Metrado
COSTO DIRECTO
COSTOS INDIRECTOS:
* Gastos Generales Fijos 0.22%
* Gastos Generales Variables 10.02%
* Utilidad 6.00%
VALOR REFERENCIAL
MES 1 MES 2
Precio (S/.) Parcial (S/.) SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14
245.37 4,907.40 X X
26.86 456.62 X X X X X X X X X
2.27 2,542.40 X X X X X X X X X X X X X X
32.51 227.57 X X X X X X
251.06 878.71 X
2.27 667.38 X X X X X X X X X X
2.27 5,102.96 X X X X X X X
43.25 5,449.50 X X X X
300.25 5,404.50
61.65 5,918.40
2.27 20,430.00
241.41 5,793.84
39.34 19,119.24
1.01 5,888.30
2.27 7,491.00
262.68 12,608.64
52.55 1,261.20
2.27 1,180.40
262.68 1,471.01
106,799.07
234.96
10,701.27
6,407.94
124,143.24
22,345.78
146,489.02
MES 2 MES 3
SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
X X X
X X X X X
X
X X X X X X X X
X X X X X X X X X X X X X
X
X X X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X
X
X X X X X
X X X
X
S10
20 mes 1 4907.4
17 mes 1 456.62
1120 mes 1 2542.4
7 mes 2 227.57
3.5 mes 2 878.71
176.4 mes 1 400.428
117.6 mes 2 266.952
2248 mes 2 5102.96
126 mes 2 5449.5
18 mes 2 5404.5
96 mes 2 5918.4
6923.0769231 mes 2 15715.384615
2076.9230769 mes 3 4714.6153846
24 mes 3 5793.84
145.8 mes 2 5735.772
340.2 mes 3 13383.468
5830 mes 3 5888.3
3300 mes 3 7491
48 mes 3 12608.64
24 mes 3 1261.2
520 mes 3 1180.4
5.6 mes 3 1471.008
###
0
0
0
ITEM DESCRIPCION METRADO MES
01.06.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 20 mes 1
01.06.01.02 ENCOFRADO DE ZAPATAS 17 mes 1
01.06.01.03 ACERO fy=4200 kg/cm2 GRADO 60 en ZAPATAS 1120 mes 1
01.06.01.04 ENCOFRADO DE VIGAS DE CIMENTACION 7 mes 2
01.06.01.05 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 3.5 mes 2
01.06.01.06 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS DE CIMENTACION 176.4 mes 1
01.06.01.06 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS DE CIMENTACION 117.6 mes 2
01.06.02.01 ACERO fy=4200 kg/cm2 GRADO 60 en COLUMNAS 2248 mes 2
01.06.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 126 mes 2
01.06.02.03 CONCRETO EN COLUMNAS f'c=210 kg/cm2 18 mes 2
01.06.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 96 mes 2
01.06.03.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS 6923.0769230769 mes 2
01.06.03.02 ACERO fy=4200 kg/cm2 GRADO 60 en VIGAS 2076.9230769231 mes 3
01.06.03.03 CONCRETO EN VIGAS f'c=210 kg/cm2 24 mes 3
01.06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 145.8 mes 2
01.06.04.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 340.2 mes 3
01.06.04.02 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO 5830 mes 3
01.06.04.03 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS 3300 mes 3
01.06.04.04 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 48 mes 3
01.06.05.01 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS 24 mes 3
01.06.05.02 ACERO fy=4200 kg/cm2 GRADO 60 en ESCALERAS 520 mes 3
01.06.05.03 CONCRETO EN ESCALERAS f'c=210 kg/cm2 5.6 mes 3