Beruflich Dokumente
Kultur Dokumente
Chapter 2 Exam
Due No due date Points 16 Questions 16 Time Limit None
Attempt History
Attempt Time Score
LATEST Attempt 1 8 minutes 15 out of 16
Question 1 0 / 1 pts
The help desk receives several calls on Monday morning stating that users
cannot connect to a local print server that was working on Friday. Which
statement about the problem would be correct?
orrect Answer
The inability to connect to the print server is a symptom of a problem.
You Answered The inability to connect to the print server caused the problem.
Refer to Chapter 2.
Question 2 1 / 1 pts
https://1303036.netacad.com/courses/854328/quizzes/7717625 1/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
A cable is unplugged.
Refer to Chapter 2.
Question 3 1 / 1 pts
a user who is unable to connect to machines that are located on the same
subnet
Refer to Chapter 2.
https://1303036.netacad.com/courses/854328/quizzes/7717625 2/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Question 4 1 / 1 pts
Correct!
following a structured and systematic process
Refer to Chapter 2.
Question 5 1 / 1 pts
A user creates a trouble ticket indicating that the Internet is inaccessible. The
network administrator receives the ticket and determines that this user is the
only one having problems. A ping command issued from the administrative
PC to the user PC is successful. What should the administrator do next?
Correct!
Escalate the issue to the desktop support group.
View the route table on the core router to determine if there is a routing issue.
Swap out the patch cable between the user PC and the switch to determine if
that solves the problem.
https://1303036.netacad.com/courses/854328/quizzes/7717625 3/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Refer to Chapter 2.
Question 6 1 / 1 pts
Refer to Chapter 2.
Question 7 1 / 1 pts
Gather facts.
https://1303036.netacad.com/courses/854328/quizzes/7717625 4/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Refer to Chapter 2.
Question 8 1 / 1 pts
Refer to Chapter 2.
Question 9 1 / 1 pts
https://1303036.netacad.com/courses/854328/quizzes/7717625 5/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Refer to Chapter 2.
Question 10 1 / 1 pts
Solving the problem would showcase the skills and knowledge of the
troubleshooter.
Refer to Chapter 2.
Question 11 1 / 1 pts
https://1303036.netacad.com/courses/854328/quizzes/7717625 6/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Correct!
Escalate.
Gather information.
Propose a solution.
Test a hypothesis.
Refer to Chapter 2.
Question 12 1 / 1 pts
Propose a hypothesis.
Correct!
Execute the rollback plan.
Refer to Chapter 2.
https://1303036.netacad.com/courses/854328/quizzes/7717625 7/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Question 13 1 / 1 pts
Correct!
Rollback the change and resume the troubleshooting process.
Leave the change in place and troubleshoot the new problems at a later time.
Gather information about the new problem and form a new hypothesis.
Refer to Chapter 2.
Question 14 1 / 1 pts
Correct!
when insufficient knowledge and skills exist
Correct!
when shift work requires handing off the problem
https://1303036.netacad.com/courses/854328/quizzes/7717625 8/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
when the cause of the problem is within the area of responsibility of the
troubleshooter
Refer to Chapter 2.
Question 15 1 / 1 pts
Correct!
define the problem phase
Refer to Chapter 2.
Question 16 1 / 1 pts
https://1303036.netacad.com/courses/854328/quizzes/7717625 9/10
10/7/2019 Chapter 2 Exam: DPR7501-001V CCNPT 2019-1
Refer to Chapter 2.
https://1303036.netacad.com/courses/854328/quizzes/7717625 10/10