GAVION ES S E C C IO N T R A N S VE R S A L
T IP IC A
ES C . 1/25
RELLENO
C AN TO S RODADOS
C = 0
Ys = 1.56 ton/m3
h = 5 m
b = 3 m
a = 1 m
@ = 0 º
Ka = 0.307
H = (h-(b-a)*tg@)cos@ = 5
Ea = 5.987 ton/m
Seguridad al deslizamiento:
Yg = Yp * ( 1 - n )
Yp = 2.11 g/cm3
n 0.1
Yg = 1.899 ton/m3
Ev = Ea * sen ( 90º + δ - £ )
Eh = Ea * cos ( 90º + δ - £ )
δ = & = 32 º
£ = 90 º
Ev = 3.1724 ton/m
Eh = 5.0768 ton/m
Metrado de cargas:
W W (ton) Xi Mi
Wa 5.697 1.5 8.546
Wb 4.748 1.75 8.308
Wc 3.798 2 7.596
Wd 2.849 2.25 6.409
We 1.899 2.5 4.748
18.99 35.606 Mr
Seguridad al volteo:
d = H/3 = 1.667
Mv = Eh * d = 8.461 ton-m/m
Mr
n"= > 1.5
Mv
Verificación :
e = B/2 - (( Mr - Mv ) / N ) < B/6
N = ( W + Ev ) cos @ + Eh sen @
N= 22.162 Tn/m
e= 0.275 m < 0.500
P1 = ( N / B ) * ( 1 + ( 6*e / B ) )
P2 = ( N / B ) * ( 1 + ( 6*e / B ) )
GAVIONES
C AN TOS RODADOS
RELLENO
C = 0
Ys = 1.56 ton/m3
h = 3.5 m
b = 2 m
a = 1 m
@ = 0 º
Ka = 0.307
H = (h-(b-a)*tg@)cos@ = 3.5
Ea = 2.933 ton/m
Seguridad al deslizamiento:
Yg = Yp * ( 1 - n )
Yp = 2.11 g/cm3
n 0.05
Yg = 2.0045 ton/m3
Ev = Ea * sen ( 90º + δ - £ )
Eh = Ea * cos ( 90º + δ - £ )
δ = & = 32 º
£ = 90 º
Ev = 1.5545 ton/m
Eh = 2.4877 ton/m
Metrado de cargas:
W W (ton) Xi Mi
Wa 4.009 1 4.009
Wb 3.007 1.25 3.758
Wc 2.005 1 2.005
Wd 1.002 1 1.002
10.0225 10.774 Mr
Seguridad al volteo:
d = H/3 = 1.167
Mv = Eh * d = 2.902 ton-m/m
Mr
n"= > 1.5
Mv
Verificación :
e = B/2 - (( Mr - Mv ) / N ) < B/6
N = ( W + Ev ) cos @ + Eh sen @
N= 11.577 Tn/m
e= 0.320 m < 0.333
P1 = ( N / B ) * ( 1 + ( 6*e / B ) )
P2 = ( N / B ) * ( 1 + ( 6*e / B ) )
DATOS:
ALTURA DE ZAPATA CIMENTACION (m) d= 0.50
TIPO DE TERRENO (Kg/cm2) d = 2.13
ANCHO DEL MURO (m) A= 4.00
ALTURA DEL MURO (m) h= 4.00
ANGULO DE FRICCION INTERNA (grados) T = 32.00
ALTURA EQUIV. DE SOBRE CARGA (m) h'= 0.00
PESO ESPECIF. RELLENO (Tn/m3) g1 = 1.69
PESO ESPECIF. CONCRETO (Tn/m3) T2 = 2.30
M = 1.60
N = 1.10
E = 0.35
G = 0.35
a = 0.00
b = 0.15
c = 0.20
B = 3.40
H= 2.00
h'= 0.00
C= 0.31
E = 0,5 * W * h ( h + 2h' ) * C = 1.035 Tn
Ev = E * Sen (o/2) = 0.285 Tn
Eh = E * Cos (o/2) = 0.995 Tn
VERIFICACIONES:
B= 3.4
H= 4.50
h' = 0.00
C= 0.31
E = 0,5 * W * h (h + 2h') * C = 5.242
Ev = E * Sen (o/2) = 1.445
Eh = E * Cos (o/2)= 5.039
Xv=Mt/Pi 2.324 m
Z=Eh*Dh/Pi 0.518 m
e=b/2-(Xv-Z) -0.106 m > b/6 b/6= 0.567
e < b/6, CONFORME
VERIFICACIONES: