DAFTAR KUANTITAS DAN HARGA

PEKERJAAN : PEMBANGUNAN INSTALASI PENGOLAHAN AIR LIMBAH ( IPAL )


LOKASI : PASAR SUKAMAJU, KABUPATEN LUWU UTARA
TAHUN ANGGARAN : 2019

KODE HARGA SAT JUMLAH HARGA TOTAL HARGA


NO JENIS PEKERJAAN VOL SAT.
ANALISA Rp. Rp. Rp.
a b c d e f g h

I PENGADAAN DAN PEMASANGAN MESIN IPAL


1 Bar Screen 1 Pcs - -
Bahan : FRP + Stainless Steel
Dimensi : 400 x 400 x 500 mm
2 Bio Reactor Treatment 1 Unit - -
Type : IP-BRT atau Setara
Model : AG12.5-Biomedia
Material : FRP, Resin of Chemicals Resistance
Volume Effectve : 10,5 M3
Micro Attact : Biomedia, Honeycom Contact Media, 4,45 M3
Main Partission : Fakultative, aerobic and sediment
compartment, include media supporting
Diffuser : Tube bubble point system, with inside
piping 2,5 inchi, and holding rubber cover
for air Distribution, 10 pcs
Blower : 3 Unit For Air distribution in facultative
and aerob compartment
Sprayer and sludge pump : Defoamer and range of activeated sludge
Tube Clorinator : Tube 6 Inch
3 Summersible Feed Pump + Accessories 2 pcs - -
Capasitas : Minimal 10 M3/h
Head : Minimal 8 Meter
Power : 0,37 Kw, 1 Phase
Acc : Valve, Sock, Knee dll
4 Chemicals Tank 1 Pcs - -
Capasitas : Minimal 200 liter
Material : FRP
5 Filter Tank 1 Unit - -
Dimensi : Dia x h = 500 mm X 1850 mm
Media : Multimedia
6 Unit pH Control + Accessories 1 pcs - -
Model : pH/ORP-661/2
Sensor : pH Sensor
Measurement Range : 0.00 sd 14.00
Display : LCD display
Resolustion : 0.01 pH
Temp Compensation : 0 up to 99 C
7 Dosing Pump + Accessories 1 pcs - -
Type : AKL 800 NHH 0000
Flow Rate : 7, 10, 15, 18
Pressure : 16, 10, 5, 1
: PVDF, PTFE, CERAMIC, FPM
Connections : 4/6 mm
Power : 40 Watt
Freq Max : 300 Stroke/min
8 Panel Control + Wiring 1 Unit - -
Sistim Instalasi : Outdoor
Double Handle + Include mimik diagram untuk
Untuk Petunjuk flow proses
9 BM EKOSYM 160 liter - -
Bentuk : Liquid
Function :
10 Trap care 60 Pcs - -
Jenis : Bacteria for seeding
Bnetuk : Tablet
11 Desinfectant 15 Box - -
Jenis : Tablet
Jumlah Pengadaan dan Pemasangan Mesin Ipal -
KODE HARGA SAT JUMLAH HARGA TOTAL HARGA
NO JENIS PEKERJAAN VOL SAT.
ANALISA Rp. Rp. Rp.
a b c d e f g h
II PEK. PERSIAPAN & ADMINISTRASI
1 Pekerjaan Pengukuran/Pas.bowplank A. 2.2.1.4 5.00 m' - -
Jumlah Pekerjaan Persiapan -
III PEKERJAAN PONDASI DAN ATAP MESIN IPAL
1 Galian Tanah A. 2.3.1.2 4.71 m3 - -
2 Urugan Tanah Kembali A.2.3.1.9 0.15 m3 - -
3 Batu kosong A. 3.2.1.9 1.28 m3 - -
4 Pasangan Pondasi A. 3.2.1.3 3.28 m3 - -
5 Urugan Pasir Bawah Lantai A.2.3.1.11 1.06 m3 - -
6 Urugan Pasir Bawah Pondasi A.2.3.1.11 0.49 m3 - -
7 Pekerjaan Lantai kerja K 100 A.4.1.1.1 0.50 m3 - -
8 Pekerjaan Plat Beton bertulang 150 kg besi A. 4.1.1.28 1.31 m3 - -
9 Pasangan Atap Kanopi Polycarbonat +Rangka Besi 19.80 m2 - -
10 Pasangan Tiang Rangka Besi 6.00 ls - -
Jumlah Pekerjaan Pondasi dan Atap Mesin Ipal -
IV PEKERJAAN PELEBARAN GUTTER & PENEBALAN RABAT KELILING
1 Pek. Perbaikan Gutter 86.00 m1 - -
2 Pek. Penebalan Rabat Keliling T = 10 cm A. 4.1.1.1 6.01 m3 - -
Jumlah Pekerjaan Pelebaran Gutter -
V PEKERJAAN BAK EQUALISASI (1 UNIT)
Ukuran P=2.95m, L=1.5m, T=1.4m
Sistim Anaerobic
Operasi Manual
Konstruksi Beton
Jumlah 1 Unit
1 Galian Tanah A. 2.3.1.2 6.64 m3 - -
2 Buang tanah keluar areal proyek A. 2.3.1.8 6.64 m3 - -
3 Urugan Pasir A.2.3.1.11 0.44 m3 - -
4 Lantai kerja Beton Mutu fc' = 7.4 MPa (K-100) A.4.1.1.1 0.34 m3 - -
5 Pekerjaan Lantai Beton bertulang 150 kg besi A.4.1.1.28 0.34 m3 - -
6 Pekerjaan Dinding Beton bertulang 150 kg besi A.4.1.1.33 1.44 m3 - -
7 Pekerjaan Plat Beton bertulang 150 kg besi+Manhole A.4.1.1.28 0.31 m3 - -
8 Pekerjaan Pasangan pipa sok pvc 4" A.5.1.1.32 6.00 m' - -
Jumlah Pekerjaan Bak Equalisasi -
VI PEKERJAAN BAK GREASE TRAP (1 UNIT)
Ukuran P=2.25m, L=1m, T=1.4m
Sistim Anaerobic
Operasi Manual
Konstruksi Beton
Jumlah 1 Unit
1 Galian Tanah A. 2.3.1.2 3.38 m3 - -
2 Buang tanah keluar areal proyek A. 2.3.1.8 3.38 m3 - -
3 Urugan Pasir A.2.3.1.11 0.23 m3 - -
4 Lantai kerja Beton Mutu fc' = 7.4 MPa (K-100) A.4.1.1.1 0.23 m3 - -
5 Pekerjaan Lantai Beton bertulang 150 kg besi A.4.1.1.28 0.23 m3 - -
6 Pekerjaan Dinding Beton bertulang 150 kg besi A.4.1.1.33 0.88 m3 - -
7 Pekerjaan Plat Beton bertulang 150 kg besi+Manhole A.4.1.1.28 0.12 m3 - -
8 Pekerjaan Pasangan pipa sok pvc 4" A.5.1.1.32 4.00 M' - -
Jumlah Pekerjaan Bak Grease Trap -
VII PEKERJAAN BAK KONTROL (1 UNIT)
1 Galian Tanah A. 2.3.1.2 0.37 m3 - -
2 Urugan Pasir A. 2.3.1.8 0.02 m3 - -
3 Pasangan Bata 1/2 Batu. PC 1 : 2 A. 4.4.1.7 2.69 m2 - -
4 Pekerjaan Plesteran 1pc : 3 psr, t = 15mm A. 4.4.2.3 2.40 m2 - -
5 Pekerjaan Acian A. 4.4.2.27 2.40 m2 - -
6 pekerjaan Plat Penutup t = 2mm Ls 1.00 bh - -
Jumlah Pekerjaan Bak Kontrol -
KODE HARGA SAT JUMLAH HARGA TOTAL HARGA
NO JENIS PEKERJAAN VOL SAT.
ANALISA Rp. Rp. Rp.
a b c d e f g h
VIII PEKERJAAN PIPA SALURAN AIR LIMBAH
1 Galian Tanah Utk Pipa A. 2.3.1.2 7.20 m3 - -
2 Timbunan Kembali A. 2.3.1.9 2.40 m3 - -
3 Urugan Pasir di bawah Pipa A.2.3.1.11 1.80 m3 - -
4 Pasang Pipa Air Bekas, (Pipa PVC dia 2") A.5.1.1.29 30.00 m' - -
5 Pasang Pipa Limbah Lemak, (Pipa PVC dia 3") A.5.1.1.31 30.00 m' - -
Jumlah Pekerjaan Pipa Saluran Air Limbah -
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi Penerangan A.6.1.1.1 2.00 Ttk - -
2 Instalasi Stop Kontak A.6.1.1.2 1.00 Ttk - -
Jumlah Pekerjaan Instalasi Penerangan -
X PEKERJAAN AKHIR
1 Papan Nama Instalasi 1.00 ls - -
Jumlah Pekerjaan Akhir -
TOTAL REAL COAST -