4.

16 CLEAR WATER HIGH LIFT PUMP HOUSE

a) Number of Pump House : 1(One)

b) Number of High Lift Pump : 6 ( 4W + 2S )


Sets
c) Number of Backwash Tank : 2 ( 1W + 1S )
(ESR) Filling Pumps
d) Number of Dewatering Pumps : 2 ( 1W + 1S )

[Volume-I, Page 20 of 96]


e) Type of High Lift Pump House : 2 (two) tier

f) Type of High Lift Pumps : Horizontal Centrifugal Split


Casing
g) Type of ESR Filling Pumps : Horizontal Centrifugal Split
Casing
h) Type of Dewatering Pumps : Horizontal Centrifugal Self
Priming
i) Suction Condition of High Lift : Flooded / Positive suction
& ESR Filling Pumps
j) Accessories of all Pumps : Electric Motor, Base Frame,
Flexible Coupling, Coupling
Guard, Foundation Bolts,
Companion Flange etc.
k) Synchronous speed of High : Not exceeding 1500 rpm
lift pumps
l) Size of Pump House : To be decided by the Bidder
m) Plinth Level : 600 mm above FGL
n) Minimum Height of Pump : 4.5 m. above GL. excluding
House the height required for Gantry
Crane.
o) Unloading Bay : To be provided by Contractor

p) Electrical Panel : To be provided on Plinth Level


q) Discharge Capacity of each : 1746
High Lift Pump (Min.)
Cum/Hr.
r) Motor Kilowatt rating of High : 700 KW
Lift Pumps
s) Discharge Capacity of each To be decided by the bidder
Backwash Tank filling pump
(ESR) in Cum / Hr
t) Discharge Head of each High : 96 m
Lift Pump (max)
u) Discharge Head of each : 20m
Backwash Tank (ESR) filling
pump (max)
v) Capacity and Head of other : To be decided by the Bidder
Pumps
w) Pipe work in suction line for : MS – ERW / SW pipes and
each pump with Valves & fittings double flanged
other equipments complete with 1(one) no. bell
mouth at sump end, 1(one)
no. gate valve(electrically
operated), 1(one) no.
dismantling joint, 1(one) no.
compound gauge. Thickness
of pipes and fittings and PN
[Volume-I, Page 21 of 96]
rating of valve shall be as per
duty condition, Valves etc.
shall have same size as that of
suction pipe size (suction
velocity below 1 m/sec).
x) Pipe work in delivery line for : MS – ERW / SW pipes and
each pump (inside pump fittings double flanged
house) with Valves & other complete with 1(one) no.
equipments upto common motorized butterfly valve,
header 1(one) no. Dual check non –
return valve, 1(one) no.
dismantling joint, 1(one) no.
pressure transmitter and
sensor. Thickness of pipes
and fittings and PN rating of
valves and other gadgets shall
be as per duty condition
considering discharge head /
pressure. Valves etc. shall
have same as that of delivery
pipe.
y) Pipe work in common delivery : MS – ERW / SW pipes and
header within pump house fittings double flanged
and upto boundary limit of complete with 1(one) no.
WTP with Valves & other motorized butterfly valve,
equipments. 1(one) no. electromagnetic
flow meter, 1(one) no.
dismantling joint shall be
provided. Necessary straight
length of pipes at upstream
and downstream for flow
meter shall be provided.
Selection of pipe material,
valve, flow meter etc. shall be
as per duty condition
considering discharge head /
pressure. Valves etc, shall
have same size as that of
common delivery pipe.
z) EOT Gantry Crane : 1(one) no. of 10 Ton capacity
EOT Crane complete for
longitudinal and latitudinal
movement besides up and
down movement or the
capacity shall be min. 1.5
times the weight of the
heaviest equipment of the
pump house, whichever is
higher .

[Volume-I, Page 22 of 96]


aa) Pipe, Valves etc of ESR Filling : To be provided as per
& Dewatering Pumps at WTP. requirement.
ab) Ventilation system : 12 air changes per hour

[Volume-I, Page 23 of 96]