Sie sind auf Seite 1von 11

MOP Ref.

#:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 1 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

MOP HISTORY
MOST RECENT REVISION AUTHORIZED BY APPROVED BY SIGNATURE DATE APPROVED
VERSION DETAIL/S

1. DESCRIPTION
On-airing of new LTE-RAN eNodeB site(s).

2. PURPOSE AND SCOPE


To put On-Air newly integrated and optimized LTE-RAN eNodeB site(s).

3. BACKGROUND
The site(s) to be put On-Air already passed the Single Site Verification (SSV) and Pre-Acceptance Test.
This activity, when implemented, is a pre-requisite to produce the Sales Map(s) for the concerned
site(s).

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 2 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

4. AUDIENCE
Contact
Division Department Name Position
Number
NTG SEI Donald Virtucio 09175880750
Jermagne John
NTG RPI 09175887835
Aguila
NTG SCC Matthew Slee SCC Head
NTG SCC Aliver Dimacisil NOC Head 09175880649
NOC RAN

5. Target Date of Implementation: 2019-05-22x2019-05-23; 16:00H-4:00H

6. CHANGE CATEGORY

Minor Major Critical

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 3 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

7. TYPE OF SERVICE: None Service Affecting

8. SITE AND SYSTEM AFFECTED

TECHNOLOGY PLAID SITE NAME CONFIGURATION


LTE FDD SL853 BINAN 1+1+1

9. WITH OTHER RELATED ACTIVITY: YES NO


Description
SO REF#
MOP REF#
Network Element (NE) Affected

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 4 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

Remarks:

10. PEOPLE INVOLVED DURING IMPLEMENTATION OF THE ACTIVITY


Company Department Name Position Contact
Number
GT NOC On duty personnel

11. INVENTORY
HARDWARE
System Name Product Version Remarks
U2000 iManager U2000 ATAE iManagerU2000R014C00SPC210 U2000
LTE eNodeB BTS3900 LTE BTS3900 V100R010C00SPC255 LTE eNodeB

SOFTWARE

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 5 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

System Name Product Version Remarks


U2000 iManager U2000 ATAE iManagerU2000R014C00SPC210 U2000
LTE eNodeB BTS3900 LTE BTS3900 V100R010C00SPC255 LTE eNodeB

12. TOPOLOGY
Not Applicable

13. SUPPORTING DOCUMENTS


Description Attachment
BFT Report (approved by GT-NOC)

SSV Report (approved by GT-RPI)

PAT Report (approved GT-FO)


SL853_BINAN_PAT
DOCS.pdf

Non-Compliance Report (NCR) Without NCR

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 6 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

14. WORK BREAKDOWN SCHEDULE


Start End
Activity Responsible Remarks
Time Time
Confirm with GT-NOC that activity is
Pre-activity
16:00H 17:00H GT-NOC endorsed.
Checklist
Check and record existing alarms (if any).
Load scripts for removing “_4RFS” suffix
17:00H 19:00H Activation Proper GT-NOC
from the LTE-RAN site name.
GT-NOC Check if LTE-RAN site is On-Air.
Post Activity
19:00H 20:00H GT-NOC Check and rectify if any new alarm(s)
Checklist
exist(s).
TBD* TBD* Revert Procedure GT-NOC Load Fall-Back/Revert scripts.

15. KNOWN ISSUES, RISKS AND MITIGATIONS


1. LTE-RAN eNB site will not go On-Air after loading the new Work Order which might require
hardware reset.

16. PRE-REQUISITES PRIOR TO IMPLEMENTATION

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 7 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

1. Approved PAT and SSV Reports are available as attachments to the MOP.
2. Activity has been issued SO Number, approved by GT-SEI and properly endorsed to GT-NOC.

17. SUCCESS, ABORT AND REVERT BACK CRITERIA


SUCCESS CRITERIA:
1. Site is on-air and without service affecting alarm after loading the scripts.
2. Successful implementation is officially broadcast by GT-NOC.

ABORT CRITERIA:
1. Site access due to Lessor Issue.
2. LTE-RAN site is down due to transport problem.
3. LTE-RAN site is running on back-up battery due to long commercial power outage.

REVERT CRITERIA:
1. Not all sectors are On-Air.
2. All sectors are On-Air but with service affecting alarms.

18. PRE-ACTIVITY PROCEDURE


1. Confirm if approved SO Number for the activity is endorsed to GT-NOC.

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 8 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

2. Check and record any existing alarm(s) of the LTE-RAN eNodeB site.

19. PLANNED ACTIVITY PROCEDURE


1. Execute MML command for renaming the eNodeB and Cell names (removal of _4RFS) :
Sample Script:
MOD CELL:LOCALCELLID=1,CELLNAME="Cell Name"; (remove the _4RFS)
MOD CELL:LOCALCELLID=2,CELLNAME="Cell Name"; (remove the _4RFS)
MOD CELL:LOCALCELLID=3,CELLNAME="Cell Name"; (remove the _4RFS)
MOD CELL:LOCALCELLID=11,CELLNAME="Cell Name"; (remove the _4RFS)
MOD CELL:LOCALCELLID=12,CELLNAME="Cell Name"; (remove the _4RFS)
MOD CELL:LOCALCELLID=13,CELLNAME="Cell Name"; (remove the _4RFS)

2. Execute MML command for removing the AC11 configuration:


MOD CELLOP:LOCALCELLID=1,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=2,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=3,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=11,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=12,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=13,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_NOT_RESERVED_FOR_OP;

20. POST ACTIVITY CHECKING AND VALIDATION


1. Check operational status of the LTE-RAN eNB Site if it is UNLOCK and ENABLED (On-Air)
2. Check and rectify (if any) new alarm exist.

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 9 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

21. REVERT BACK PROCEDURE


1. Execute MML command for renaming the eNodeB and Cell names (removal of _4RFS) :
Sample Script:
MOD CELL:LOCALCELLID=1,CELLNAME="Cell Name"; (add the _4RFS)
MOD CELL:LOCALCELLID=2,CELLNAME="Cell Name"; (add the _4RFS)
MOD CELL:LOCALCELLID=3,CELLNAME="Cell Name"; (add the _4RFS)
MOD CELL:LOCALCELLID=101,CELLNAME="Cell Name"; (add the _4RFS)
MOD CELL:LOCALCELLID=102,CELLNAME="Cell Name"; (add the _4RFS)
MOD CELL:LOCALCELLID=103,CELLNAME="Cell Name"; (add the _4RFS)

2. Execute MML command for removing the AC11 configuration:


MOD CELLOP:LOCALCELLID=1,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=2,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=3,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=101,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=102,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;
MOD CELLOP:LOCALCELLID=103,TRACKINGAREAID=0,CELLRESERVEDFOROP=CELL_RESERVED_FOR_OP;

22. POST REVERT BACK SUCCESS CRITERIA


1. Operational status of the LTE-RAN eNB Site is UNLOCKED/ENABLED.
2. No new alarm from the PRE-ACTIVITY PROCEDURE exist.

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 10 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

23. ESCALATION PROCEDURE


In the event of result deviation, clarifications or when activity does not succeed during implementation, escalate issue/s
for status dissemination to:

For activity clarification:


Change Control Engineer: Immediate Superior: 2nd Level Immediate Superior:
Khim Alban/09959648653 Donald Virtucio / 09175880750 Cris Crisostomo

For service impact/abnormal outages:


Name of Implementer (if not NOC): Immediate Superior: 2nd Level Immediate Superior:
Edward Carlo Gaspar/09178252295 Willie Chong/09271524627 Liwanlei / 09063224735
Jeffrey Guererro / 09176017840
Pauline Sunga / 09166768141

For parameter clarification and SPOC coordination with other groups involved in activity:
Activity-In-charge/Initiator: Immediate Superior: 2nd Level Immediate Superior:
Adlai Jawid 09063557405 JP Mercado 09179333497 Christopher Ty 09178888166

24. CONCURRENCE

The undersigned, who are duly authorized representatives of their division, department,
section or unit, have concurred to the content of this document, and as such, agrees that
the instructions and procedures specified herein must be complied with by all users of

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.
MOP Ref. #:

GLOBE TELECOM INC. Version #:


Document Management System Center
NCR REF. NO.: (if applicable) CLASSIFICATION: Page 11 of 11
(private/confidential, etc.)

GROUP/DIVISION/DEPARTMENT/SECTION/UNIT: (of Requestor)

(SL853–BINAN) MOP for LTE-RAN Site Cut-Over

this document (note: approvals will be mostly made through emails)

Name Position Dept./Div. Signature Date


Khim Alban Approver SEI

Guide on Concurrence:
Minor – up to Section Head
Major – up to Department Head
Critical – up to Divisionx

Signed in the Master Copy


Prepared by: Reviewed and Verified by: Approved by: Approved for Distribution

DMSC Head
_____________________ _____________________ _____________________ _____________________
Signature over Printed Name Signature over Printed Name Signature over Printed Name Signature over Printed Name
Date Signed: Date Signed: Date Signed: Date Signed:
This document is not to be reproduced without the permission from Globe Telecom.
Official copy is available in the Document Management System.
Printed copy is considered uncontrolled.
For any comments and queries regarding this form, please contact DMSC at________.

Das könnte Ihnen auch gefallen