Floor finish = 50 mm Dead Load 2 125 mm thk slab= 0.125x2.5= 0.31 T/m 2 50 mm thk floor finish = 0.05x2.4= 0.12 T/m 2 0.43 T/m Live Load 2 L.L= 0.20 T/m 2 Total D.L+L.L= 0.433 + 0.2 = 0.63 T/m
Ly = 4.26 m Lx = 4m Ly/Lx = 1.07 <2 It is a two way slab
Refer IS: 456 Table 26:
Type of panel: Two adjacent edges discontinuous Case no. 4 −αx= 0.0512 −αy= 0.0470 αx= 0.0378 αy= 0.0350
Max (-) ve moment @ continuous edge = -αx w lx2
= -0.0512x0.633x4^2 = 0.519 T-m Max (+) ve moment @ mid span = αx w lx2 = 0.0378x0.633x4^2 = 0.383 T-m
Max (-) ve moment @ continuous edge = -αy w lx2
= -0.047x0.633x4^2 = 0.476 T-m Max (+) ve moment @ mid span = αy w lx2 = 0.035x0.633x4^2 = 0.354 T-m Clear cover= 25 mm 2 fck= 25 N/mm 2 Fy= 500 N/mm Load factor = 1.5 For Support in short direction M= 0.519 T-m Mu= 0.779 T-m dia of bar= 8 mm d= 125-25-8/2 = 96 mm Mu/bd2 = 0.7785x10^7/(1000x96^2) 2 = 0.845 N/mm Pt= 0.20 % Ast= 0.202x100x9.6/100 2 = 1.94 cm Max spacing= 259.1 mm Spacing provided= 150 mm 2 3.35 cm Provide 8 dia @150c/c(3.35cm2) at top in short direction For Span in short direction M= 0.383 T-m Mu= 0.575 T-m dia of bar= 8 mm d= 125-25-8/2 = 96 mm Mu/bd2 = 0.5745x10^7/(1000x96^2) 2 = 0.623 N/mm Pt= 0.15 % Ast= 0.148x100x9.6/100 2 = 1.42 cm Max spacing= 354 mm Spacing provided= 150 mm 2 3.35 cm Provide 8 dia @150c/c(3.35cm2) at bottom in short direction For Support in long direction M= 0.476 T-m Mu= 0.714 T-m dia of bar= 8 mm d= 125-25-8/2 = 96 mm Mu/bd2 = 0.714x10^7/(1000x96^2) 2 = 0.775 N/mm Pt= 0.19 % Ast= 0.185x100x9.6/100 2 = 1.78 cm Max spacing= 282.4 mm Spacing provided= 150.0 mm 2 3.35 cm Provide 8 dia @150c/c(3.35cm2) at top in long direction For Span in long direction M= 0.354 T-m Mu= 0.531 T-m dia of bar= 8 mm d= 125-25-8/2 = 96 mm Mu/bd2 = 0.531x10^7/(1000x96^2) 2 = 0.576 N/mm Pt= 0.136 % Ast= 0.136x100x9.6/100 2 = 1.31 cm Max spacing= 383.7 mm Spacing provided= 150 mm 2 3.35 cm Provide 8 dia @150c/c(3.35cm2) at bottom in long direction Check for shear x direction= Pt provided = 0.349 % 2 τc = 0.42 N/mm Shear capacity= 0.421x1000x96/10000 = 4.042 T Shear at middle of short span= 0.633x4/3 = 0.844 T Vu= 1.5x0.844 = 1.266 T < 4.042 T ok Check for shear y direction= Pt provided = 0.349 % 2 τc = 0.42 N/mm Shear capacity= 0.421x1000x96/10000 = 4.042 T Shear at middle of long span= wlxk/(2k+1) = 0.633x4x1.07/(2x1.07+1) = 0.86 T Vu= 1.5x0.86 = 1.29 T < 4.042 T ok CHECK FOR DEFLECTION :- EFECTIVE SPAN OF STAIR le = 4000.00 MM EFFECTIVE SPAN/EFFECTIVE DEPTH = le /de = 4000/96 = 41.7 PERCENTAGE OF TENSION REINF. AT SPAN ,pt,span = 0.349 SERVICE STRESS IN TENSION RENFORCEMENT (fs ) = (0.58 x 500 x 1.94) / (3.35) = 167.9 MODIFICATION FACTOR FOR TENSION REINFORCEMENT = 2 (FIG. 4 OF IS PERCENTAGE OF COMPRESSION REINF. AT SPAN , pc,span = 0.349 456:2000) MODIFICATION FACTOR FOR COMPRSS. REINFORCEMENT = 1.1 (FIG. 5 OF IS SPAN / EEFFECTIVE DEPTH FOR CONT. SLAB = 26 456:2000) MODIFIED VALUE OF SPAN /EFFECTIVE DEPTH = 57.2 SATISFIED