2014 65
7 STRUCTURAL STEEL 8/15/2014 10/15/2014 61
8 VETRIFIED TILES 7/11/2014 11/30/2014 142
9 CEREMICS TILES WALLS 7/11/2014 11/30/2014 142
10 CEREMICS TILES FLOOR 7/15/2014 11/30/2014 138
11 SUNKEN WATERPROFFING 7/20/2014 11/15/2014 118
12 BASEMENT WATERPROFFING 7/25/2014 10/15/2014 82
13 COBA 9/17/2014 10/20/2014 33
14 GRANITE COUNTER 7/20/2014 11/30/2014 133
15 GRANITE FLOOR 8/25/2014 11/30/2014 97
16 GRANITE CLADDING 9/25/2014 11/30/2014 66
17 INTERNAL PLASTER WALL 7/11/2014 9/25/2014 76
18 INTERNAL PLASTER CEILING 7/11/2014 9/15/2014 66
19 EXTENAL PLASTER 7/15/2014 11/25/2014 133
20 KOTA STONE 8/1/2014 10/30/2014 90
21 FLUSH DOORS 10/15/2014 11/30/2014 46
FINAL COMPLETION DATE FOR ALL ACTIVITIES = 142 DAYS INCLUDING GOVT.HOLYDAYS AND RAINY SEA

NOTE: THIS MILESTONES ARE SUBJECT TO PAYMENT TO BE RELEASED BY EACH 7 TH OF THE MONTH.SUBMITTED BILL HA
70% ADHOC ALONG WITH SECUIRED ADVANCES ANGAIST MATERIAL DELIVERD AT SITE.

SIGNED BY ALLIANZE PROJECT MANAGER


Subhash palace,Pitampura.New delhi-110034
G AND H STATUS OF WORK DONE
ACTUAL ACTUAL QTY
COMPLETION TOTAL QTY TARGET QTY PROJECTED DATE DONE
DATE
Actual Finished
Actual Started Date Date
29/8/2014

6/8/2014

31/7/2014

12/7/2014
12/7/2014
26/7/2014

NG GOVT.HOLYDAYS AND RAINY SEASON.

OF THE MONTH.SUBMITTED BILL HAVE TO RELEASED FOR


T MATERIAL DELIVERD AT SITE.
SIGNATURE BY SIGNATURE BY REMARKS IF ANY
COMMULATIVE QTY SITE INCHARGE CLIENT

SIGNED BY CHINTEL PROJECT MANAGER


Allianze Group: 22 3rd floor pearl Omaxe building Neta ji,Subhash palace,Pitampura
PROJECT IMPORTANT CONTACTS WITH HINDRANCE RECORDS
S.NO NAME DESIGNATION COMPANY CONTACT ADDRESS

Clint :-

1 Mr.Gagan Khanna Sb. GM Chintals

2 Mr. Susil Serma PM Chintals

3 Mr. Rajiv Jha PE Chintals

4 Mr. R D Yadav Foreman Chintals

5 Mr.Mohanti Foreman Chintals

6 Mr. Sanjay Lift Operator Chintals

Contractor:-

1 Mr. Kapil Siwach COO Allianze Group

2 Mr. Sachin Architect Allianze Group

3 Mr. Anjan Roy Site Incharge Allianze Group

4 Mr. Rajesh Jha Mterials Incharge Allianze Group

5 Mr. Ahmad PE Allianze Group

6 Mr. Paras Serma Site Engineer Allianze Group

Sub Contractor:-

1 Mr. Shankar Allianze Group


SIGNED BY ALLIANZE SITE ENGINEER
alace,Pitampura.New delhi-110034

CONTACT NO. ACTIVITY HINDRENCE DELAY

LANDLINE MOBILE ALTERNATE

8586952695

9958377775

7042290712

7042198514

7042198504

9717202405

9910080538 9910080638

9891966391

9891078843 9810778843

9810542375

9971574268

7835981234 8860871099

9891440032 9891440034
SIGNED BY CHINTEL SITE ENGINEER SIGNED BY CHINTE
IMPACT REMARKS IF ANY

Mr.Gagan Khanna Sb. Resign


from GM post
SIGNED BY CHINTEL PROJECT MANAGER