This tutorial demonstrates how to
model and perform analysis for a
steel pipe-reinforced multi-step
grouting method.
„ GTSTutorial 35_start.gtb „.
Steel Pipe
Reinforced Area
Attribute)
Ground, Upper
Tunnel Sect.,
5-Grade Rock (1) Solid 5-Grade Rock (1) - Lower Tunnel
Section,
Reinforced Zone.
Reinforced Zone Reinforced Zone
Reinforced Zone (2) Solid -
(2) (1-6)
Upper S/C,
Soft S/C (3) Plane Soft S/C (3) Shotcrete (1)
Lower S/C
Upper S/C,
Hard S/C (4) Plane Hard S/C (4) Shotcrete (1)
Lower S/C
Upper R/B,
Rock Bolt (5) Line Rock Bolt (5) Rock Bolt (2)
Lower R/B
Pipe Umbrella Pipe Umbrella
Pipe Umbrella (6) Line Pipe Umbrella (6)
(3) (1-6)
Material
ID 1 2 3 4
Name 5-Grade Rock Reinforced Zone Soft S/C Hard S/C
Type Solid Solid Plane Plane
Modulus of
50,000 150,000 500,000 1,500,000
Elasticity(E)[tonf/m2]
Poisson‟s Ratio(ν) 0.3 0.3 0.2 0.2
Unit Weight
2.2 2.2 2.4 2.4
(Y) [tonf/m3]
Unit Weight
2.2 2.2 - -
(Saturated) [tonf/m3]
Cohesion(c)
30 60 - -
[tonf/m2]
Friction Angle(Φ) 30 30 - -
K0 1 1 - -
Structure
Modulus of Unit
Material/ Poisson‟s Diameter
Elasticity(E) Weight(Y)
Property Ratio(ν) [m]
[tonf/m2] [tonf/m3]
Modulus Unit
Material/ Poisson‟s Diameter
of Elasticity Weight (Y)
Property Ratio(ν) [m]
(E) [tonf/m2] [tonf/m3]
Pipe
21,000,000 0.3 7.85 0.0605
Umbrella
5. Click [Apply].
3. Click [Apply].
Merge Edge
4. Similarly create Plane Faces
for „Lower Tunnel Section‟
and „Back-end Reinforced
Zone‟ .
5. Click [Apply].
5. Click [OK].
3. Click [OK].
5. Click [OK].
3. Select „Move‟.
6. Click [OK].
4. Click [OK].
4. Click [OK].
6. Click [OK].
4. Click [OK].
5. Click [OK].
4. Click [OK].
.
.
.
.
.
5. Click [OK].
7. Click [Apply].
6. Click [OK].
3. Click [Apply].
Merged
edges
6. Click [Apply].
Faces].
6. Click [Apply].
4. Click [OK].
6. Click [Apply].
7. Click [OK].
6. Click [Apply].
3. Click [Apply].
5. Click [Apply].
4. Click [Apply].
7. Click [Apply].
4. Click [Apply].
5. Click [OK].
5. Click [OK].
8. Click [OK].
9. Click [Apply].
5. Click [Apply].
6. Click [OK].
5. Click [Apply].
edit.
5. Click [OK].
7. Click [OK].
Reinforced Zone.
Tunnel with Pipe Umbrella 41
34
Step
MIDAS IT Co., Ltd.
Model > Transform > Translate
Procedure
1. Main Menu> Model >
Transform > Translate…
5. Click [Apply].
6. Click [Apply].
6. Click [Apply].
5. Click [OK].
4. Click [OK].
5. Click [Apply] .
8. Click [OK].
6. Click [Apply].
3. Click [Save].
2. Click [Insert].
5. Click [Save].
3. Click [Save].
6. Click [Save].
3. Click [Save].
6. Click [Save].
3. Click [Save].
2. Click [Add].
7. Click [OK].
3. Click [OK].
5. Click [OK].
6. Click [Apply].
3. Click [Apply].
6. Click [Table].
4. Click [OK].
7. Click [Add].
8. Check-on [Grid].
9. Click [OK].
LB Point
4. Click [Add].