Design Criteria
Process
Civil
Structural
Architectural
HVAC
Mechanical - HVAC
Piping and Plumbing
Fire Protection
Electrical
Electrical Apparatus
Electrical Systems
Instrumentation and Control
Operation and Maintenance
Environmental
Configuration
Plant Arrangement
Site Plan
Model
a. 3-D Computer
b. Plastic
Plant Coordination and Grid
Process Design
Capacity
Raw Materials Requirement
Utilities Requirement
Environmental Permit Data
Environmental Permit
Mass / Energy Balance
Flow Sheets
P&I Drawings
Layouts
Manpower Requirements
Specifications
1 D1_Engineering Checklist.doc
APPLICABLE DATE
YES NO COMPLETED
Purchase Specifications
Equipment
Pipe, Valves and Fittings
(piping includes gaskets, nuts, bolts, washers, studs)
Civil / Structural
Architectural
Electrical
Instrumentation and Control
Procurement
Inquiry Document Preparation
Proposal Submittal
Bid Tabulations
Requisition Preparation
Purchase Document Preparation
Purchasing
Expedite Vendor Information
Expedite Equipment / Materials
Shop Visits
Lists
Equipment with Expediting Data
Pipeline
Instrument
Motor
Tie-in
Mechanical Design
Equipment, Layouts, Sections, and Details
HVAC
Equipment Fabrication Drawings
Fire Protection
Installation specifications
Tanks
Pressure Vessels
Chutes
Ductwork
2 D1_Engineering Checklist.doc
APPLICABLE DATE
YES NO COMPLETED
Piping Design
Plans, Sections, and Details
Support Details
Tie-in Details
Plumbing
Isometrics
Stress Analysis
Spool Sheets
Hangers & Supports
Electrical Design
One Line Diagram (specs)
Grounding Plan and Detail
Power Plan and Detail
Lighting Plan and Details
Elementary and Connection Diagram
Cable Schedule
Conduit Schedule (motor list)
Ladder / Logic Diagram
PLC Programming and Documentation
Instrument Design
Specification (instr. list)
Loop Sheets and Connection Diagram
Location Plans and Details
Panel Layout and Details
Cable Schedule
Conduit Schedule
Software and Documentation
Configuration
Data Sheets
3 D1_Engineering Checklist.doc
APPLICABLE DATE
YES NO COMPLETED
Architectural
Cladding/Siding
Roofing system - including Insulation
Doors and Windows Schedule
Office and Control Room Layouts
Finish Schedules
Spare Parts
Prepare List
Procurement
Start-up
Manuals
Operating
Maintenance
Installation
Schedule
Preparation
Monitor and Update
Job schedule
3-week schedule
Shutdown schedule
Construction Management
Project Manager
Field Engineering
Safety
Craft Inspection/QC
4 D1_Engineering Checklist.doc
APPLICABLE DATE
YES NO COMPLETED
Start-up Assistance
Mechanical
Electrical
Instrument
Progress Reports
Engineering
Construction
Project Cost
General
Project Engineering / Coordination
Meetings
Construction Bid Document
Vendor Drawing/submittal Expediting
Engineering Procedure Manual
Construction Procedure Manual
5 D1_Engineering Checklist.doc