Sie sind auf Seite 1von 12

Curriculum Vitae

Name : Sabri Bin Da


Address : No 8,Lorong Balok Perdana 1/3 , Perumahan Balok Perdana
26100 Kuantan,Pahang Darul Makmur
Contact No : +6 019-9518213
Nric No : 700616-06-5409
Date Of Birth : June 16th 1970
Sex : Male
Nationality : Malaysian
Marital Status : Married
Qualification : Malaysia Certificate of Education(SPM)
Language : Bahasa Malaysia & English(written and spoken)
E- Mail : sabrida_70@yahoo.com
Skype : darthvader698
Synopsis Of Profession Experiences

23 years of experienced in the oil and gas industries including safety,oil and gas pipeline On-
shore and Off-shore such as External and Internal Blasting,Painting and Coating,Anode
Casting & Installation,QA/QC Inspector,Coating and Painting Inspector.
To pursue a challenging of all aspects in the industry,also ensuring goals and objectives are
accomplished accordance with outlined priorities and requirements.

Proficient in the requirements of the Production Specifications,Project Procedures and


Inspections and Test Plan(ITP)for various types of coating and painting such as:

1. Painting 1,2 and 3 coat system(manual&spray application method)


-System1A(C/Steel-Blasting),5A1(C/Steel-Blasting),7A1(S/Steel-S.Blast),5B1
(C/Steel-P.Tool),6A(G/Steel-Abraded)&1C(C/Steel-P.Tool)
2 Fusion Bonded Epoxy (FBE)
3 Three Layer Polypropylene (3LPP)
4 Three Layer Polyethylene (3LPE)
5 Asphalt Enamel (AE)
6 Internal Flow Coating (IFC)
7 Concrete Weight Coating (CWC)
8 Synthetic Polyurethane(SPU)
9 5&7 Layer Polypropylene Foam(5&7LPPF)

CUSTOM COATING (Linepipes & Bends)

1. Glass Flake (GF)


2. Heat Shrink sleeve (HSS)
3. Three Coat System (TCS)
4. Neoprene Coating (NEO)
5. Injection Moulding Polypropylene(IMPP)
6. Polyurethane Foam Coating (PFC)

Involved in various field on-line testings such as:

1. Adverse weather report/conditions


2. Surface preparation for steel surface
3. Heating and coating/painting application.
4. Equipments calibration.
5. Thickness WFT,DFT and Holiday testings.
6. Examinings,Gauging and Inspections
Courses Attended

i) English For Specific Purpose conducted by IKIP-EIC


ii) Painting and Coating trained by Bredero Shaw (in-house course)
iii) Save Work Permit Issuance and Validation-OGP Technical Services Sdn. Bhd(in
house course)
iv) Corrosion Protection And Quality Control of the Coating Inspector Course
(IMM)
v) Certified Coating Inspector Level II from Institute Materials of Malaysia(IMM-
cert no:CI 263)
vi) Advance Safety Audit (A.S.A) BP U.K.(in house course)
vii) Coating And Corrosion Technology course conducted by IMM
viii) BGAS-CSWIP Painting Inspector Grade 2(Course)

WORKING EXPERIENCES

APR. 2018-May 2019-:Employed to JLM Engineering (M) Sdn. Bhd as Painting QC Inspector
for Turn Around Project(Plant Shut Down)and Maintenance Painting project at BASF-
PETRONAS Chemical Plant.

Resposibilities:
Monitoring,witnessed and inspection painting activities carried out by contractor crew as per
client approved specification and procedures.Inspection was carried out such as weather report
prior to start the activities,surface preparation,painting system,paint mixing preparation and
painting application.Painting was carried out as per client approved procedures ie:1,2 or 3 coat
paint system.Painting was carried out for low and high temp equipment such as linepipes,pipe
elbows,drums,tower,fire proofing,exchangers,channel heads and ext.

FEB.2018-MAR.2018:Employed to EURTRUE OVERSEAS PTE. LTD. as Coating Inspector


seconded to CHEVRON/CUEL for PHASE 53 Pipeline Project.

Responsibilities:
Monitoring,inspections and witnessed on FBE coating activities carried out by Bredero Shaw
Malaysia as coating contractor accordance to the project specifications, procedures,codes and
standards.Witnessed online,offline,field and lab. tests according to the client approved
procedures.Witnessed repair activites on damage coated pipes as of approved repair procedure.
JULY. 2017-SEPT.2017:Employed to JLM Engineering (M) Sdn. Bhd as Painting QC Inspector
for Maintenance Painting project at BASF-PETRONAS Chemical.

Resposibilities:
Monitoring,witnessed and inspection painting activities carried out by contractor crew as per
client approved specification and procedures.Inspection was carried out such as weather report
prior to start the activities,surface preparation,painting system,paint mixing preparation and
painting application.Painting was carried out as per client approved procedures ie:1,2 or 3 coat
paint system.Painting was carried out for low and high temp equipment such as linepipes,pipe
elbows,drums,tower,fire proofing,exchangers,channel heads and ext.

DEC.2016-MAY 2017:Employed to Quality Assurance inc.(QAinc) seconded to Trans Canada


Pipeline Limited(TCPL) as Coating Inspector for SUR DE TEXAS to TUXPAN(SDTT) Pipeline
Project.

Responsibilities:
Monitoring,witnessed and inspection on Dual Layer FBE+A.R.O(Abrassion Resistance Overlay)
& FBE+SINTER coating activities carried out by ShawCorr as coating contractor.Carried out
inspection activities accordance to the project procedures,specifications, codes and
standards.Witnessed on-line,off-line and lab testings according to the client approved Inspection
Test Plan(ITP) and Quality Plan(QP).Also witnessed coated pipes repairs activity as per approved
repair procedures.

SEPT.2016-OCT.2016:Employed to EURTRUE OVERSEAS PTE. LTD. seconded to


CUEL/CHEVRON THAILAND LIMITED as Coating Inspector for Phase 51 Facilities
Engineering/Wellhead Platform Project.

Responsibilities:
Monitoring and inspection of Surplus FBE coated pipes carried out by Bredero Shaw Quality
Team according to project procedure and specification.Witnessed all of the activities as per
approved client’s ITP.

DEC.2015-JUNE 2016:Employed to EURTRUE OVERSEAS PTE. LTD. seconded to


CUEL/CHEVRON THAILAND LIMITED as Coating Inspector for Various Sizes Package
Pipeline Project.

Responsibilities:
Monitoring,inspections and witnessed on FBE & CWC coating activities carried out by Bredero
Shaw Malaysia as coating contractor.Monitoring,inspections and witnessed the project activities
accordance to the project procedures,specifications,codes and standards.Witnessed on-line,off-line
and lab. testings according to the client approved ITP and Procedures.Witnessed coated pipes
repair activities as of approved repair procedures.
MAY 2015-NOV.2015:Employed to BUREAU VERITAS as Third Party Inspector(TPI)
on- behalf of DALMINE S.p.A for TOTAL LCP-BADAMYAR Pipeline Project which is
involved by TOTAL,SAPURACERGY and TENARIS.

Responsibilities:
Monitoring,Inspection and Witnessed all coating activities such as 2LPE Bends,3LPE & CWC
Linepipes and Anode Installation.Witnessed on-line,off-line and lab. testings activities according
to the client approved procedures and specification.Endorsed all of the PQT and Production
reports as per approved I.T.P and M.P.P.

DEC.2014-FEB.2015:Employed to EURTRUE OVERSEAS PTE. LTD. seconded to


CHEVRON/CUEL THAILAND LIMITED as Coating Inspector for CVX1406 ERPLI Partial
Replacement,CVX1401,1402,1403,CVX47&48 3901 CHEVRON SRGLA Gas Lift,PLPLG-R
Particial Replacement and PLWLE Water Injection Pipeline Project.

Responsibilities:
Monitoring,inspections and witnessed on FBE,AE,Anode Installation and CWC coating activities
carried out by Bredero Shaw Malaysia as coating contractor.Monitor,inspections and witnessed
the project activities accordance to the project procedures,specifications,codes and
standards.Witnessed on-line,off-line and lab. testings according to the client approved ITP and
procedures.Witnessed repair activities on damage coated pipes as of approved repair procedure.

MARCH 2014-OCT.2014:Employed to EURTRUE OVERSEAS PTE. LTD. seconded to


McDERMOTT AUSTRALIA PTY. LTD. as Coating Inspector for INPEX URF Pipeline Project.

Responsibilities:
Monitoring,inspections and witnessed on 5LPP and IMPP pipelines and bend and internal
Clad/Duplex lining cleaning.Coating activities carried out by Bredero Shaw Malaysia and
Bredero Shaw Indonesia as coating contractor accordance to the project procedures,
specifications,codes and standards.Witnessed online,offline and lab testings according to the
client approved procedures.Witnessed repair activities on damage coated pipes as of approved
repair procedure.Monitor load out activities such as pipes handling to avoid coating damages prior
to load onto trucks/vessel.

DEC.2013-FEB.2014:Employed to EURTRUE OVERSEAS PTE. LTD. as Coating Inspector


seconded to CHEVRON/CUEL for PHASE 45 - 46 & PHASE 1301V - 1304V Pipeline Project.

Responsibilities:
Monitoring,inspections and witnessed on FBE coating activities carried out by Bredero Shaw
Malaysia as coating contractor accordance to the project specifications, procedures,codes and
standards.Witnessed online,offline,field and lab. tests according to the client approved
procedures.Witnessed repair activites on damage coated pipes as of approved repair procedure.
MARCH 2013-NOV. 2013:Employed to Phoenix QC Co. Ltd as Coating Inspector seconded to
INPEX Australia for Umbilicals,Risers and Flowlines(URF) Pipeline Project-Corrosion
Resistance Alloy(CRA) and Duplex Stainless Steel(DSS) Pipeline.

Responsibilities:
Monitoring,inspections and witnessed on 7LPP and IMPP pipelines and bends.Coating activities
carried out by Bredero Shaw Malaysia and Bredero Shaw Indonesia as coating contractor
accordance to the project procedures,specifications,codes and standards.Witnessed online,offline
and lab. tests according to the client approved procedures.Witnessed repair activities on damage
coated pipes as of approved repair procedure.

JULY 2012-FEB. 2013:Employed to CAMPBELL ASIA PACIFIC as Coating Inspector


seconded to WOODSIDE ENERGY LIMITED(WEL) for Greater Western Flank-1Pipeline
Project-CRA and DUPLEX Pipeline.

Responsibilities:
Monitoring,inspection and witnessed on 5LPP and IMPP pipeline and bends. Coating activities
carried out by Bredero Shaw Malaysia as coating contractor accordance to the project
procedures,specifications,codes and standards.Witnessed field and lab testings according to the
client approved procedures.Witnessed repair activities on damage coated pipes as of approved
repair procedure.

JUNE 2011-JULY 2012:Employed to EURTRUE OVERSEAS PTE LTD as Lead Coating


Inspector seconded to PTSC M&C for BIEN DONG 1 & SU TU TRANG LONG TERM
PLATFORM & TEST PIPELINE(LTPTP) Project in PHU MY,SR.Vietnam for Corrosion
Resistance Alloy(CRA) and Carbon Steel Pipeline.

Resposibilities:
Monitoring,inspection and witnessed on 5LPP,IMPP,SPU and Bend Insulation coating,Anode
Installation and CWC coating carried out by PVID accordance to the project
procedures,specifications,codes and standards.Witnessed field and lab testings according to the
client approved procedures.Witnessed repair activities on damage coated pipes as of repair
procedure.Monitor load out activities such as pipes handling to avoids coating damage prior to
load onto trucks/vessel.

AUG.2010-APR. 2011:Employed to Overseas Bechtel (M) as Coating Inspector for PTT


Offshore Gas Spur Pipeline Project.

Responsibilities:
Monitoring,inspection and witnessed on 3LPE,Internal Flow Coating,Anode Castings and
Installation,CWC and 3LPE bend coating carried out by PPSC accordance to the project
specifications,procedures,codes and standard.Witnessed field and lab. testings according to the
client approved procedures.Witnessed repair activites on damage coated pipes as of approved
repair procedure.Monitor load out activities such as pipes handling to avoids coating damage prior
to load on to trucks/vessel.
JAN.2010-JUNE 2010:Employed to EUTRUE OVERSEAS PTE LTD seconded to PTSC M&C
as Coating Inspector for CHIMSAO Block 12 Dev-Gas Export & Infill Linepipes Project.

Responsibilities:
Monitoring, inspection and witnessed on 3LPP,Internal Flow,AE,CWC,bend 3LPP coating and
Anode Casting carried out by PPSC accordance to the client specifications,procedures,codes and
standards.Witnessed field and lab testings according to the client approved procedures.Witnessed
repair activities on damage coated pipes as of approved repair procedure.Monitor load out
activites such as pipes handling to avoid damage on coated pipes prior to load onto trucks/vessel.

NOV. 2009-DEC 2009:Employed to EUTRUE OVERSEAS PTE LTD seconded to CUEL as


Coating Inspector for PTTEP ARTHIT 1C Pipeline Project.

Responsibilities:
Monitoring,inspection and witnessed on 3LPP and Anode Installation and Concrete coating
activities carried out by Bredero Shaw accordance to the client specifications,procedures,codes
and standards.Witnessed field and lab testings according to the client approved
procedures.Witnessed repair activites on damage coated pipes as of approved repair procedure.

APRIL 2008-OCT. 2009:Employed to VELOSI (M) SDN BHD as Coating Inspector seconded
to Technip Oversea (M) Sdn Bhd/Petronas Carigali for Turkmenistan Block 1 Gas Development
Project.

Responsibilities:
Monitoring,inspection and witnessed on 7LPP,3LPE,FBE,Syntetic Polyurathane(SPU),AE and
Concrete coating,Doubler Plate welding, Anode Casting and Installation activities carried out by
Bredero Shaw/PPSC in accordance with the client specifications,procedures,codes and
standards.Witnessed field and lab testings according to the client approved procedures.Witnessed
repair activities on damage coated pipes as of approved procedure.Monitor preservation in storage
yard with VPCI materials used for the activities.Monitor load out activities such as pipes handling
to avoids damage coated pipes prior to load on to trucks/vessel.

FEB. 2008-APRIL 2008:Employed to OAG Group Of Company as Coating Inspector seconded


to J RAY McDERMOTT( Far East) for CCP/SU TU VANG-RANG DONG Pipeline for the
Asphalt Enamel(AE),Anode Installation & Concret Weight Coating(CWC).

Responsibilities:
Monitoring,inspection and witnessed on the above pipeline coating activities carried out by
Bredero Shaw in accordance to the client specifications,procedures,code and standard.Also
witnessed field and lab testing according to the client approved procedures and verification of
contractor production report.
JUNE 2007-DEC 2007:Employed to LLOYDS REGISTER INSPECTION LIMITED as Coating
Inspector for Internal,3LPP, Concrete weight coating & Anode Installation/Anode gap PU Infill
for MEDGAZ Pipeline Project.

Responsibilities:
Monitoring,inspection and witnessed on the above pipe coating activities carried out by Bredero
Shaw in accordance to the client specifications,procedures,code and standard.Witnessed field and
lab. testing according to the client approved testing procedures and verification of contractor
production report.Witnessed repair activities on damage coated pipes as of approved repair
procedure.

FEB. 2007-MAY 2007:Employed to INTRALINE RESOURCES as Coating Inspector for


FBE,3LPP, 4LPP, Concrete Weight coating & Anode Installation for
CHERMINGAT,BELUMUT & BUNGA ORKID for TALISMAN ENERGY.

Responsibilities:
Monitoring,inspection and witnessed on the above pipe coating activities carried out by Bredero
Shaw in accordance to the client specifications,procedures,code and standard.Also witnessed field
and lab. testing according to client approved testing procedures and verification of contractor
production report.

SEPT 2006-JAN. 2007:Employed to SGS Petrotechnical seconded to SAIPEM ASIA as Load-


out(ovality test) Inspector for TTM & TTPP Gas Pipeline.

Responsibilities:
Monitoring and inspection on the coated pipes inside/outside diameter before load-out activities
according to the client approval procedures and specifications.

MAR.2006-JULY 2006:Employed to SGS Petrotechnical seconded to SAKHALIN ENERGY


INVESTMENT CO (SEIC) as Coating Inspector for Asphalt Enamel,Concrete weight coating and
Internal Painting.Coating activities performed at Bredero Shaw.

Responsibilities:
Monitoring,inspection and witnessed on the aboved pipe coating activities carried out by cotractor
in accordance with client specifications,procedures,code and standard.Also witnessed field and
lab testing according to the client approved testing procedures and verification of contractor
production report.
DEC. 2005-FEB. 2006:Employed to ITEX Quality Services seconded to SAIPEM Portugal for
DOLPHIN ENERGY EPC 2C/EPC2F-Midstream Pipeline Ras Laffan to Taweelah & EPC 2B
Sealines Project as Coating and Painting Inspector for 3LPE,Internal painting and Concrete
weight coating in NPCC,ABU DHABI, UAE.

Responsibilities:
Monitoring,inspection and witnessed on the above pipe coating activities carried out by contractor
in accordance with client specifications,procedures,code and standard.Also witnessed field and
lab testing according to the client approved testing procedures and verification of contractor
production report.

MAR. 2005-NOV. 2005:Employed to Overseas Bechtel (M) Sdn Bhd for Third Transmission
Pipeline Project as Coating and Painting Inspector for 3LPE,Internal painting and Concrete
weight coating.Coating activities performed at PPSC Industries.

Responsibilities:
Monitoring and inspection on the above various pipe coating process carried out by PPSC in
accordance to the procedures,code standards and client specifications.Also witnessed field and lab
testing according to approved procedures and verification of production report.

DEC. 2004-FEB. 2005: Employed to Mitsui International seconded to Kashagan Field


Development Project as Coating and Painting Inspector for 3LPP coating process.Coating
activities performed at Bredero Shaw (M) Sdn. Bhd.

Responsibilities:
Monitoring and inspection on 3LPP coating process for 24’’,18’’ & 10’’ OD linepipe.Ensuring
coating process carried out by contractor in accordance with procedure,code,standard and client
specifications.Also witnessed field and lab testing ie:peel test;impact test;bend test;CD test and
DFT reading.Reviewing and verification of production inspection report.

NOV.2002 – NOV.2004: Employed to MOODY INT’L.(M) Sdn Bhd, seconded to SUMITOMO


CORP. as Coating and Painting Inspector for 3LPE, Zinc Rich Epoxy & Poly Urethene. Coating
activities performed at PPSC Industries for AGT & SCP PIPELINE PROJECT – BP(U.K)-
Azerbaijan-Georgia-Turkey & South Caucasus Pipeline

Responsibilities :
Monitoring and inspection on 3LPE coating and internal flow coating process for 46”& 42”OD
line pipe. Ensuring coating process carried out by contractor in accordance with procedures,codes,
standards and client’s specifications. Also witness field and lab testing i.e: peel test, impact test,
bend test, CD test and WFT&DFT reading. Reviewing and verification of production inspection
report.
JAN. 2002-OCT.2002: Employed to VELOSI (M) Sdn Bhd seconded to BP EXPLORATION as
Coating Inspector for 3LPE coating at PPSC Industries for IN-SALAH Gas Pipeline Project.

Responsibilities :
Monitoring and inspection on 3LPE coating and internal flow coating process for 48”OD line
pipe. Ensuring coating process carried out by contractor in accordance to procedures,codes,
standards and client specifications.Also witness field and lab testing i.e: peel test, impact test,
bend test, CD test and WFT&DFT reading. Reviewed and verified production inspection reports.

AUG. 2001-DEC. 2001: Employed by SGS (M) Sdn Bhd Seconded to JAPANESE
CONSORTIUM (JC) as Logistic/ Material Inspector for 3LPP coating at PPSC INDUSTRIES for
BLUE STREAM Gas Pipeline Project.

Responsibilities:
Daily monitoring of coated pipes and load-out activities at PPSC Industries. Responsible for QA
matters such as pipe’s traceability/ identification, damage and repair work on any damage coating.
Highlight product non-conformance and liaise with the contractor pertaining to materials
receiving and load-out activities.

APRIL 2001-JULY 2001: Employed to Nippon Keiji Kentei (M) Sdn Bhd Seconded to Mitsui
Japan as Logistic / Metarial Inspector for 4LPP coating at Bredero Shaw (M) Sdn Bhd for ECHO
YODEL Gas Pipeline Project.

Responsibilities:
Daily monitoring of coated pipes and load-out activities at Bredero Shaw (M) Sdn Bhd.
Responsible for QA matter such as pipe identification, damage and repair work on damage
coating.
Highlight product non-conformance and liaise with the contractor pertaining to material receiving
and load out activities.

FEB.2001-APRIL 2001: Employed by Bureau Veritas (M) Sdn Bhd and seconded to SCSM
Consortium (SAIPEM) .Appointed as Coating Inspector for Fahud-Sohar Gas Pipeline (Oman)
Project and stationed at PPSC Industries Sdn Bhd Kuantan.

Responsibilities:
Monitoring and inspection on 3LPP coating and internal Flow Coating process carried out by
contractor in accordance with client code, standards and specifications. Also witness site and Lab
test i.e. peel test, hardness test, impact test, bending test, indentation test, cathodic dis-bondment
and also DFT and WFT measurement. Also reviewed and verified inspection and production
reports.
DEC.2000-FEB.2000: Employed by Germanischer Llyod Malaysia (GLM) and seconded to
VIETSOV-PETRO. Appointed as Coating Inspector for RANG DONG- BACH HO Gas Pipeline
and stationed at Bredero Shaw (M) Sdn Bhd.

Responsibilities
Monitoring and inspection of 3LPP coating, concrete coating and anode installation.Ensuring
coating process carried out by contractor in accordance to the client codes, standards and
specifications.Witnessing lab and site testing such as peel test, impact test, indentation test,
concrete strength and water immersion tests. Also reviewed and verified contractor production
test and reported to GLM.

SEPT.2000-DEC.2000: Employed by Dialog E&C appointed as Technical QC for Propane and


Butane Looping Pipeline(Petronas Gas Berhad) and stationed at Kemaman
Terengganu.

Responsibilities
To ensure the approved procedures and specification are fully complied based on standard
required specification. Apart from that, was also assigned to check and ensure welding works
complied with client’s specification and standard. Other responsibilities also monitoring welding
procedures complied with safety requirements prior to commencement of any welding activities.
Other inspection also covers fit-up, parameter check, visual inspection on completed weld,
monitoring on blast, wrap and holiday test. Detail of works performed and other inspection
reports were up-date on daily basis.

JUNE 2000-SEPT.2000: Employed by Projass Enecorp Sdn.Bhd. appointed as Technical QC for


Ethane Pipeline(Petronas Gas Berhad) and stationed at Kertih
Terengganu.

Responsibilities
Responsible to identify and inspection as followed approved procedures and specification. Works
involved such as monitoring welding as approved procedures before start of activity, fit-up
inspection, parameter check, visual inspection on completed weld, monitoring on blast, wrap and
holiday test. Also up-dating and compiling of all inspection report.

MAY 1999-MAY 2000: Employed to MMC-IPCO-MURPHY JV appointed as Technical QC for


Peninsular Gas Utilization Loop 2(Petronas Gas Berhad) Pipeline 265 km
Project and based at Seremban,Negeri Sembilan.

Responsibilities
Responsible to inspect and to identify works assigned was based as per approved procedures and
specification. Responsible to inspect welding activities performed complied with the client’s
procedures requirement and standard. Also involves in monitoring of welding preparation such as,
fit-up inspection, parameter check, visual inspection, monitoring on blast-wrap and holiday test.
Up-dating and compiling of all inspection report.
AUG.1997-MAY 1999: Employed by Velosi (M) Sdn Bhd appointed as Pipeline Inspector for
OGP TECHNICAL SERVICES for Peninsular Gas Utilization Loop 1
Pipeline 285 km project and based at Kuantan,Pahang.

Responsibilities
Responsible for inspection, monitoring, witnessing and supervision of pipeline construction works
and progress which is to ensure the construction activity performed by contractor according to
approved specification and procedures. Works involved such as pipes handling, storage and load
out. Also supervised ROW clearing and grading, trenching, joint coating and repair, lower in and
backfilling.

JAN.1992-AUG.1997: Employed by Bredero Shaw (M) Sdn Bhd and was appointed as QC
Inspector.

Responsibilities
Responsible in inspection activity for oil and gas pipeline anti- corrosion including internal and
external blast clean, internal and external epoxy paint, FBE coating,3LPE&3LPP coating, asphalt
and concrete coating. Also ensure that instruments used are calibrated in accordance with
procedures and specification. To do quality check on surface preparation as accordance to
governing bodies such as NACE,British Standards,Swedish Standard ext.Other activities
including administering of production test for materials used was with accordance to any technical
standard set by owner of oil and gas pipeline company.

AUG.1991-JAN.1992: Employed to Hing Loong Eng. Sdn Bhd appointed as Material Controller.

Responsibilities
Tallied and recorded all received materials. Ensuring all received materials were in good
condition and complied with the standard requirements. Also performed threading inspection for
steel casing and steel tubing. Apart from that, also performed quality control inspection of all
equipments to be used in blasting and painting operation.

SEPT.1989-AUG.1991: Appointed to Bredero Shaw (M) Sdn Bhd as QC Inspector.

Responsibilities
Involved in inspection activities for the oil and gas pipeline anti corrosion coating including blast
cleaning, epoxy painting, FBE&3LPE/PP, internal coating, asphalt/coal tar enamel coating,anode
installation and concrete weight coating.Ensure that instruments used for inspections activities
was calibrated in accordance with Inspection&Test Plan(ITP) and Quality Plan(QP). Also
involved in lab testing such as indentation, impact test, bend test, pinhole test, elongation test,
peel/adhesion test, cathodic dis-bondment and cure test for FBE & 3LPE/PP coating, softening
point, penetration test, primer volatile test, primer viscosity, concrete strength test, concrete
density test water absorption and push off test particularly for Enamel & Concrete coating.

end of cv

sabri cv 2018

Das könnte Ihnen auch gefallen