FEED for Upgrade & Replacement of Fire Protection Systems at

Berth No. 6, MIC Port


Activity ID Activity Name Start Finish Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov

LT18102700 FEED FOR MIC PORT 14-Aug-18 07-Sep-19 07-Sep-19 04:00 PM, LT18102700 FEED FOR MIC
08:00 AM 04:00 PM
LT18102700.1 Project Initiation 14-Aug-18 08:00
28-Aug-18
AM 04:00 PM 28-Aug-18 04:00 PM, LT18102700.1 Project Initiation
A0.1.0 Stat Milestone 14-Aug-18 08:00 AM Stat Milestone, 14-Aug-18 08:00 AM
A0.1.1 Kickoff Meeting 14-Aug-18 08:00
14-Aug-18
AM 04:00
Kickoff
PM Meeting
A0.1.2 Project Plane Submition 15-Aug-18 08:00
16-Aug-18
AM 04:00
Project
PM Plane Submition
A0.1.3 Plane Review 18-Aug-18 08:00
20-Aug-18
AM 04:00 PM
Plane Review
A0.1.4 Mobilization 21-Aug-18 08:00
28-Aug-18
AM 04:00 PM Mobilization

LT18102700.2 General 30-Aug-18 08:00


07-Sep-19
AM 04:00 PM 07-Sep-19 04:00 PM, LT18102700.2 General

LT18102700.2.1 Project Exeuction Documents 30-Aug-18 08:00


15-Oct-18
AM 04:00 PM 15-Oct-18 04:00 PM, LT18102700.2.1 Project Exeuction Documents
A1.1.1 Project Execution Plan 30-Aug-18 08:00
02-Sep-18
AM 04:00 PM Project Execution Plan
A1.1.2 Project Risk Register 03-Sep-18 08:00
06-Sep-18
AM 04:00 PM Project Risk Register
A1.1.3 Project Quality Plan 08-Sep-18 08:00
16-Sep-18
AM 04:00 PM Project Quality Plan
A1.1.4 Project HSE Plan 17-Sep-18 08:00
27-Sep-18
AM 04:00 PM Project HSE Plan
A1.1.5 Project Planning Package 29-Sep-18 08:00
15-Oct-18
AM 04:00 PM Project Planning Package
LT18102700.2.2 Site Survey and Document Retrieval 16-Oct-18 08:00
08-Dec-18
AM 04:00 PM 08-Dec-18 04:00 PM, LT18102700.2.2 Site Survey and Document Retrieval
A1.2.1 Carry out site survey of existing facilities, including underground 16-Oct-18 08:00
01-Nov-18
AM 04:00 PM Carry out site survey of existing facilities, including underground
A1.2.2 Identify and verify all interfaces and tie-in points 17-Oct-18 08:00
03-Nov-18
AM 04:00 PM Identify and verify all interfaces and tie-in points
A1.2.3 Identify locations for both temporary and permanent works 20-Oct-18 08:00
30-Oct-18
AM 04:00 PM Identify locations for both temporary and permanent works
A1.2.4 Identify and obtain existing plant operation data and procedures 31-Oct-18 08:00
07-Nov-18
AM 04:00 PM Identify and obtain existing plant operation data and procedures
A1.2.5 Verify availability and adequacy of all required utilities and services 08-Nov-18 08:00
17-Nov-18
AM 04:00 PM Verify availability and adequacy of all required utilities and services
A1.2.6 Retrieve and verify accuracy of all relevant existing drawings 18-Nov-18 08:00
26-Nov-18
AM 04:00 PM Retrieve and verify accuracy of all relevant existing drawings
A1.2.7 Compile a Survey Report containing all information gathered during this
27-Nov-18
activity 08:00
08-Dec-18
AM 04:00 PM Compile a Survey Report containing all information gathered during this activity
LT18102700.2.3 Study Verification & Design Basis Memorandum [DBM]09-Dec-18 08:00
24-Dec-18
AM 04:00 PM 24-Dec-18 04:00 PM, LT18102700.2.3 Study Verification & Design Basis Memorandum [DBM]
A1.3.1 Study Verif ication Report 09-Dec-18 08:00
12-Dec-18
AM 04:00 PM Study Verification Report
A1.3.2 Design Basis Memorandum 13-Dec-18 08:00
18-Dec-18
AM 04:00 PM Design Basis Memorandum
A1.3.3 Design Basis Memorandum Presentation 19-Dec-18 08:00
24-Dec-18
AM 04:00 PM Design Basis Memorandum Presentation
LT18102700.2.4 Miscellaneous Other General Documents 11-Mar-19 08:00
21-Mar-19
AM 04:00 PM 21-Mar-19 04:00 PM, LT18102700.2.4 Miscellaneous Other General Documents
A1.4.1 Document Long Lead items list 11-Mar-19 08:00
16-Mar-19
AM 04:00 PM Document Long Lead items list
A1.4.2 Criticality Rating Report (Multidiscipline) 17-Mar-19 08:00
21-Mar-19
AM 04:00 PM Criticality Rating Report (Multidiscipline)
A1.4.3 Constructability report including shutdown strategy 12-Mar-19 08:00
17-Mar-19
AM 04:00 PM Constructability report including shutdown strategy
LT18102700.2.5 Input to EPIC Scope of Work 18-Mar-19 08:00
02-May-19
AM 04:00 PM 02-May-19 04:00 PM, LT18102700.2.5 Input to EPIC Scope of Work
A1.5.1 EPIC Scope of Work 18-Mar-19 08:00
23-Mar-19
AM 04:00 PM EPIC Scope of Work
A1.5.2 Consolidated, itemized Bill of Quantities for the EPIC work 24-Mar-19 08:00
28-Mar-19
AM 04:00 PM Consolidated, itemized Bill of Quantities for the EPIC work
A1.5.3 consolidated Level II Planning Package commencing from issue of EPIC
30-Mar-19
Tender08:00
03-Apr-19
until EPIC
AM 04:00
Close-Out
PM consolidated Level II Planning Package commencing from issue of EPIC Tender until EPICClose-Out
A1.5.4 QP comment resolution after incorporating comments, arrange 2 day04-Apr-19
presentation
08:00
09-Apr-19
to QP
AMbefore
04:00final
PMissue QP comment resolution after incorporating comments, arrange 2 day presentation to QP before final issue
A1.5.5 Consolidated Cost Estimate for EPIC Scope of Work 10-Apr-19 08:00
15-Apr-19
AM 04:00 PM Consolidated Cost Estimate for EPIC Scope of Work
A1.5.6 EPIC Project Schedule 16-Apr-19 08:00
21-Apr-19
AM 04:00 PM EPIC Project Schedule
A1.5.7 Long Lead Item Lists 22-Apr-19 08:00
27-Apr-19
AM 04:00 PM Long Lead Item Lists
A1.5.8 Compile Appendices A,B,F,F for the Contract scope 28-Apr-19 08:00
02-May-19
AM 04:00 PM Compile Appendices A,B,F,F for the Contract scope
LT18102700.2.6 Project Dossier 27-Aug-19 08:00
07-Sep-19
AM 04:00 PM 07-Sep-19 04:00 PM, LT18102700.2.6 Project Doss
A1.6.1 Project FEED Dossier 27-Aug-19 08:00
01-Sep-19
AM 04:00 PM Project FEED Dossier
A1.6.2 De-Mobilization 02-Sep-19 08:00
07-Sep-19
AM 04:00 PM De-Mobilization
A1.6.3 End Milestone 07-Sep-19 04:00 PM End Milestone,

LT18102700.3 Mechanical 17-Oct-18 08:00


04-Feb-19
AM 04:00 PM 04-Feb-19 04:00 PM, LT18102700.3 Mechanical

LT18102700.3.1 Specifications and Data Sheets for Piping 27-Nov-18 08:00


19-Dec-18
AM 04:00 PM 19-Dec-18 04:00 PM, LT18102700.3.1 Specifications and Data Sheets for Piping
A3.1.1 Piping Material Specification 27-Nov-18 08:00
02-Dec-18
AM 04:00 PM Piping Material Specification
A3.1.2 Specification for GRE Piping 03-Dec-18 08:00
08-Dec-18
AM 04:00 PM Specification for GRE Piping
A3.1.3 Specification and Data Sheets for Valves 09-Dec-18 08:00
13-Dec-18
AM 04:00 PM Specification and Data Sheets for Valves
A3.1.4 Piping Specialty list, datasheet and specification 15-Dec-18 08:00
19-Dec-18
AM 04:00 PM Piping Specialty list, datasheet and specification
LT18102700.3.2 Piping Drawings 17-Oct-18 08:00
26-Nov-18
AM 04:00 PM 26-Nov-18 04:00 PM, LT18102700.3.2 Piping Drawings
A3.2.1 Overall Plot Plan 17-Oct-18 08:00
22-Oct-18
AM 04:00 PM Overall Plot Plan
A3.2.2 Equipment Layout Drawings 23-Oct-18 08:00
28-Oct-18
AM 04:00 PM Equipment Layout Drawings
A3.2.3 Piping Key Plan 29-Oct-18 08:00
03-Nov-18
AM 04:00 PM Piping Key Plan
A3.2.4 Piping General Arrangement Drawings and Details 04-Nov-18 08:00
08-Nov-18
AM 04:00 PM Piping General Arrangement Drawings and Details
A3.2.5 Underground fire water line route drawing 10-Nov-18 08:00
14-Nov-18
AM 04:00 PM Underground fire water line route drawing
A3.2.6 Underground fire water line Crossing drawings 15-Nov-18 08:00
20-Nov-18
AM 04:00 PM Underground fire water line Crossing drawings

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 1 of 4
08-Jun-18 11:0... #1
Actual Work Critical Remaining Work summary
Prepared By : Shiyam, iFluids Engg
FEED for Upgrade & Replacement of Fire Protection Systems at
Berth No. 6, MIC Port
Activity ID Activity Name Start Finish Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A3.2.7 Piping Demolition Drawings 21-Nov-18 08:00
26-Nov-18
AM 04:00 PM Piping Demolition Drawings
LT18102700.3.3 Piping Reports & Calculations 20-Dec-18 08:00
12-Jan-19
AM 04:00 PM 12-Jan-19 04:00 PM, LT18102700.3.3 Piping Reports & Calculations
A3.3.1 Thickness Calculation Report for GRE Piping 20-Dec-18 08:00
25-Dec-18
AM 04:00 PM Thickness Calculation Report for GRE Piping
A3.3.2 Piping Stress Analysis Report 26-Dec-18 08:00
31-Dec-18
AM 04:00 PM Piping Stress Analysis Report
A3.3.3 Material Handling/Lifting study Report 01-Jan-19 08:00
06-Jan-19
AM 04:00 PM Material Handling/Lifting study Report
A3.3.4 Material Selection Study Report for piping and equipment 07-Jan-19 08:00
12-Jan-19
AM 04:00 PM Material Selection Study Report for piping and equipment
LT18102700.3.4 Piping Schedule & Material Take-off (MTO) 13-Jan-19 08:00
04-Feb-19
AM 04:00 PM 04-Feb-19 04:00 PM, LT18102700.3.4 Piping Schedule & Material Take-off (MTO)
A3.4.1 Tie-In Schedule and Tie-In Engineering Package 13-Jan-19 08:00
17-Jan-19
AM 04:00 PM Tie-In Schedule and Tie-In Engineering Package
A3.4.2 Valve Schedule 19-Jan-19 08:00
23-Jan-19
AM 04:00 PM Valve Schedule
A3.4.3 Preliminary Piping MTO 24-Jan-19 08:00
29-Jan-19
AM 04:00 PM Preliminary Piping MTO
A3.4.4 Piping Support Schedule and Pipe Support Details 30-Jan-19 08:00
04-Feb-19
AM 04:00 PM Piping Support Schedule and Pipe Support Details
LT18102700.3.5 Static Equipment Design 05-Dec-18 08:00
08-Jan-19
AM 04:00 PM 08-Jan-19 04:00 PM, LT18102700.3.5 Static Equipment Design
A3.5.1 Mechanical Design Basis 05-Dec-18 08:00
10-Dec-18
AM 04:00 PM Mechanical Design Basis
A3.5.2 Production of data sheets, and specifications for all mechanical equipment
11-Dec-18
including
08:00
16-Dec-18
packaged
AM 04:00units
PM Production of data sheets, and specifications for all mechanical equipment including packaged units
A3.5.3 Design Calculations of Mechanical Equipments 17-Dec-18 08:00
22-Dec-18
AM 04:00 PM Design Calculations of Mechanical Equipments
A3.5.4 Prepare / Submission of the Equipment List 23-Dec-18 08:00
27-Dec-18
AM 04:00 PM Prepare / Submission of the Equipment List
A3.5.5 Material Handling Study Reports 29-Dec-18 08:00
02-Jan-19
AM 04:00 PM Material Handling Study Reports
A3.5.6 Complete material requisition for identified Mechanical Equipment 03-Jan-19 08:00
08-Jan-19
AM 04:00 PM Complete material requisition for identified Mechanical Equipment
LT18102700.3.6 Rotating Equipment Design 31-Oct-18 08:00
04-Dec-18
AM 04:00 PM 04-Dec-18 04:00 PM, LT18102700.3.6 Rotating Equipment Design
A3.6.1 Mechanical Design Basis 31-Oct-18 08:00
05-Nov-18
AM 04:00 PM Mechanical Design Basis
A3.6.2 Production of data sheets, and specifications for all mechanical equipment
06-Nov-18
including
08:00
11-Nov-18
packaged
AM 04:00units
PM Production of data sheets, and specifications for all mechanical equipment including packaged units
A3.6.3 Design Calculations of Mechanical Equipments 12-Nov-18 08:00
17-Nov-18
AM 04:00 PM Design Calculations of Mechanical Equipments
A3.6.4 Prepare / Submission of the Equipment List5 18-Nov-18 08:00
22-Nov-18
AM 04:00 PM Prepare / Submission of the Equipment List5
A3.6.5 Material Handling Study Reports 24-Nov-18 08:00
28-Nov-18
AM 04:00 PM Material Handling Study Reports
A3.6.6 Complete material requisition for identified Mechanical Equipment 29-Nov-18 08:00
04-Dec-18
AM 04:00 PM Complete material requisition for identified Mechanical Equipment

LT18102700.4 Instrumentation & Control 09-Jan-19 08:00


13-Mar-19
AM 04:00 PM 13-Mar-19 04:00 PM, LT18102700.4 Instrumentation & Control

LT18102700.4.1 General, Design Basis & Philosophies 09-Jan-19 08:00


12-Feb-19
AM 04:00 PM 12-Feb-19 04:00 PM, LT18102700.4.1 General, Design Basis & Philosophies
A4.1.1 Instrument drawings and document Index 09-Jan-19 08:00
14-Jan-19
AM 04:00 PM Instrument drawings and document Index
A4.1.2 Inputs to Design Basis, Layouts / location studies 15-Jan-19 08:00
20-Jan-19
AM 04:00 PM Inputs to Design Basis, Layouts / location studies
A4.1.3 Establish Instrumentation and Safeguarding Philosophy for the Facility
21-Jan-19
prepare 08:00
System
26-Jan-19
AM
Block
04:00
Diagrams
PM Establish Instrumentation and Safeguarding Philosophy for the Facility prepare System Block Diagrams
A4.1.4 Package Control and Interfaces 27-Jan-19 08:00
31-Jan-19
AM 04:00 PM Package Control and Interfaces
A4.1.5 Carry outAdequacy Check 02-Feb-19 08:00
06-Feb-19
AM 04:00 PM Carry outAdequacy Check
A4.1.6 Instrumentation Inputs to Scope of WOrk for EPIC 07-Feb-19 08:00
12-Feb-19
AM 04:00 PM Instrumentation Inputs to Scope of WOrk for EPIC
LT18102700.4.2 Instrumentation Specifications,Sizing & Datasheets 13-Feb-19 08:00
02-Mar-19
AM 04:00 PM 02-Mar-19 04:00 PM, LT18102700.4.2 Instrumentation Specifications,Sizing & Datasheets
A4.2.1 General Equipment / System wise Functional Specifications for Instruments
13-Feb-19 08:00
18-Feb-19
AM 04:00 PM General Equipment / System wise Functional Specifications for Instruments
A4.2.2 Generate Shell DEP Datasheets for field Instruments ,detectors,devices
19-Feb-19
and automated
08:00
24-Feb-19
AM
valves
04:00 PM Generate Shell DEP Datasheets for field Instruments ,detectors,devices and automated valves
A4.2.3 Materials Requisition for Long lead items 25-Feb-19 08:00
02-Mar-19
AM 04:00 PM Materials Requisition for Long lead items
LT18102700.4.3 Instrumentation Drawings and Schedules 03-Mar-19 08:00
13-Mar-19
AM 04:00 PM 13-Mar-19 04:00 PM, LT18102700.4.3 Instrumentation Drawings and Schedules
A4.3.1 Instrument Air / UPS consumption list with Calculations, Instr ument Index,
03-Mar-19
I/O Lists,08:00
07-Mar-19
blockAM
diagrams,
04:00 PM
Cable Schedules Instrument Air / UPS consumption list with Calculations, Instr ument Index, I/O Lists, block diagrams, Cable Schedules
A4.3.2 Develop material Take-Off and Provide inputs to Cost Estimate (Instrument
09-Mar-19
and F&G)
08:00
13-Mar-19
AM 04:00 PM Develop material Take-Off and Provide inputs to Cost Estimate (Instrument and F&G)

LT18102700.5 Building Services 27-Apr-19 08:00


28-Jul-19
AM 04:00 PM 28-Jul-19 04:00 PM, LT18102700.5 Building Services

LT18102700.5.1 Design Basis & Calculations 27-Apr-19 08:00


07-May-19
AM 04:00 PM 07-May-19 04:00 PM, LT18102700.5.1 Design Basis & Calculations
A5.1.1 Project specific Plumbing, Drainage and Irrigation design 27-Apr-19 08:00
01-May-19
AM 04:00 PM Project specific Plumbing, Drainage and Irrigation design
A5.1.2 HVAC design basis and HVAC calculations for HVAC system 02-May-19 07-May-19
08:00 AM 04:00 PM HVAC design basis and HVAC calculations for HVAC system
08-May-19 30-May-19
LT18102700.5.2 Specifications for HVAC/ Plumbing , Drainage and Irrigation 08:00 AM 04:00 PM 30-May-19 04:00 PM, LT18102700.5.2 Specifications for HVAC/Plumbing ,Drain age and Irrigation
A5.2.1 Specifications for Plumbing, Drainage and Irrigation Materials and Works
08-May-19 13-May-19
08:00 AM 04:00 PM Specifications for Plumbing, Drainage and Irrigation Materials and Works
A5.2.2 Irrigation Control Schematics and Sequence of Operation on Remote14-May-19
Vegetation19-May-19
08:00 AM 04:00 PM Irrigation Control Schematics and Sequence of Operation on Remote Vegetation
A5.2.3 HVAC Specification 20-May-19 25-May-19
08:00 AM 04:00 PM HVAC Specification
A5.2.4 HVAC Control Philosophy 26-May-19 30-May-19
08:00 AM 04:00 PM HVAC Control Philosophy
LT18102700.5.3 Drawings for HVAC/Plumbing, Drainage and Irrigation 01-Jun-19 08:00
28-Jul-19
AM 04:00 PM 28-Jul-19 04:00 PM, LT18102700.5.3 Drawings for HVAC/Plumbing,Drain ag
A5.3.001 Potable water piping layout 01-Jun-19 08:00
05-Jun-19
AM 04:00 PM Potable water piping layout
A5.3.002 External Irrigation Piping layout 06-Jun-19 08:00
11-Jun-19
AM 04:00 PM External Irrigation Piping layout
A5.3.003 Building Internal Driange Layout 12-Jun-19 08:00
17-Jun-19
AM 04:00 PM Building Internal Driange Layout
A5.3.004 Standard Detailed drawings for Irrigation ,Potable water piping and Drainage
18-Jun-19 08:00
23-Jun-19
AM 04:00 PM Standard Detailed drawings for Irrigation ,Potable water piping and Drainage
A5.3.005 Coordination / interface Layout of new piping and old piping 24-Jun-19 08:00
29-Jun-19
AM 04:00 PM Coordination / interface Layout of new piping and old piping
A5.3.006 Provision for new irrigation system with automatic controls of the remote
30-Jun-19
vegetated
08:00
04-Jul-19
areas
AM 04:00 PM Provision for new irrigation system with automatic controls of the remote vegetated areas
A5.3.007 HVAC Layout and Sections 06-Jul-19 08:00
10-Jul-19
AM 04:00 PM HVAC Layout and Sections

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 2 of 4
08-Jun-18 11:0... #1
Actual Work Critical Remaining Work summary
Prepared By : Shiyam, iFluids Engg
FEED for Upgrade & Replacement of Fire Protection Systems at
Berth No. 6, MIC Port
Activity ID Activity Name Start Finish Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A5.3.008 HVAC Control Schematic 11-Jul-19 08:00
16-Jul-19
AM 04:00 PM HVAC Control Schematic
A5.3.009 HVAC Air Flow Diagram 17-Jul-19 08:00
22-Jul-19
AM 04:00 PM HVAC Air Flow Diagram
A5.3.010 HVAC Standard Details 23-Jul-19 08:00
28-Jul-19
AM 04:00 PM HVAC Standard Details

LT18102700.6 Electrical 14-Aug-18 08:00


16-Oct-18
AM 04:00 PM 16-Oct-18 04:00 PM, LT18102700.6 Electrical

LT18102700.6.1 Electrical Engineering documents 14-Aug-18 08:00


29-Sep-18
AM 04:00 PM 29-Sep-18 04:00 PM, LT18102700.6.1 Electrical Engineering documents
A6.1.1 Estimate electrical load requirement 14-Aug-18 08:00
19-Aug-18
AM 04:00Estimate
PM electrical load requirement
A6.1.2 Techno-economic study of all tie-in options for power supply to electrical
20-Aug-18
and instrumentation
08:00
25-Aug-18
AM 04:00
systems
PMTechno-economic study of all tie-in options for power supply to electrical and instrumentation systems
A6.1.3 Site survey to identify the nearest source of power for normal and UPS
26-Aug-18
power 08:00
30-Aug-18
AM 04:00 PM Site survey to identify the nearest source of power for normal and UPS power
A6.1.4 Study modifications required in the existing switchboard and Distribution
01-Sep-18
boards 08:00
05-Sep-18
AM 04:00 PM Study modifications required in the existing switchboard and Distribution boards
A6.1.5 Adequacy check for existing switchboard, UPS DB and other normal 06-Sep-18
DB as required
08:00
11-Sep-18
AM 04:00 PM Adequacy check for existing switchboard, UPS DB and other normal DB as required
A6.1.6 Specifications and data sheets for all relevant electrical equipment 12-Sep-18 08:00
17-Sep-18
AM 04:00 PM Specifications and data sheets for all relevant electrical equipment
A6.1.7 Necessary electrical design calculations 18-Sep-18 08:00
23-Sep-18
AM 04:00 PM Necessary electrical design calculations
A6.1.8 Confirmation from OEM for modification in the existing SWBD of Tridel
24-Sep-18
make, ABB
08:00
29-Sep-18
canAM
also 04:00
be contacted
PM Confirmation from OEM for modification in the existing SWBD of Tridel make, ABB can also be contacted
LT18102700.6.2 Electrical Engineering Drawings 30-Sep-18 08:00
16-Oct-18
AM 04:00 PM 16-Oct-18 04:00 PM, LT18102700.6.2 Electrical Engineering Drawings
A6.2.1 Electrical equiment & earthing layout drawings 30-Sep-18 08:00
04-Oct-18
AM 04:00 PM Electrical equiment & earthing layout drawings
A6.2.2 Cable routing & Lighting and earthing detail drawings 06-Oct-18 08:00
10-Oct-18
AM 04:00 PM Cable routing & Lighting and earthing detail drawings
A6.2.3 SLD as required 11-Oct-18 08:00
16-Oct-18
AM 04:00 PM SLD as required

LT18102700.7 Tech HSE - Safety 05-Dec-18 08:00


23-Jan-19
AM 04:00 PM 23-Jan-19 04:00 PM, LT18102700.7 Tech HSE - Safety

LT18102700.7.1 Tech HSE Safety - General 09-Dec-18 08:00


31-Dec-18
AM 04:00 PM 31-Dec-18 04:00 PM, LT18102700.7.1 Tech HSE Safety - General
A7.1.1 Project HSE plan 09-Dec-18 08:00
13-Dec-18
AM 04:00 PM Project HSE plan
A7.1.2 Project specific Fire and Safety philosophy 15-Dec-18 08:00
19-Dec-18
AM 04:00 PM Project specific Fire and Safety philosophy
A7.1.3 Update and Maintain HSE Register through out project 20-Dec-18 08:00
25-Dec-18
AM 04:00 PM Update and Maintain HSE Register through out project
A7.1.4 Design Basis Memorandum 26-Dec-18 08:00
31-Dec-18
AM 04:00 PM Design Basis Memorandum
LT18102700.7.2 Tech HSE & Process Safety Studies 01-Jan-19 08:00
23-Jan-19
AM 04:00 PM 23-Jan-19 04:00 PM, LT18102700.7.2 Tech HSE & Process Safety Studies
A7.2.1 Conduct HAZID study 01-Jan-19 08:00
06-Jan-19
AM 04:00 PM Conduct HAZID study
A7.2.2 Conduct Process Safety Design Review 07-Jan-19 08:00
12-Jan-19
AM 04:00 PM Conduct Process Safety Design Review
A7.2.3 Conduct HAZOP study 13-Jan-19 08:00
17-Jan-19
AM 04:00 PM Conduct HAZOP study
A7.2.4 Conduct SIMOPS Study, FERA, Availability of Firewater System during
19-Jan-19
construction
08:00
23-Jan-19
AM 04:00 PM Conduct SIMOPS Study, FERA, Availability of Firewater System durin g construction
LT18102700.7.3 Tech HSE (P&IDS, Calculations and Safety Layouts) 05-Dec-18 08:00
08-Jan-19
AM 04:00 PM 08-Jan-19 04:00 PM, LT18102700.7.3 Tech HSE (P&IDS, Calculations and Safety Layouts)
A7.3.1 Update Hazardous Area Classification drawing 05-Dec-18 08:00
10-Dec-18
AM 04:00 PM Update Hazardous Area Classification drawing
A7.3.2 Update Fire proofing layout 11-Dec-18 08:00
16-Dec-18
AM 04:00 PM Update Fire proofing layout
A7.3.3 Demand/Hydraulic Calculations 17-Dec-18 08:00
22-Dec-18
AM 04:00 PM Demand/Hydraulic Calculations
A7.3.4 Data sheets/Specification 23-Dec-18 08:00
27-Dec-18
AM 04:00 PM Data sheets/Specification
A7.3.5 Code Plans, Escape Routes, P&ID, Safety Equipment and Safety Sign
29-Dec-18
Layouts 08:00
02-Jan-19
AM 04:00 PM Code Plans, Escape Routes, P&ID, Safety Equipment and Safety Sign Layouts
A7.3.6 Fire Zone layouts, F&G Layouts, Cause & Effect 03-Jan-19 08:00
08-Jan-19
AM 04:00 PM Fire Zone layouts, F&G Layouts, Cause & Effect

LT18102700.8 Tech HSE - ENVIRONMENTAL 19-Dec-18 08:00


10-Jan-19
AM 04:00 PM 10-Jan-19 04:00 PM, LT18102700.8 Tech HSE - ENVIRONMENTAL

LT18102700.8.1 Environment Design and Engineering 19-Dec-18 08:00


10-Jan-19
AM 04:00 PM 10-Jan-19 04:00 PM, LT18102700.8.1 Environment Design and Engineering
A8.1.1 Conduct ENVID Workshop/ Study 19-Dec-18 08:00
24-Dec-18
AM 04:00 PM Conduct ENVID Workshop/ Study
A8.1.2 Update/ prepare the ERR 25-Dec-18 08:00
30-Dec-18
AM 04:00 PM Update/ prepare the ERR
A8.1.3 Prepare a Report on Waste (Construction / Demolition) 31-Dec-18 08:00
05-Jan-19
AM 04:00 PM Prepare a Report on Waste (Construction / Demolition)
A8.1.4 Prepare Permit/Exemption Application including Technical Support Document
06-Jan-19 08:00
10-Jan-19
AM 04:00 PM Prepare Permit/Exemption Application including Technical Support Document

LT18102700.9 Telecomunications 29-Jul-19 08:00


26-Aug-19
AM 04:00 PM 26-Aug-19 04:00 PM, LT18102700.9 Telecomunications

LT18102700.9.1 TEL/01 29-Jul-19 08:00


26-Aug-19
AM 04:00 PM 26-Aug-19 04:00 PM, LT18102700.9.1 TEL/01
A9.1.1 Design CCTV and Access Control System 29-Jul-19 08:00
03-Aug-19
AM 04:00 PM Design CCTV and Access Control System
A9.1.2 Design Structured Cabling network 04-Aug-19 08:00
08-Aug-19
AM 04:00 PM Design Structured Cabling network
A9.1.3 Design Building Management system based on DDCs 10-Aug-19 08:00
14-Aug-19
AM 04:00 PM Design Building Management system based on DDCs
A9.1.4 Design Public Address and General Alarm System 15-Aug-19 08:00
20-Aug-19
AM 04:00 PM Design Public Address and General Alarm System
A9.1.5 Design TETRA and VHF communication systems 21-Aug-19 08:00
26-Aug-19
AM 04:00 PM Design TETRA and VHF communication systems

LT18102700.10 CIVIL and STRUCTURAL 05-Feb-19 08:00


10-Mar-19
AM 04:00 PM 10-Mar-19 04:00 PM, LT18102700.10 CIVIL and STRUCTURAL

LT18102700.10.1 Design Calculations 05-Feb-19 08:00


16-Feb-19
AM 04:00 PM 16-Feb-19 04:00 PM, LT18102700.10.1 Design Calculations
A10.1.1 CONTRACTOR shall prepare engineering design calculations for all 05-Feb-19
civil/structural
08:00
10-Feb-19
items
AM 04:00 PM CONTRACTOR shall prepare engineering design calculations for all civil/structural items
A10.1.2 Building / shelter design parameters and calculations 11-Feb-19 08:00
16-Feb-19
AM 04:00 PM Building / shelter design parameters and calculations
LT18102700.10.2 Specifications for Civil / Structural Works 19-Feb-19 08:00
02-Mar-19
AM 04:00 PM 02-Mar-19 04:00 PM, LT18102700.10.2 Specifications for Civil / Structural Works
A10.2.1 Prepare Specifications for Architectural, Civil and Structural Materials 19-Feb-19
and Works,08:00
24-Feb-19
not covered
AM 04:00
by QP
PMSpecifications Prepare Specifications for Architectural, Civil and Structural Materials and Works, not covered by QP Specifications
A10.2.2 Quantities Estimation for Costing 25-Feb-19 08:00
02-Mar-19
AM 04:00 PM Quantities Estimation for Costing
LT18102700.10.3 Civil & Structural Drawings 05-Mar-19 08:00
10-Mar-19
AM 04:00 PM 10-Mar-19 04:00 PM, LT18102700.10.3 Civil & Structural Drawings

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 3 of 4
08-Jun-18 11:0... #1
Actual Work Critical Remaining Work summary
Prepared By : Shiyam, iFluids Engg
FEED for Upgrade & Replacement of Fire Protection Systems at
Berth No. 6, MIC Port
Activity ID Activity Name Start Finish Qtr 3, 2018 Qtr 4, 2018 Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
A10.3.1 Develop FEED Project Specific Design and drawings for the Civil / Structural
05-Mar-19
works
08:00
10-Mar-19
as specified
AM 04:00 PM Develop FEED Project Specific Design and drawings for the Civil / Structural works as specified

LT18102700.11 ARCHITECTURAL 11-Mar-19 08:00


25-Apr-19
AM 04:00 PM 25-Apr-19 04:00 PM, LT18102700.11 ARCHITECTURAL

LT18102700.11.1 Architectural Works 11-Mar-19 08:00


25-Apr-19
AM 04:00 PM 25-Apr-19 04:00 PM, LT18102700.11.1 Architectural Works
A11.1.1 Conduct site review for determining location of all buildings and structures
11-Mar-19 08:00
16-Mar-19
AM 04:00 PM Conduct site review for determining location of all buildings and structures
A11.1.2 Conduct review of Fire Control Building size and siting 17-Mar-19 08:00
21-Mar-19
AM 04:00 PM Conduct review of Fire Control Building size and siting
A11.1.3 Conduct review and verification of Fire Control Building requirements23-Mar-19 08:00
27-Mar-19
AM 04:00 PM Conduct review and verification of Fire Control Building requirements
A11.1.4 Conduct review of Fire Water Pump House location, size and layout 28-Mar-19 08:00
02-Apr-19
AM 04:00 PM Conduct review of Fire Water Pump House location, size and layout
A11.1.5 Prepare project specific vendor list for architectural materials and finishes
03-Apr-19 08:00
08-Apr-19
AM 04:00 PM Prepare project specific vendor list for architectural materials and finishes
A11.1.6 Prepare list of furniture and equipment for the Fire Control Building 09-Apr-19 08:00
14-Apr-19
AM 04:00 PM Prepare list of furniture and equipment for the Fire Control Building
A11.1.7 Prepare Specifications for Architectural Works 15-Apr-19 08:00
20-Apr-19
AM 04:00 PM Prepare Specifications forArchitectural Works
A11.1.8 Quantities Estimation and Costing for architectural works 21-Apr-19 08:00
25-Apr-19
AM 04:00 PM Quantities Estimation and Costing for architectural works

Actual Level of Effort Remaining Work Milestone Date Revision Checked Approved
Page 4 of 4
08-Jun-18 11:0... #1
Actual Work Critical Remaining Work summary
Prepared By : Shiyam, iFluids Engg