Project: Made By: CGB

Location: Checked By:


Client: Date: 12/12/2014
Job Title BACK PROPPING ANALYSIS Job.No/ Rev.

BACK PROPPING ANALYSIS: REF.

LOADINGS: ASCE 37-02

CL = 3.60 kN/m² Construction Live Load Table -2


DL = 8.75 kN/m² Weight of Concrete at the pouring level Pre- Calculated
FL = 16.00 kN/m² Formwork Load Pre- Calculated
INL = 0.80 kN/m² Incidental Live Load Assumption

LOADING DISTRIBUTION PER STORY LEVEL: ACI 347-2R-05

B_L = 3.00 unitless Number of Back Propping Level required

AT Nth LEVEL
H= 3.50 m Clear height between slab-slab See Outline Dwg.
CL = 3.60 kN/m² Construction Live Load Construction Live Load = 3.60 kN/m² Table -2
DL = 8.75 kN/m² Weight of Concrete Weight of Concrete = 8.75 kN/m² Pre- Calculated
FL = 16.00 kN/m² Formwork Load Nth LEVEL Pre- Calculated

TCL = 28.35 kN/m² Total Construction Load (Unfactored)


TNL = 28.35 kN/m² Unfactored Net Load on lvl (N-1)
28.35kN/m²
AT (N-1) LEVEL
H= 3.50 m Clear height between slab-slab See Outline Dwg.
INL = 0.80 kN/m² Incidental Load (N-1) LEVEL Assumption
5.00 kN/m²
TCL = 29.15 kN/m² Total Construction Load (Unfactored)
DsL = 5.00 kN/m² Total Design Load of the Slab lvl. (N-1) See Design Loads
TNL = 24.15 kN/m² Unfactored Net Load on lvl (N-2) 24.15 kN/m²

AT (N-2) LEVEL
H= 3.50 m Clear height between slab-slab (N-2) LEVEL See Outline Dwg.
INL = 0.80 kN/m² Incidental Load 5.00 kN/m² Assumption

TCL = 24.95 kN/m² Total Construction Load (Unfactored)


DsL = 5.00 kN/m² Total Design Load of the Slab lvl. (N-2) 19.95 kN/m² See Design Loads
TNL = 19.95 kN/m² Unfactored Net Load on lvl (N-3)

AT (N-3) LEVEL (N-3) LEVEL


H= 3.50 m Clear height between slab-slab 5.00 kN/m² See Outline Dwg.
INL = 0.80 kN/m² Incidental Load Assumption

TCL = 20.75 kN/m² Total Construction Load (Unfactored) 15.75 kN/m²


DsL = 5.00 kN/m² Total Design Load of the Slab lvl. (N-3) See Design Loads
TNL = 15.75 kN/m² Unfactored Net Load on lvl (N-4)
(N-4) LEVEL
AT (N-4) LEVEL 12.00 kN/m²
TCL = 15.75 kN/m² Total Construction Load (Unfactored)
DsL = 12.00 kN/m² Total Design Load of the Slab lvl. (N-4) See Design Loads
TNL = 3.75 kN/m² Unfactored Net Load on lvl (N-5)

REMARKS:

PROVIDE MORE BACK PROPPING AT LEVEL BELOW (N-4)!

LEGENDS:
- FALSE WORK
- BACK PROPPING
- CURED CONCRETE SLAB
- SLAB TO BE CAST

J:\cris personal files\cris civil engineer\Cris Design Calculation template\Base Format\calculation (excel)\Latest\Back Propping Template By: CGB