ROOF TERRACE DRAINAGE DETAIL

Drainage system will be lead through inside structure


(structural openings) to avoid having pipes on exterior
of the building. Terrace will have required slope where
water will go into trenches and be transfered into syphonic
drain system.

Section view
Rigid insulation thickness acc. u-value The pedestals are made
(This insulation from outer layer has a corten of high density polypropylene,
steel panel cladding) so they are impervious to water,
mold or rot. When the rainfall is heavy enough, the gullies
Wooden oak lumbers create reduced pressure in the pipe sys-
of at least 20 mm thick tem. This means that increased drainage
Floating roof deck system legs performance level can be achieved com-
Wooden battens manualy adjustable acc. heigth required pared to simple gravity drainage.

Syphonic drainage systems operate with


specially designed flat roof drains which,
unlike gravity drainage systems, are
configured to work with completely full
pipes.

This can only be achieved by assuring


amongst other things that no air is su-

Min. 150 mm
Base and venting sheet Vapour barrier sheet cked in with the rain water to form bubble
vortexes in the pipe systems.
Fillet DPC membrane

Slope of 2% (4cm every meter)


A siphonic roof drain is designed to operate
at full capacity when water is vacuumed
from the roof into the drain at higher velocities
when compared to flat drains. These roof
drains allow the designer to install a minimal
number of roof drains and have them
connected to a single rain leader.

The siphonic roof drain utilizes siphoning


Rigid insulation 300 - 150 mm as a mechanism to drain water faster than
any other roof drain. It normally costs more
than a regular roof drain but it works smoothly
and reduces the need for maintenance. This
type of drain can be connected using
horizontal rain leaders instead of having
sloped or downward pipes.

Damp proof membrane Hollow core deck with structural opening


Architect Engineer Manufacturer
Roof drainage system
(see manufacturers spec.)
MAIN PROJECT
Project name:
Project Name
Title:
NOTE: Drainage is leaded through inside structure. Roof terrace drainage
Sizes of materials varries, depending on manufacturers
Drawn by:
specificationsand in order to meet BR15 requirements
of energy efficiency (u-value) further calculations are needed.
Checked by:

Scale: Date: Sheet:


04/30/18
BIPS number:

I5_A6_K08_H03_ET_N1008