TYPE KPMATSU PC-200

ESCAVATOR
1.1 Bucket capacity V 1 m3
1.2 Bucket factor FB 0.9
1.3 Efficiency factor FE 0.67
1.4 Cycle time TC 0.375 min
1.5 Productivity per hour Q 96.48 m3/h
1.6 Coeficient of equipment E10 0.01036484 per/h

Wheel loader
2.1 Bucket Factor FB 1.1 m3
2.2 Capacity V 3
2.3 Eficiency Factor FE 0.83
2.4 Cycle time TC 0.52
a Loading T1 0.05
waktu buang 0.2
waktu kembali 0.2
b Unloading T2 0.07
2.5 Poductivity per hour Q 316.038462
2.6 Coeficient of equipment E15 0.00316417
m km
JARAK 500 0.5
Dump truck (6 m3)
3.1 Capacity V 6
3.2 Efficiency factor FE 0.83
3.3 Avrage loading trip velocity V1 10
3.4 Average unloading trip velocity V2 20
3.5 Cycle time TC 8.23
a Loading time T1 1.5
b unloading time T2 3
c other (loadind waith) T3 3.73
3.6 productivity per hour Q 36.300272
3.7 coeficient of equipment E09 0.027548

Dump truck (20 m3)


3.1 Capacity V
3.2 Efficiency factor FE
3.3 Avrage loading trip velocity V1
3.4 Average unloading trip velocity V2
3.5 Cycle time TC
a Loading time T1
b unloading time T2
c other (loadind waith) T3
3.6 productivity per hour Q
3.7 coeficient of equipment E09
Kekuatan
Motor Grader 12dk
Thick of spreading t 0.3 m
4.1 Spreading length LS 200 m
4.2 efective width b 3.7 m
4.3 efficiency factor FE 0.6
4.4 Average velocity V1 4 km/h
4.5 No of passing n 4
4.6 Cycle time TC 4.20 min
a Time for one passing T1 3 min
b Other (back to start ponit) T2 1.20 min
5.7 Productivity per hour Q 475.714286 m3/h
4.8 Coefficient of equipment E13 0.0021021 coef/hour

Capacity m3 4 m3
Water tank trcuk
5.1 Volume cum 4 m3
5.2 Water required per cum of dense material WC 0.07 m3
5.3 No of passing n 1
5.4 Efficiency factor FE 0.8
5.5 productivity per hour Q 45.71 m3/h
5.6 Coeficient of equipment E23 0.021875 coef/h

Type cat CB54B


Vibratory roller
Thicknes of compaction t 0.2 m
6.1 Average velocity V 1.5 km/h
6.2 Effective width b 1.5 m
6.3 No of passing n 5 nos
6.4 Efficiency factor FE 0.83
6.5 Productivity per hour Q 74.7 m3/h
6.6 Coefficeint of equipment E19 0.01338688 coef/h
Rubber tire roller
type CAT CW34
Thicknes t
7.1 Average velocity V km/h
7.2 Effective width b m
7.3 No of passing n
7.4 Efficiency factor FE
7.5 Productivity per hour Q #DIV/0! m3/h
7.6 Coeficient of equipment E05 #DIV/0! coef/h

Air Compressor
8.1 Air pressure capacity V 324 m2/h
8.2 Efficiency factor FE 0.8
8.3 Q Q 259.2 m2/h
8.4 Coeficient E05 0.00385802 coef/h

Aspalt sprayer
Model CAD 8550
Recarge distance m 2000 m

9.1 Capacity V 850 liter


9.2 Spraying speed SP 6500 l/h
9.3 Recarge speed RP 4000 l/h
9.4 Factor efficiency FE 0.83
9.5 Equipment factor FA 0.65
9.6 Cycle time TC 18.75 min
a Time in loading condition T1 4 min
b Time in Recarge condition T2 2 min
c Recarge time T3 12.75 min
9.7 Productivity per hour Q 1.46744 m3/h
9.8 Coeficient of equipment E05 0.68145887 coef/h
Asphalt finisher
Model Nagato SA 41/40hp
10.1 Spreading speed V 250 m/h
10.2 Thicknes t m
10.3 Width b 7m
10.4 Efficeincy factor FA
10.5 Spraying distance L m
10.6 Cycle time TC 0 min
10.7 Productivity per hour Q #DIV/0! m3/h
10.8 Coeficient of equipment E05 #DIV/0! coef/h

Asphalt mixing plant


11.1 Capacity V 120.3 m3/h
11.2 Efficiency factor FA 0.8
11.3 Productivity per hour Q 96.24 m3/h
11.4 Coeficient E05 0.01039069 coef/h
Dump truck (15 m3)
3.1 Capacity V 3.1
3.2 Efficiency factor FE 3.2
3.3 Avrage loading trip velocity V1 3.3
3.4 Average unloading trip velocity V2 3.4
3.5 Cycle time TC 3.5
a Loading time T1 a
b unloading time T2 b
c other (loadind waith) T3 c
3.6 productivity per hour Q 3.6
3.7 coeficient of equipment E09 3.7

Dump truck (23)


3.1 Capacity V 3.1
3.2 Efficiency factor FE 3.2
3.3 Avrage loading trip velocity V1 3.3
3.4 Average unloading trip velocity V2 3.4
3.5 Cycle time TC 3.5
a Loading time T1 a
b unloading time T2 b
c other (loadind waith) T3 c
3.6 productivity per hour Q 3.6
3.7 coeficient of equipment E09 3.7
Dump truck (18 m3)
Capacity V
Efficiency factor FE
Avrage loading trip velocity V1
Average unloading trip velocity V2
Cycle time TC
Loading time T1
unloading time T2
other (loadind waith) T3
productivity per hour Q
coeficient of equipment E09

Dump truck (33 m3)


Capacity V
Efficiency factor FE
Avrage loading trip velocity V1
Average unloading trip velocity V2
Cycle time TC
Loading time T1
unloading time T2
other (loadind waith) T3
productivity per hour Q
coeficient of equipment E09
DAFTAR HARGA MATERIAL DISTRIK DILI
AGENCIA DESENVOLVIMENTO NACIONAL

NO URAIAN SATUAN

1 Tanah urug M3 $ 5.00


2 Sirtu M 3
$ 10.00
3 Pasir urug M3 $ 10.00
4 Pasir pasang M 3
$ 21.00
5 Pasir beton M 3
$ 21.00
6 Pasir Plesteran M3 $ 25.00
7 Batu kali M 3
$ 25.00
8 Batu belah 15/20 M 3
$ 28.00
9 Batu belah 20/40 M 3
$ 25.00
10 Batu pecah 2/3 M 3
$ 45.00
11 Batu pecah 3/5 M 3
$ 45.00
12 Batu pecah 5/7 M 3
$ 45.00
13 Kerikil/batu pecah M 3
$ 45.00
14 Batu belah M 3
$ 20.00
15 Semen Portland kg $ 0.16
16 Semen Gresik kg $ 0.16
17 Semen Kupang kg $ 0.16
18 Semen Bosowa kg $ 0.15
19 Semen Yi Sen kg $ 0.14
20 Semen Warna kg $ 0.70
21 Nat kg $ 1.60
Polos (12meter)
1 Besi beton 6mm Btg $ 2.93
2 Besi beton 8mm Btg $ 5.30
3 Besi beton 10mm Btg $ 7.50
4 Besi beton 12mm Btg $ 11.00
5 Besi beton 13mm Btg $ 12.75
6 Besi beton 16mm Btg $ 18.50
7 Besi beton 19mm Btg $ 20.00
8 Besi beton 22mm Btg $ 41.40
9 Besi beton 25mm Btg $ 55.40
10 Besi beton 28mm Btg
11 Besi beton 29mm Btg
12 Besi beton 32mm Btg
13 Besi beton 36mm Btg
14 Besi beton kg $ 1.05
15 besi angker Q 8 " kg $ 1.10
Ulir (12 meter)
1 Besi beton 6mm Btg
2 Besi beton 8mm Btg $ 5.70
3 Besi beton 10mm Btg $ 7.80
4 Besi beton 12mm Btg $ 12.50
5 Besi beton 13mm Btg $ 13.40
6 Besi beton 16mm Btg $ 21.80
7 Besi beton 19mm Btg $ 29.10
8 Besi beton 22mm Btg $ 41.50
9 Besi beton 25mm Btg $ 57.00
10 Besi beton 28mm Btg
11 Besi beton 29mm Btg $ 58.50
12 Besi beton 32mm Btg $ 77.60
13 Besi beton 36mm Btg
14 Harga per kg besi beton ulir Kg
15 Bronjong 1x1x2m Buah $ 35.00
16 Kawat Beton Kg $ 2.10
17 Kawat Ikat Bronjong Kg $ 2.00
18 Bronjong biasa Lbr $ 28.00
19 Kawat Ikat Bronjong Macceferry (25 kg) Kg $ 2.00
20 Geotextile M2 $ 2.00
21 Kawat Duri BTO - 65 / 50 cm Roll $ 28.20
22 Kawat Duri BTO - 65 / 90 cm Roll $ 35.00
23 Wiremesh (BRC) M2 $ 1.80
24 Kawat Berduri Roll $ 23.00
Profil H-Beam 12 meter
1 100x100x6x8 Btg
2 125x125x5x7 Btg
3 125x125x6.5x9 Btg
4 150x150x7x10 Btg $ 231.00
5 150x75x7x12 Btg $ 190.50
6 250x125x6x9x12 Btg
7 200x100x5x7x12 Btg $ 240.50
8 250x125x6x9x12 Btg $ 385.00
9 200x200x8x12 Btg
10 250x250x9x14 Btg $ 529.50
11 300x300x10x15 Btg
12 400x200 Btg $ 750.00
13 250x350x12x19 Btg
14 400x400x13x21 Btg
Profil WF (Wide Flange) 12 meter
1 WF 100x50x5x7 Btg $ 95.50
2 WF 125x60x6x8 Btg
3 WF 148x100x6x9 Btg
4 WF 150x75x5x7 Btg $ 115.50
5 WF 175x90x5x8 Btg
6 WF 197x99x4.5x7 Btg
7 WF 200x100x5.5x8 Btg $ 171.00
8 WF 200x100x5.5x8 Btg
9 WF 248x124x5x8 Btg
10 WF 250x125x6x9 Btg $ 235.50
11 WF 298x149x6x8 Btg
12 WF 300x150x6.5x9 Btg $ 450.50
13 WF 346x174x6x9 Btg
14 WF 350x175x7x11 Btg
15 WF 396X199X7x11 Btg
16 WF 400x200x8x13 Btg
17 WF 446x199x8x12 Btg
18 WF 450x200x9x14 Btg
19 WF 500x200x10x16 Btg
20 WF 588x300x10x16 Btg
21 WF 600x200x11x17 Btg
22 WF 700x300x12x24 Btg
23 WF 800x300x14x26 Btg
Profil C 6 meter
1 50x40x0.5 m' $ 5.00
2 75x40x0.8 m' $ 4.40
3 75x45x15x1.6 Btg
4 75x45x15x2.3 Btg
5 100x50x20x1.6 Btg
6 100x50x20x2.3 Btg $ 25.50
7 100x50x20x3.2 Btg
8 125x50x20x2.3 Btg
9 125x50x20x3.2 Btg
10 150x50x20x2.3 Btg $ 35.50
11 150x50x20x3.2 Btg
12 150x60x20x2.3 Btg
13 150x65x20x3.2 Btg
14 200x75x20x3.2 Btg
15 Canal C 75.35.15.1.5 Btg $ 21.00
16 Steel Light Canal C 75x35x1mm m' $ 3.50
17 Steel Light Canal C 45x35x1mm m' $ 1.50
18 Light Steel Profile m' $ 4.50
19 Screw Ls $ 0.50
20 Dynabolt Ls $ 1.20

Besi Siku 5.8 Meter


1 20x20x3 Btg $ 6.30
2 25x25x3 Btg $ 7.20
3 25x25x5 Btg $ 7.30
4 30x30x3 Btg $ 11.00
5 40x40x3 Btg $ 19.00
6 40x40x4 Btg $ 22.50
7 50x50x5 Btg $ 30.50
8 50x50x6 Btg $ 25.50
9 60x60x5 Btg $ 37.50
10 60x60x6 Btg $ 37.50
11 65x65x6 Btg $ 45.05
12 70x70x8 Btg $ 45.00
13 75x75x6 Btg $ 47.00
14 80x80x6 Btg $ 61.50
15 80x80x6 Btg
16 90x90x6 Btg
17 90x90x7 Btg
18 100x100x10 Btg $ 95.00
19 100x100x7 Btg $ 87.60
20 120x120x10 Btg
21 120x120x8 Btg
22 120x120x11 Btg
23 130x130x12 Btg
24 130x130x9 Btg
25 150x150x12 Btg
26 150x150x15 Btg
27 150x150x16 Btg
28 175x175x12 Btg
28 175x175x19 Btg
29 200x200x15 Btg
30 200x200x20 Btg
31 250x250x25 Btg
32 250x250x35 Btg
Besi Kotak (Hollow) 5.8 Meter
1 12x12x0.9 Btg
2 15x15x0.9 Btg
3 20x20x0.9 Btg $ 9.80
4 25x25x1 Btg $ 13.30
5 30x30x1 Btg $ 16.50
6 40x40x1.2 Btg $ 15.50
7 40x40x1.5 m'
8 50x80x2.3 Btg $ 55.50
9 12x27x0.9 Btg
10 15x30x0.9 Btg
11 20x40x1 Btg $ 20.50
12 20x40x1.5 m'
13 25x50x1.4 Btg
14 20x60x1.4 Btg
15 50x50x1.6 Btg $ 23.85
16 50x50x2.3 Btg
17 60x30x2.3 Btg $ 36.50
18 60x60x3.2 Btg $ 37.00
19 75x45x3.1 Btg
20 75x75x2 Btg $ 54.50
21 75x75x3.2 Btg $ 50.50
22 50x100x3.2 Btg $ 60.50
23 Steel truss Box 60x10x1.5mmx6000mm Kg $ 1.10
24 Steel Purlin 50x20x10x1.5x6000mm Kg $ 1.10
25 Self Drilling Screws 12-14x20mm Kg $ 1.50
26 RHS 100.50.5 Btg $ 60.00
27 Besi Hollow Zincromate 4/3 Btg $ 9.50
28 Besi Hollow Zincromate 4/4 Btg $ 12.50
29 Kawat Las Kg $ 3.00

Besi Bulat 6 Meter (Glavanized Pipe) & Fittings


1 Ø ½" Btg $ 15.35
2 Pipa Galvanize Ø ¾" Btg $ 19.00
3 Pipa Galvanize Ø 1" Btg $ 26.90
4 Pipa Galvanize Ø 1¼" Btg $ 35.65
5 Pipa Galvanize Ø 1½" Btg $ 43.50
6 Pipa Galvanize Ø 2" Btg $ 57.50
7 Pipa Galvanize Ø 3" Btg $ 74.00
8 Pipa Galvanize Ø 4" Btg $ 93.00
9 Pipa Galvanize Ø 6" Btg $ 130.00
9 DN 100mm Btg
10 DN 150mm Btg
11 DN 200mm Btg
12 DN 250mm Btg
13 DN 300mm Btg
14 Socket Ø ½" Bh $ 0.55
15 Socket Ø ¾" Bh $ 0.70
16 Socket 1" Bh $ 1.00
17 Socket Ø 1¼" Bh $ 1.65
18 Socket Ø 2" Bh $ 2.55
19 Socket Ø 3" Bh $ 6.50
20 Socket Ø 4" Bh $ 8.90
21 Knee/Elbow Ø ½" Bh $ 0.70
22 Knee/Elbow Ø ¾" Bh $ 1.00
23 Knee/Elbow 1" Bh $ 1.15
24 Knee/Elbow Ø 1¼" Bh $ 1.75
25 Knee/Elbow Ø 2" Bh $ 3.10
26 Knee/Elbow Ø 3" Bh $ 10.00
27 Knee/Elbow Ø 4" Bh $ 19.00
28 Tee Ø ½" Bh $ 0.95
29 Tee Ø ¾" Bh $ 1.10
30 Tee 1" Bh $ 1.50
31 Tee Ø 1¼" Bh $ 2.00
32 Tee Ø 2" Bh $ 3.85
33 Tee Ø 3" Bh $ 11.00
34 Tee Ø 4" Bh $ 16.46
35 Sock Drat Dalam (SDD) Ø ½" Bh $ 0.50
36 Sock Drat Dalam (SDD) Ø ¾" Bh $ 0.50
37 Sock Drat Dalam (SDD) 1" Bh $ 0.65
38 Sock Drat Luar (SDL) Ø ½" Bh $ 0.25
39 Sock Drat Luar (SDL) Ø ¾" Bh $ 0.30
40 Sock Drat Luar (SDL) 1" Bh $ 0.50
41 Sock Drat Luar (SDL) Ø 1¼" Bh $ 0.55
42 Sock Drat Luar (SDL) Ø 2" Bh $ 0.75
43 Knee Drat Dalam (SDD)/Faucet Elbow Ø ½" Bh
44 Knee Drat Dalam (SDD)/Faucet Elbow Ø ¾" Bh
45 Tee Drat Dalam (SDD)/Faucet Tee Ø ½" Bh
46 Tee Drat Dalam (SDD)/Faucet Tee Ø ¾" Bh
47 Vlok Sock (Reducing Socket ) Ø ¾" to Ø ½" Bh $ 0.95
48 Vlok Sock (Reducing Socket Ø 1" to Ø ¾" Bh $ 1.25
49 Vlok Sock (Reducing Socket Ø 2" to Ø 1" Bh $ 2.55
50 sealtape bh $ 0.35
Besi Plat
1 1.5mm Lbr $ 45.00
2 2mm Lbr $ 64.25
3 3mm Lbr $ 95.00
4 4mm Lbr $ 120.00
5 5mm Lbr $ 153.40
6 6mm Lbr $ 168.00
7 6.5mm Lbr
8 10mm Lbr $ 275.00
9 12mm Lbr $ 330.00
10 Besi strip tebal 5mm. kg $ 1.45
PAKU
1 Paku Tripleks Kg $ 2.10
2 Paku 2cm Kg $ 2.50
3 Paku 4cm Kg $ 2.00
4 Paku 5cm Kg $ 2.00
5 Paku 7cm Kg $ 2.00
6 Paku 10cm Kg $ 2.00
7 Paku 12cm Kg $ 2.00
8 Paku 15cm Kg $ 2.00
9 Paku 20cm Kg $ 2.50
10 Paku Seng Kg $ 2.50
11 Paku Seng ulir Kg $ 3.00
12 Paku 5 - 10 cm Kg $ 2.50
13 Paku pancing 60 x 230 Kg $ 2.50
14 Paku 5-7 cm Kg $ 1.85
BAUT, BESI STRIP & SKRUP
1 Paku Skrup Bh $ 0.25
2 Besi anker Bh
3 Skrup untuk atap Bh $ 0.10
4 Baut Ø 10mm Bh $ 0.50
5 Besi Strip 3cm x 5mm (6 meter) m' $ 1.20
6 Paku skrup 10 cm bh $ 0.30
7 Paku skrup 5 cm Kg $ 3.50
8 Besi profil Kg $ 2.30
9 Paku skrup 2 - 4 cm Bh $ 0.05
10 Besi Tralis m' $ 2.75

KAYU
1 Ijuk M3 $ 5.00
2 Dolken Btg $ 1.50
3 Kayu balok kelas I (4/6) M3 $ 500.00
4 Kayu balok kelas I (5/7) M 3
$ 500.00
5 Kayu balok kelas I (5/10) M 3
$ 500.00
6 Kayu balok kelas I (6/12) M 3
$ 410.00
7 Kayu balok kelas I (8/12) M 3
$ 410.00
8 Kayu balok kelas II (4/6) M 3
$ 380.00
9 Kayu balok kelas II (5/7) M 3
$ 340.00
10 Kayu balok kelas II (5/10) M 3
$ 393.00
11 Kayu balok kelas II (6/12) M 3
$ 430.00
12 Kayu balok kelas II (8/12) M3 $ 430.00
13 Kayu balok kelas III (4/6) M 3
$ 300.00
14 Kayu balok kelas III (5/7) M 3
$ 300.00
15 Kayu balok kelas III (5/10) M3 $ 300.00
16 Kayu balok kelas III (6/12) M 3
$ 300.00
17 Kayu balok kelas III (8/12) M 3
$ 300.00
18 Kayu papan kelas I (jati open) M2 $ 875.00
19 Kayu balok kelas I M 3
$ 410.00
20 Kayu balok kelas II M 3
$ 380.00
21 Kayu balok kelas III M 3
$ 300.00
22 Kayu papan kelas I M3 $ 697.00
23 Kayu papan kelas II M 3
$ 400.00
24 Kayu papan kelas III M3 $ 300.00
25 Kayu Profil 3/4 M $ 1.75
26 Lantai kayu (Gym Floor) M2 $ 50.00
27 Papan nama proyek Bh $ 65.00
28 Kaso 5/7 Btg $ 4.50
29 Kaso-kaso (5x7)cm M3 $ 393.00
30 Reng (2x3)cm M 3
$ 393.00
31 Perancah kayu M 3
$ 300.00
TRIPLEKS & GYPSUM BOARD
1 Tripleks 4mm Lbr $ 7.36
2 Tripleks 6mm Lbr $ 7.47
3 Tripleks 9mm Lbr $ 12.77
4 Tripleks 12mm Lbr $ 16.79
5 Tripleks 15mm Lbr $ 21.94
6 Tripleks 16mm Lbr $ 22.00
7 Tripleks 18mm Lbr $ 23.43
8 Tripleks 20mm Lbr $ 32.00
9 Gypsum Board 6mm Lbr $ 10.73
10 Gypsum Board 9mm Lbr $ 12.00
11 Gypsum Board 12mm Lbr $ 24.00
12 List Gypsum profil C - 7 m' $ 2.50
13 Tepung Gypsum Kg $ 0.60
14 List Kayu profil C-7 m' $ 1.75
15 Asbes Semen M2 $ 4.00
16 Lem Kayu/Vinyl Kg $ 4.00
17 Egg Foun Sheet $ 11.50
18 Calsiboard 9 mm Lbr $ 32.00
19 Plywood 9 mm Lbr $ 12.50
20 Plywood 4 mm Lbr $ 8.00

KERAMIK
1 Keramik 20 x 20 Dos $ 7.00
2 Keramik 30 x 30 Dos $ 7.50
3 Keramik 40 x 40 Dos $ 8.50
4 Keramik 60 x 60 Dos $ 25.00
5 Keramik 10 x 25 Dos $ 6.55
6 Keramik 20 x 25 Dos $ 6.50
7 Keramik 20 x 40 Dos $ 8.50
8 Keramik 30 x 60 Dos $ 29.00
9 Keramik 10 x 10 Dos $ 7.00
10 Keramik 10 x 20 Dos $ 7.00
11 Keramik 10 x 29 Dos $ 7.00
12 Plint 15 x 20 Buah $ 0.38
13 Granit/Marmer 20x20 Dos $ 11.00
14 Granit/Marmer 30x30 Bh $ 2.50
15 Granit/Marmer 40x40 Bh $ 4.50
16 Granit/Marmer 60x40 Dos $ 28.00
17 Granit Essenza 30x60 Dos $ 55.00
18 Granit Essenza 60x60 Dos $ 55.00
19 Karpet M² $ 30.00
20 Ubin abu-abu 20 x 20 cm Bh $ 0.35
21 Plint ubin Bh $ 0.30
22 Lantai kayu (gym floor) M² $ 50.00
23 Lem Lantai Kayu Kg $ 12.50
24 Karpet M² $ 24.00
25 Under layer Lantai kayu M² $ 5.00
26 Batu koral sikat Kg $ 0.90
27 Batu alam M² $ 30.00
29 Keramik Batu Paras Bh $ 30.00

CAT
1 Cat kayu kaleng $ 5.50
2 Cat besi kaleng $ 5.50
3 Cat tembok Dulux Kg $ 4.92
4 Cat tembok Vinilex Kg $ 1.92
5 Cat dasar Kg $ 0.80
6 Cat Penutup Kg $ 2.00
9 Cat tembok Watershield Setara Jotun Kg $ 10.00
10 Cat tembok interior (Acrilic emulsion) Kg $ 5.00
11 Waterproofing (Liquid/coating) Kg $ 5.00
12 Water proofing (Bitumen) Kg $ 5.50
13 Cat meni kayu Kg $ 2.60
14 Cat meni besi Kg $ 2.75
15 Dempul Kg $ 2.00
16 Kuas roll Bh $ 2.50
17 Kuas cat Bh $ 1.50
18 Minyak Cat Kg $ 1.00
19 Politur/Vernis Ltr $ 6.50
20 Plamir kayu kg $ 3.60
21 Plamir tembok kg $ 1.00
22 Minyak Bekisting Ltr $ 3.00
23 Lem Kayu Kg $ 4.00
24 Amplas Lbr $ 0.45
PIPA PVC 4 Meter & Fittings
1 PVC Ø ½" Btg $ 3.00
2 PVC Ø ¾" Btg $ 3.10
3 PVC Ø 1" Btg $ 5.00
4 PVC Ø 1¼" Btg $ 6.60
5 PVC Ø 1½" Btg $ 6.00
6 PVC Ø 2" Btg $ 8.50
7 PVC Ø 3" Btg $ 16.00
8 PVC Ø 4" Btg $ 23.00
9 PVC Ø 5" Btg $ 33.75
10 PVC Ø 6" Btg $ 47.33
9 Socket Ø ½" Bh $ 0.31
10 Socket Ø ¾" Bh $ 0.35
11 Socket 1" Bh $ 0.50
12 Socket Ø 1¼" Bh $ 0.60
13 Socket Ø 1½" Bh $ 0.70
14 Socket Ø 2" Bh $ 0.70
15 Socket Ø 3" Bh $ 1.20
16 Socket Ø 4" Bh $ 1.75
17 Knee/Elbow Ø ½" Bh $ 0.35
18 Knee/Elbow Ø ¾" Bh $ 0.50
19 Knee/Elbow 1" Bh $ 0.50
20 Knee/Elbow Ø 1¼" Bh $ 0.60
21 Knee/Elbow Ø 1½" Bh $ 0.60
22 Knee/Elbow Ø 2" Bh $ 1.00
23 Knee/Elbow Ø 3" Bh $ 1.50
24 Knee/Elbow Ø 4" Bh $ 2.69
25 Tee Ø ½" Bh $ 0.40
26 Tee Ø ¾" Bh $ 0.45
27 Tee 1" Bh $ 0.55
28 Tee Ø 1¼" Bh $ 0.80
29 Tee Ø 1½" Bh $ 0.70
30 Tee Ø 2" Bh $ 0.80
31 Tee Ø 3" Bh $ 1.40
32 Tee Ø 4" Bh $ 2.50
33 Sock Drat Dalam (SDD) Ø ½" Bh $ 0.40
34 Sock Drat Dalam (SDD) Ø ¾" Bh $ 0.41
35 Sock Drat Dalam (SDD) 1" Bh $ 0.50
36 Sock Drat Luar (SDL) Ø ½" Bh $ 0.30
37 Sock Drat Luar (SDL) Ø ¾" Bh $ 0.36
38 Sock Drat Luar (SDL) 1" Bh $ 0.50
39 Sock Drat Luar (SDL) Ø 1¼" Bh $ 0.65
40 Sock Drat Luar (SDL) Ø 2" Bh $ 0.80
41 Knee Drat Dalam (SDD)/Faucet Elbow Ø ½" Bh $ 0.45
42 Knee Drat Dalam (SDD)/Faucet Elbow Ø ¾" Bh $ 0.55
43 Tee Drat Dalam (SDD)/Faucet Tee Ø ½" Bh
44 Tee Drat Dalam (SDD)/Faucet Tee Ø ¾" Bh $ 1.20
45 Vlok Sock (Reducing Socket ) Ø ¾" to Ø ½" Bh $ 0.50
46 Vlok Sock (Reducing Socket Ø 1" to Ø ¾" Bh $ 0.74
47 Vlok Sock (Reducing Socket Ø 2" to Ø 1" Bh $ 1.25
PENUTUP DINDING
1 Batako 40x20x10 Bh $ 0.55
2 Batako 40x20x10 Coloured Bh $ 0.95
3 Batako 20x20x10 Bh $ 0.40
4 Half Full Block 19x19x19 Bh $ 0.86
5 Full Block 39x19x19 Bh $ 1.65
6 Hollow Block 39x14x19 Bh $ 1.50
7 Hollow Block 40x15x20 Bh $ 1.55
8 Half Hollow Block 19x14x19 Bh $ 0.79
9 Bata merah 5 x 11 x 22 cm Bh $ 0.66
10 Porselin 11 x 11 cm Bh $ 0.30
11 Porselin 20 x 20 cm Bh $ 6.50
12 Keramik artistik 10 x 20 cm Bh $ 0.35
13 Batu bata Bh $ 0.80
14 Loster X 20x20cm Bh $ 0.90
15 Loster Ruby 20x20cm Bh $ 0.90
16 Loster Rose 20x20cm Bh $ 1.00
17 Loster Matahari 20x28cm Bh $ 1.00
18 Loster Angle 20x20cm Bh $ 1.00
19 Loster Diamond New 20x20cm Bh $ 0.90
20 Loster segi 1 20x20cm Bh $ 0.90
21 Loster segi 2 20x20cm Bh $ 0.90
22 Loster Sunflower 20x20cm Bh $ 0.80
23 Loster Tulip 20x20cm Bh $ 0.90
24 Loster Sunflower 20x20cm (Kaca) Bh $ 5.00
25 Loster Tulip 20x20cm (Kaca) Bh $ 5.00
26 Loster Coco New 20x20cm Bh $ 0.90
27 Loster Benz 20x20cm Bh $ 0.90
PENUTUP LANTAI (LANDSCAPING)
1 Unipave 22x10x6 Natural Bh $ 0.28
2 Unipave 22x10x8 Natural Bh $ 0.31
3 Top Cover 30x20x6 Natural Bh $ 0.33
4 Top Cover 30x20x8 Natural Bh $ 0.42
5 Hexagon 10x6 Natural Bh $ 0.32
6 Paving Stone 20x10x6 Natural Bh $ 0.28
7 Paving Stone 20x10x8 Natural Bh $ 0.31
8 Kerb Stone 60x35x16 Natural Bh $ 6.25
9 Kerb Stone 40x10x20 Natural Bh $ 2.35
10 Grass Block 54x36 Natural Bh $ 6.50
11 Footstone 23x19x6 Natural Bh $ 0.38
12 Footstone 25x20x6 Natural Bh $ 0.41
13 Triangular Hexstone 10x3x8 Natural Bh $ 0.39
14 Unipave 22x10x6 Coloured Bh $ 0.39
15 Unipave 22x10x8 Coloured Bh $ 0.43
16 Top Cover 30x20x6 Coloured Bh $ 0.89
17 Top Cover 30x20x8 Coloured Bh $ 1.00
18 Hexagon 10x6 Coloured Bh $ 0.53
19 Paving Stone 20x10x6 Coloured Bh $ 0.39
20 Paving Stone 20x10x8 Coloured Bh $ 0.43
21 Footstone 23x19x6 Coloured Bh $ 0.57
22 Footstone 25x20x6 Coloured Bh $ 0.59
23 Triangular Hexstone 10x3x8 Coloured Bh $ 0.59
24 Bunga natural Bh $ 0.30
25 Bunga coloured Bh $ 0.54
26 H block natural Bh $ 2.20
27 H block natural Bh $ 4.20
PENUTUP ATAP
1 Seng BJLS 0.20mm Lbr $ 4.05
2 Seng BJLS 0.30mm Lbr $ 5.50
3 Seng Plat BJLS 0.30mm bubungan M¹ $ 2.70
4 Seng Plat M¹ $ 6.00
5 Seng BJLS 0.42mm Colorbond M' $ 7.50
6 Seng Plat BJLS 0.42mm bubungan M¹ $ 12.25
7 Seng Plat BJLS 0.42mm Talang M¹ $ 5.00
8 Talang PVC 4" M¹ $ 14.50
9 Seng Genteng M²
10 Genteng plentong Bh $ 0.50
11 Bubungan plentong Bh $ 1.50
12 Bubungan Seng genteng M¹
13 Talang Seng genteng M¹
14 Asbes gelombang Lbr $ 6.00
15 Genteng sirap Lbr $ 2.00
16 Alang-alang Lbr $ 3.00
17 Tali Pengikat Roll $ 3.00
18 Aluminium foil "Wofen double side laminated" Roll $ 73.50
19 Aluminium foil "Wofen double side laminated" M2 $ 1.23
PEKERJAAN SANITASI
1 Closet Jongkok Merk INA Bh $ 14.50
2 Closet Duduk Merk INA Bh $ 155.00
3 Wastafel Merk INA Set $ 70.00
4 Closet Jongkok Merk TOTO Bh $ 45.00
5 Closet Jongkok Bh $ 45.00
6 Closet Duduk Merk TOTO CW630 PJ Bh $ 575.00
7 Closet Duduk Bh $ 355.00
8 Closet Duduk Bh $ 355.00
9 Wastafel Lengkap Bh $ 221.00
10 Wastafel Bh $ 221.00
11 Wastafel Merk TOTO L237V3 Bh $ 208.00
12 Bathtub ex Toto FB 170080N Bh $ 225.00
13 Kran air panas dan dingin ex Toto TX 467 SF Bh $ 300.00
14 Bak Cuci stainless steel Bh $ 55.00
15 Water Drine + Accessories Bh $ 15.00
16 Floor Drain ex Toto TX 1 BV1 Bh $ 52.50
17 Floor Drain ex Toto TX 1 AV2 Bh $ 42.25
18 Tissue/Papper Holder ex. Toto AW 360 J Bh $ 50.50
19 Tissue/Papper Holder ex. Toto S 20 Bh $ 36.40
20 Shower Fixed ex. Toto TX 465 SEN Bh $ 126.50
21 Shower Fixed ex. Toto TX 438 SE Bh $ 53.50
22 Tempat Handuk ex. Toto TX 701 AE Bh $ 102.50
23 Tempat Handuk ex. Toto TX 702 ARR Bh $ 51.50
24 Zinc basin untuk dapur Bh $ 78.00
25 Wall Faucet Bh $ 7.75
26 Floor Drain Bh $ 11.00
27 Tissue Holder TS 116R Bh $ 38.97
28 Tissue Holder Bh $ 9.00
29 Kran air biasa Bh $ 5.00
30 Jet Shower Bh $ 17.50
31 Bak mandi fiber glass 220 Ltr Bh $ 225.00
32 Bak mandi fiber glass Bh $ 125.00
33 Bak mandi keramik Bh $ 310.00
34 Urinoir INA Bh $ 114.00
35 Urinoir Lengkap Bh $ 225.00
36 Seal tape Bh $ 0.60
PEKERJAAN PINTU & JENDELA
1 Kusen Pintu + Ventilasi 2x0.7x0.03 Bh $ 77.27
2 Kusen Pintu + Ventilasi 2x0.8x0.03 Bh $ 81.82
3 Kusen Pintu + Ventilasi 2x0.9x0.03 Bh $ 85.45
4 Pintu Panel 2x0.7x0.03 K.M. Aluminium Bh $ 17.00
5 Pintu Panel 2x0.7x0.03 Kayu Bh $ 45.00
6 Pintu Panel 2x0.8x0.03 Bh $ 120.00
7 Pintu Panel 2x0.9x0.03 Aluminium Bh $ 55.00
8 Pintu Panel 2x0.9x0.03 Kayu Bh $ 275.00
9 Kusen Jendela + Ventilasi 1x0.6x0.03 Bh $ 52.73
10 Kusen Jendela + Ventilasi 1.2x0.6x0.03 Bh $ 56.36
11 Kusen Jendela + Ventilasi 1.5x0.6x0.03 Bh $ 61.82
12 Jendela kaca, rangka kayu 1x0.6x0.03 Bh $ 81.82
13 Jendela kaca, rangka kayu 1.2x0.6x0.03 Bh $ 86.36
14 Jendela kaca, rangka kayu 1.5x0.6x0.03 Bh $ 46.36
15 Kusen Jendela NAKO 1.00m Bh $ 50.91
16 Kusen Jendela NAKO 1.20m Bh $ 61.82
17 Jendela NAKO 1.00m komplit Bh $ 81.82
18 Jendela NAKO 1.20m komplit Bh $ 90.91
19 Kusen Jendela kaca Mati M² $ 50.00
20 Jendela kaca Mati M² $ 45.45
21 Kaca 5mmn putih (1.22x1.53cm) M² $ 18.00
24 Kaca 6mm M² $ 9.00
25 Kaca 8mm M² $ 10.00
26 Rangka + kaca 5 mm M² $ 45.00

BAHAN KACA
1 Kaca Bening tebal 3mm M² $ 14.00
2 Kaca Bening tebal 5mm M² $ 16.00
3 Kaca Bening tebal 8mm M² $ 25.00
4 Kaca Bening tebal 10mm M² $ 35.00
5 Kaca Raybend tebal 3mm M² $ 12.00
6 Kaca Raybend tebal 5mm M² $ 16.00
7 Kaca Raybend tebal 8mm M² $ 22.00
8 Kaca Raybend tebal 10mm M² $ 36.00
9 Kaca Raybend tebal 12mm M² $ 45.00
AKSESORIS PEMASANGAN PINTU & JENDELA
1 Engsel Pintu 4" (kuningan modern 4x3) Bh $ 4.50
2 Engsel Jendela (RRT 2" Hinges) Bh $ 3.00
3 Grandel Pintu (Kuningan awa 3") Bh $ 1.75
4 Kait/Hak angin (Kuningan awa 8") set Bh $ 1.20
5 Kunci tanam pintu panel Bh $ 30.00
6 Skrup Kayu (Dry wall 6x1 @ 50 pcs) Bh $ 1.55
7 Lem Kayu (Rajawali, 1kg) Kg $ 4.65
8 Hak angin otomatis (Art flush tower) Bh
9 Kunci tanam biasa Bh $ 16.00
10 Kunci Slot Bh $ 28.00

KABEL, LAMPU & AKSESORIS LISTRIK


1 Kabel NYY 3x2.5mm M¹ $ 1.85
2 Kabel NYY 3x4mm M¹ $ 2.95
3 Pipa Installasi kabel Btg $ 1.30
4 Lampu 20 wat Bh $ 1.20
5 Lampu neon 2 x 38 wat Bh $ 9.50
6 Saklar Tunggal Bh $ 2.00
7 Saklar Ganda Bh $ 2.50
8 Saklar Triple Bh $ 2.90
9 Stop kontak Bh $ 2.00
10 Terminal T box Bh
ALAT BERAT
1 Concrete mixer/molen Jam $ 3.00
2 Bh
3 Bh
4 Bh
5 Bh
6 Bh
TIANG PAGAR
1 Kancil 37cm Bh $ 2.25
2 Lady 52cm Bh $ 2.60
3 Lotus 56cm Bh $ 2.75
4 Putri 60cm Bh $ 3.00
5 Orkid 61cm Bh $ 3.45
6 Crown 62cm Bh $ 3.00
7 Luis 63cm Bh $ 3.00
8 Oscar 64cm Bh $ 3.10
9 Suki 70cm Bh $ 3.25
10 Raja 90cm Bh $ 3.50

GORONG - GORONG
1 RCPC DIA 300mm 2 METER M $ 177.62
2 RCPC DIA 400mm 2 METER M $ 213.85
3 RCPC DIA 500mm 2 METER M $ 259.43
4 RCPC DIA 600mm 2 METER M $ 302.67
6 RCPC DIA 800mm M $ 213.04
7 RCPC DIA 800mm 2 METER M $ 370.46
8 RCPC DIA 900mm 2 METER M $ 425.00
9 RCPC DIA 1000mm M $ 262.05
10 RCPC DIA 1000mm 2 METER M $ 455.77
11 RCPC DIA 1200mm M $ 329.59
12 RCPC DIA 1200mm 2 METER M $ 572.63

SENG GENTENG BERWARNA (Lebar 0.82m)


1 PANJANG 5.6m Lbr $ 51.25
2 PANJANG 4.98m Lbr $ 45.55
3 PANJANG 2.5m Lbr $ 23.50
4 PANJANG 1.3m Lbr $ 12.06
5 PANJANG 0.71m Lbr $ 7.25
6 PANJANG 0.40m Lbr $ 5.25
7 Bubungan genteng Bulat/Barrel Ridge Capping 2.7 m Lbr $ 22.25
8 Bubungan persegi / valley ridge caping 2.2m Lbr $ 21.00
9 Taka Janela/Crimp Curve Zinc 1.2m Lbr $ 17.38

SENG GENTENG BERWARNA (Lebar 0.82m)


1 Tiang Concrete Listrik 9.00m Batang $ 450.00
2 Tiang Concrete Listrik 11.00m Batang $ 550.00
3 Tiang Concrete Listrik 12.00m Batang $ 620.00
DAFTAR UPAH TENAGA KERJA DISTRIK DILI
AGENCIA DESENVOLVIMENTO NACIONAL

NO URAIAN SATUAN HARGA (USD) Or/jam


1 Pekerja 0r/hr 5 $ 0.63
2 Tukang Or/hr 8 $ 1.00
3 Tukang batu Or/hr 8 $ 1.00
4 Tukang kayu Or/hr 8 $ 1.00
5 Tukang besi Or/hr 8 $ 1.00
6 Pemasang Atap Alang-Alang Or/hr 12 $ 1.50
7 Kepala Tukang Or/hr 10 $ 1.25
8 Mandor Or/hr 12 $ 1.50
9 Pekerja Penganyam Or/hr 5 $ 0.63
10 Pengayam Or/hr 8 $ 1.00
11 Mandor Penganyam Or/hr 12 $ 1.50
12 Pekerja Pengisi Or/hr 5 $ 0.63
13 Mandor Pengisi Or/hr 12 $ 1.50
14 Tukang Las Or/hr 8 $ 1.00
15 Tukang cat Or/hr 8 $ 1.00
REAL KOEFICIENT AND

1 M' Pagar sementara dari seng gelombang, tinggi 2m


Bahan Semen Portland Kg.
Bahan Seng gelombang 0.2 Lbr.
Bahan Pasir beton M³
Bahan Koral Beton M³
Bahan Kayu usuk 5/7 M³
Bahan Paku biasa 2"-5" Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M' Pengukuran & pemasangan bouwplank.
Bahan Kayu usuk 5/7 M³
Bahan Paku biasa 2"-5" Kg.
Bahan Kayu papan 3/20 M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pembuatan gudang semen dan alat-alat.
Bahan Dolken kayu Ø 8-10/4m Btg.
Bahan Kayu M³
Bahan Paku biasa 2"-5" Kg.
Bahan Semen Portland Kg.
Bahan Pasir beton M³
Bahan Koral Beton M³
Bahan Seng gelombang BJLS 28 Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1M² Pembuatan rumah jaga/konstruksi kayu.
Bahan Dolken kayu Ø 8-10/4m Btg.
Bahan Kayu M³
Bahan Paku biasa 2"-5" Kg.
Bahan Seng gelombang BJLS 28 Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Membersihkan lapangan dan perataan.
Ten Kerja Pekerja Oh
Ten Kerja Mandor Oh
1 Buah Pemasangan papan nama proyek.
Bahan Papan nama proyek Bh
Bahan Usuk 5/7 kayu kelas II M³
Bahan Paku biasa 2"-5" Kg.
Ten Kerja Pekerja Oh
Ten Kerja Mandor Oh
1 M² Pembuatan bedeng buruh
Bahan Dolken kayu Ø 8-10/4m Btg.
Bahan Kayu M³
Bahan Paku biasa 2"-5" Kg.
Bahan Semen Portland Kg.
Bahan Pasir beton M³
Bahan Koral Beton M³
Bahan Seng gelombang BJLS 28 Lbr.
Bahan Plywood 4 mm Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 buah pembuatan bak takaran (40x50x20) cm.
Bahan Kayu terentang M³
Bahan Paku biasa 2"-5" Kg.
Bahan Kaso 5/7 - 4m Btg.
Tenaga Tukang kayu Oh
Kerja
Tenaga Mandor Oh
Kerja
1M² Pembuatan jalan sementara
Bahan Batu belah 15/20 M³
Bahan Batu pecah 5/7 M³
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Bongkaran beton bertulang.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Bongkaran dinding tembok bata merah.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ Galian tanah biasa sedalam 1 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Galian tanah biasa sedalam 2 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Galian tanah biasa sedalam 3 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Galian tanah keras sedalam 1 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Galian tanah cadas sedalam 1 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Galian tanah lumpur sedalam 1 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M2 Pekerjaan Stripping tebing setinggi 1 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Membuang tanah sejauh 30 meter.
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
Menimbun kembali 1 m3 galian
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Pemadatan tanah (Per 20 Cm).
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ Timbunan pasir.
Bahan Pasir Urug M³
Tenaga Pekerja Hr.
Kerja
Tenaga Mandor Hr.
Kerja
1 M³ Pemasangan lapisan ijuk tebal 10 Cm
Bahan Ijuk M³
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Penimbunan sirtu padat untuk peninggian lantai bangunan.
Bahan Sirtu M³
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ Pasang pondasi batu belah 1 Pc : 3 Ps
Bahan Batu belah 15/20 cm M³
Bahan Semen Portland Kg.
Bahan Pasir pasangan M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Pasang pondasi batu belah 1 Pc :4 Ps
Bahan Batu belah 15/20 cm M³
Bahan Semen Portland Kg.
Bahan Pasir pasangan M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Pasang pondasi batu belah 1 Pc : 5 Ps
Bahan Batu belah 15/20 cm M³
Bahan Semen Portland Kg.
Bahan Pasir pasangan M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ Pasang pondasi batu kosong
Bahan Batu belah 15/20 cm M³
Bahan Pasir urug M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Pasangan pondasi sumuran Ф 1 m.
Bahan Batu belah 15/20 cm M³
Bahan Semen portland Kg
Bahan Pasir beton M³
Bahan Kerikil/koral M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Pembesian 10 kg dengan besi polos / ulir
Bahan Besi beton (polos/ulir) Kg.
Bahan Kawat Beton Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang bekisting untuk pondasi
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 10' Kg.
Bahan Minyak bekisting Ltr
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang bekisting untuk sloof
Bahan Plywood 9mm Lbr.
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 10' Kg.
Bahan Minyak bekisting Ltr
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang bekisting untuk kolom
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan balok kayu klas II M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"-10"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Pasang bekisting untuk balok
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan balok kayu klas II M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"-10"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang bekisting untuk lantai
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan balok kayu klas II M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"-10"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang bekisting untuk tangga
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan balok kayu klas II M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"-10"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Pasang jembatan untuk pengecoran beton
Bahan Kayu klas III (papan) M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Dolken kayu 8"-10"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat pondasi beton bertulang K 175 , F'c =14.5 Mpa
(150
BahanKg besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Pekerja Oh
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat sloof beton bertulang K 175 , F'c =14.5 Mpa
(200
BahanKg besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat kolom beton bertulang K 175 , F'c =14.5 Mpa
(300
BahanKg besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Kayu klas II balok M3
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat balok beton bertulang K 175 , F'c =14.5 Mpa (200 Kg besi + bekisting).
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Kayu klas II balok M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat plat beton bertulang K175, f*c 14.5 Mpa
(150
BahanKg besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Kayu klas II balok M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M' membuat kolom praktis beton bertulang (11 x 11) cm.
Bahan Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 7.4 Mpa ( K 100 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 9.8 Mpa ( K 125 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat beton mutu f*c = 12.2 Mpa ( K 150 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 14.5 Mpa ( K 175 )
Bahan Semen Porland Kg.
Bahan Batu koral beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 16.9 Mpa ( K 200 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 19.3 Mpa ( K 225 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat beton mutu f*c = 21.7 Mpa ( K 250 )
Bahan Semen Portland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 24 Mpa ( K 275 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 26.4 Mpa ( K 300 )
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat beton mutu f*c = 31.2 Mpa ( K 350)
Bahan Semen Porland Kg.
Bahan Batu koral Beton m3
Bahan Pasir beton m3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat sloof beton bertulang K 350 ,F*c =31.2 Mpa
(150
BahanKg besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr.
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Plywood tebal 9 mm Lbr
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ membuat balok beton bertulang mutu K 350, f*c = 31.2 Mpa
(175Kg
Bahan besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Kayu klas II balok M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M³ membuat balok beton bertulang mutu K 275, f*c 24 Mpa
(175Kg
Bahan besi + bekisting). Kayu klas III M³
Bahan Paku biasa 5' - 12' Kg.
Bahan Minyak bekisting Ltr
Bahan Besi beton polos Kg.
Bahan Kawat beton Kg.
Bahan Semen portland Kg.
Bahan Pasir beton M³
Bahan Koral beton M³
Bahan Kayu klas II balok M³
Bahan Plywood tebal 9 mm Lbr.
Bahan Dolken kayu 8"/4 m Btg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 kg Pekerjaan kuda-kuda baja (Truss Steel Works)
Bahan Steel truss Box Kg.
Bahan 60x10x1.5mmx600mm
Self Drilling Screws 12-14x20mm buah
Tenaga Pekerja oh
Kerja
Tenaga Tukang oh
Kerja
Tenaga Kepala Tukang oh
Kerja
Tenaga Mandor oh
Kerja
1 kg Purlin Steel Works
Bahan Steel Purlin 50x20x10x1.5x600mm Kg.
Bahan Self Drilling Screws 12-14x20mm buah
Tenaga Pekerja oh
Kerja
Tenaga Tukang oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor oh
Kerja
1 M Pekerjaan rangka atap
Bahan RHS 100.50.5 Btg
Bahan Kawat las Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Las Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M Pasang Gording Canal C 75.45.15.1.6
Bahan Canal C 75.35.15.1.5 Btg
Bahan Kawat las Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Las Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Baja Ringan
Bahan Light Steel Profile M
Bahan Screw Ls
Bahan Dynabolt Ls
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang atap seng gelombang
Bahan Seng gelombang Lbr.
Bahan Paku Seng Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M' Pasang nok atap sirap
Bahan Seng plat 3" x 6" BJLS 28 Lbr.
Bahan Paku ½" - 1" Kg.
Bahan Paku 2" - 5" Kg.
Bahan Kayu papan 3 cm M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang atap genteng plentong besar
Bahan Genteng plentong Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M' Pasang bubungan plentong besar
Bahan Bubungan plentong Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang atap asbes gelombang 1,80 x 0,92m x 5mm
Bahan Asbes gelombang Lbr.
Bahan Paku pancing 60 x 230 Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang atap sirap
Bahan Genteng sirap Bh
Bahan Paku biasa ½" - 1" Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang atap alang-alang
Bahan Alang-alang Lbr.
Bahan Tali Pengikat Kg.
Tenaga Pekerja Kg.
Kerja
Tenaga Mandor M³
Kerja
KEBUTUHAN UNIT
1 M² Pasangan Batako 40x20x10 cm, camp speci 1PC : 4Ps
Bahan Batako Bh.
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasangan Paving block 25x20x6cm
Bahan Paving block Bh.
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasangan Paving block 20x10x6 cm
Bahan Paving block Bh.
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M³ Pasang Bronjong (2 x 1 x 1 m)
Bahan Batu kali M³
Bahan Bronjong Unit
Tenaga Pekerja Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 4 Ps, tebal 15 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 2 Ps, tebal 20 mm
Bahan Semen Portland Kg.
Bahan Pasir pasangan M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 3 Ps, tebal 20 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 4 Ps, tebal 20 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Plesteran Ciprat, 1 Pc : 2 Ps
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Plesteran 1 Pc : 5 Ps, tebal 20 mm
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 m2 finishing siar pasangan dinding bata merah
Bahan Semen Portland Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 finishing siar pasangan dinding conblock ekspose
Bahan Semen Portland Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 Ps
Bahan Semen Portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 m2 Acian
Bahan Semen Portland Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Batu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Membuat dan memasang1 M³ kusen pintu dan jendela kayu kelas I
Bahan Balok kayu M³
Bahan Paku 10 cm Kg.
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat dan memasang1 M³ kusen pintu dan jendela kayu kelas II/III
Bahan Balok kayu M³
Bahan Paku 10 cm Kg.
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat dan memasang1 M² pintu klamp standar, Kayu kelas II
Bahan Papan kayu M³
Bahan Paku 5-7 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat dan memasang1 M² Pintu klamp sederhana, Kayu kelas III
Bahan Papan kayu M³
Bahan Paku 5-7 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Membuat dan memasang1 M² daun pintu panel, kayu kelas I/II
Bahan Papan kayu M³
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat dan memasang1 M² pintu dan jendela kaca, kayu kelas I/II
Bahan Papan kayu M³
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat dan memasang1 M² pintu dan jendela jalusi, kayu kelas I/II
Bahan Papan kayu M³
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Membuat 1 M² daun pintu plywood rangkap,rangka tertutup kayu kelas II (lebar sampai 90 cm)
Bahan Papan kayu M³
Bahan Paku 1 - 2,5 cm Kg.
Bahan Lem kayu Kg.
Bahan Plywood 4 mm uk.90x220cm Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Membuat 1 M² daun pintu plywood rangkap, rangka expose kayu kelas I/II
Bahan Papan kayu M³
Bahan Paku 1 - 2,5 cm Kg.
Bahan Lem kayu Kg.
Bahan Plywood 4 mm uk.90x220cm Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² jalusi kusen, kayu kelas I/II
Bahan Papan kayu M³
Bahan Paku 1 - 2,5 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² teakwood rangkap, rangka expose kayu klas I
Bahan Papan kayu M³
Bahan Paku 1 - 2,5 cm Kg.
Bahan Lem kayu Kg.
Bahan Teakwood 4 mm uk.90x220cm Lbr.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M³ Konstruksi kuda-kuda konvensional, kayu klas I, II dan III bentang 6 m'
Bahan Balok kayu M³
Bahan Besi strip tebal 5mm. Kg.
Bahan Paku 12 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M³ Konstruksi kuda-kuda expose, kayu klas I
Bahan Balok kayu M³
Bahan Besi strip tebal 5mm. Kg.
Bahan Paku 12 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M³ Konstruksi gording,kayu klas II
Bahan Balok kayu M³
Bahan Besi strip tebal 5mm. Kg.
Bahan Paku 12 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² rangka atap genteng keramik, kayu kelas II
Bahan Kaso-kaso (5x7)cm M³
Bahan Reng (2x3)cm m3
Bahan Paku 5 dan 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² rangka atap genteng beton, kayu kelas II
Bahan Kaso-kaso (5x7)cm M³
Bahan Reng (3x4)cm M³
Bahan Paku 5 dan 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M² rangka atap sirap, kayu kelas II
Bahan Kayu klas II M³
Bahan Paku 5 sampai 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² rangka langit-langit, (50x100) cm kayu kelas II/III
Bahan Kaso-kaso (5x7)cm M³
Bahan Paku 7 dan 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² rangka langit-langit, (60x60) cm kayu kelas II/III
Bahan Kaso-kaso (5x7)cm M³
Bahan Paku 7 dan 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1M' lisplank uk. 3x20 cm, kayu kelas I/II
Bahan Papan kayu M³
Bahan Paku 5 sampai 7 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1M' lisplank uk. 3x30 cm, kayu kelas I/II
Bahan Papan kayu M³
Bahan Paku 5 sampai 7 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M² rangka dinding pemisah, 60x120 cm, kayu kelas II/III
Bahan Balok kayu M³
Bahan Paku 5 sampai 7 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² dinding pemisah teakwood rangkap, kayu kelas II
Bahan Balok kayu 6/12 cm M³
Bahan Paku 5 dan 10 cm Kg.
Bahan Teakwood 4 mm uk.120x240cm Lbr.
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² dinding pemisah plywood rangkap, kayu kelas II
Bahan Balok kayu 6/12 cm M³
Bahan Paku 5 dan 10 cm Kg.
Bahan Plywood 4 mm uk.120x240cm Lbr.
Bahan Lem kayu Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² dinding lambriziring papan kayu klas I
Bahan Papan kayu M³
Bahan Paku 5 dan 10 cm Kg.
Bahan Paku skrup 10 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang M² dinding lambriziring plywood
Bahan Lambrizing plywood 4 mm ukuran Lbr.
Bahan 120x240
Paku 1 dan cm2.5 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala Tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² pasang lantai ubin pc abu-abu 20 x20 cm
Bahan Ubin abu-abu 20 x 20 cm Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Bahan Colour cement Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M' pasang plint ubin pc abu-abu 15 x20 cm
Bahan Plint ubin Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang lantai kayu
Bahan Lantai kayu (gym floor) M²
Bahan Lem Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang kayu Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² Pasang lantai karpet
Bahan Karpet M²
Bahan Lem Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang Kayu Oh
Kerja
Tenaga Kepala tukang kayu Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² Pasang batu koral sikat campuran 1 : 2
Bahan Batu koral sikat Kg.
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang batu Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m plint kayu kelas II ukuran (2 x 10) cm
Bahan Papan kayu klas II M³
Bahan Paku skrup 5 cm Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 lantai keramik ukuran 30 x 30 cm
Bahan Keramik Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Bahan Semen warna Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 lantai keramik ukuran 40 x 40 cm
Bahan Keramik Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Bahan Semen warna Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 m2 lantai keramik ukuran 60 x 60 cm
Bahan Keramik Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Bahan Semen warna Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 batu alam
Bahan Batu alam M²
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M² langit-langit asbes semen 4/5/6mm
Bahan Plat asbes M²
Bahan Paku biasa ½" - 1" Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² langit-langit tripleks
Bahan Tripleks Lbr.
Bahan Paku biasa ½" - 1" Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² langit-langit lambriziring kayu 9cm
Bahan Kayu papan M³
Bahan Paku biasa ½" - 1" Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M' list langit-langit kayu profil
Bahan Lis kayu profil M'
Bahan Paku lis Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M² langit-langit gypsum board ukuran (1200x2400x9)mm
Bahan Gypsum board Lbr.
Bahan Paku skrup Kg.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang kayu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 kg besi profil
Bahan Besi profil Kg
Bahan Meni Besi kg
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m2 jendela nako & tralis
Bahan Rangka + kaca 5 mm M2
Bahan Paku skrup 1 cm – 2,5 cm Bh
Bahan Besi strip M'
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m talang datar/ jurai seng bjls 28 lebar 90 cm
Bahan Seng plat M'
Bahan Paku 1 cm – 2,5 cm kg
Bahan Papan kayu klas II atau III M3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30
Bahan Seng plat M'
Bahan Paku 1 cm – 2,5 cm kg
Bahan Papan kayu klas II atau III M3
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 Bh. pasang kunci tanam biasa
Bahan Kunci tanam biasa Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 Bh. pasang engsel pintu
Bahan Engsel pintu Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 Bh. pasang engsel jendela kupu-kupu
Bahan Engsel jendela Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 Bh. pasang kait angin
Bahan Kait angin Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 Bh. pasang kunci slot
Bahan Kunci slot Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² pasang kaca, tebal 3 - 5 mm
Bahan Kaca Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang besi Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 buah kloset duduk/monoblok lengkap
Bahan Kloset duduk lengkap Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 buah kloset jongkok porselen
Bahan Kloset jongkok porselen Bh.
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 buah urinoir
Bahan Urinoir lengkap Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 buah wastafel
Bahan Wastafel lengkap Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 buah bak mandi Fibreglass, volume 220 ltr
Bahan Bak fibreglass 220 ltr lengkap Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Pasang 1 bh bak kontrol pasangan batu bata 30 x 30/T35 cm
Bahan Batu bata Bh
Bahan Semen portland Kg.
Bahan Pasir pasang M³
Bahan Koral beton M³
Bahan Besi beton Kg.
Bahan Pasir beton M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M' pipa galvanis Ø ½" - 1"
Bahan Pipa galvanis M'
Bahan Asesories (% dari harga pipa) %
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M' pipa galvanis Ø 1½" - 3"
Bahan Pipa galvanis M'
Asesories (% dari harga pipa) %
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M' pipa PVC tipe AW Ø ½" - 1½"
Bahan Pipa PVC M'
Bahan Asesories (% dari harga pipa) %
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
Memasang 1 M' pipa PVC tipe AW Ø 2"
Bahan Pipa PVC M'
Bahan Asesories (% dari harga pipa) %
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 M' pipa PVC tipe AW Ø 3"-4"
Bahan Pipa PVC M'
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
Memasang 1 buah kran Ø ½" atau ¾"
Bahan Kran air Bh
Bahan Seal tape Bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang batu Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup).
Bahan Cat meni Kg.
Bahan Dempul/plamir Kg.
Bahan Cat dasar Kg.
Bahan Cat penutup 2 x Kg.
Bahan Kuas bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² pengecatan bidang kayu dengan vernis
Bahan Vernis Kg.
Bahan Dempul/plamir Kg.
Bahan Amplas Lbr.
Bahan Kuas Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup).
Bahan Plamir Kg.
Bahan Cat dasar Kg.
Bahan Cat penutup 2 x Kg.
Bahan Kuas bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
KEBUTUHAN UNIT
1 M² pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup).
Bahan Cat dasar Kg.
Bahan Cat penutup 2 x Kg.
Bahan Kuas bh
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² pengecatan permukaan baja dengan meni besi
Bahan Meni besi/cat besi Kg.
Bahan Minyak cat ltr
Bahan Kuas Bh.
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
1 M² pengecatan permukaan baja, 1 lapis dengan meni besi dan perancah.
Bahan Meni Besi Kg.
Bahan Kuas Bh.
Bahan Perancah kayu M³
Tenaga Pekerja Oh
Kerja
Tenaga Tukang cat Oh
Kerja
Tenaga Kepala tukang Oh
Kerja
Tenaga Mandor Oh
Kerja
2.5000
1.2158
0.005
0.009
0.041
0.0829
0.2495
0.2858
0.02
0.02

0.0177
0.02
0.007
0.1
0.1
0.01
0.005

1.7
0.2074
0.3
10.5
0.03
0.05
1.5306
1
2
0.2
0.05
KOEFISIEN

3.05
0.2807
0.7117
1.709
1.0167
1.525
0.1527
0.051
0.1
0.05

1
0.0235
0.1665
0.2503
0.0443

1.25
0.186
0.3
18
0.03
0.05
1.5401
0.5883
1
2
0.2
0.05
KOEFISIEN

0.037
0.082
1.025
0.3075
0.002

0.15
0.09
0.01
1
0.05

6.667
0.333

6.667
0.033
KOEFISIEN

0.67
0.032
0.75
0.047

0.89
0.0685

0.95
0.053

1.5
0.06

0.9163
0.07

0.423
0.026

0.33
0.0126

0.2142
0.0143

0.5
0.05
KOEFISIEN

1.2
0.3023
0.0127

2.7577
0.15
0.015

1.2
0.3046
0.0379
KOEFISIEN

1.149
202
0.485
1.5
0.6
0.0905
0.0973

1.2
163
0.5348
1.8313
0.8404
0.0991
0.075

1.2
136
0.544
1.7141
0.713
0.1095
0.1919
KOEFISIEN

1.2
0.3033
0.78
0.39
0.0579
0.0579

0.45
213.4
0.3837
0.567
2.2353
0.458
0.0457
0.09
KOEFISIEN

10.5
0.15
0.0949
0.0757
0.0109
0.0223
0.0329
0.1586
0.0168
0.52
0.26
0.026
0.026

0.35
0.045
0.3
0.0256
0.52
0.26
0.026
0.026

0.04
0.4
0.0555
0.015
0.35
2
0.66
0.33
0.033
0.033
KOEFISIEN

0.04
0.4
0.0536
0.036
0.35
2
0.66
0.33
0.033
0.033

0.04
0.4
0.0536
0.036
0.35
2
0.66
0.33
0.033
0.033

0.03
0.4
0.15
0.0183
0.3455
2
0.66
0.33
0.033
0.0161
KOEFISIEN

0.026
0.6
0.5
0.15
0.05
0.0051
0.008

0.2
1.5
0.0667
150
2.25
323
0.52
0.78
4.2108
0.3093
1.0842
1.05
0.245
0.1922
KOEFISIEN

0.27
2
0.1
200
3
323
0.52
0.78
4.9152
0.3093
1.56
1.4
0.327
0.2013

0.4
4
2
300
4.5
323
0.52
0.78
0.15
3.5
16
7.175
0.3093
2.792
2.1
0.4883
0.2747
KOEFISIEN

0.3200
3.2000
2
200
3
323
0.52
0.78
0.15
3.5
16
7.175
0.3093
1.65
1.4
0.4883
0.2747

0.135
1.3497
0.675
157.5
2.25
323
0.52
0.78
0.0505
2.181
16
6.769
0.3093
1.3
1.05
0.265
0.265
KOEFISIEN

0.0025
0.0452
3
0.45
4.175
0.0063
0.0093
0.1588
0.0473
0.0113
0.0118
0.0108
0.01

254
0.8197
0.62
1.65
0.289
0.029
0.02
284.55
0.8273
0.6175
1.682
0.2805
0.028
0.02
KOEFISIEN

315.7
0.818
0.5845
1.6915
0.282
0.0285
0.02

323
0.78
0.52
1.65
0.2675
0.0267
0.02

325
0.81
0.54
1.65
0.275
0.038
0.03

377.02
0.82
0.5
1.6694
0.305
0.0456
0.04
KOEFISIEN

384
0.7368
0.4697
1.65
0.275
0.0458
0.04

412
0.78
0.556
1.682
0.3125
0.05
0.05

413
0.7206
0.4769
1.65
0.275
0.0459
0.04

464.35
0.78
0.4867
2.1
0.35
0.0717
0.07
KOEFISIEN

0.277
2.05
0.615
150
2.25
464.35
0.4867
0.78
2.916
4.346
0.282
1.3325
1.0765
0.27
0.2
0.328
3.28
1.64
175
2.625
464.35
0.4867
0.78
0.15
4
16
5.4325
0.3415
1.65
1.4
0.333
0.3
KOEFISIEN

0.328
3.28
1.64
175
2.625
412
0.556
0.78
0.14
4
16
5.4325
0.3415
1.65
1.4
0.333
0.3
KOEFISIEN

1.0250
1.0250
0.041
0.02
0.01
0.01
1.0250
1.025
0.0205
0.0105
0.0011
0.0005

0.205
0.0105
0.0615
0.0615
0.006
0.003

0.205
0.0105
0.0585
0.03
0.006
0.003
KOEFISIEN

4.56
1
1
0.077
0.154
0.0155
0.004

0.7
0.02
0.1409
0.1256
0.051
0.0067

0.4
0.06
0.05
0.006
0.125
0.25
0.042
0.0063

23.077
0.15
0.0656
0.007
0.007
KOEFISIEN

4.4351
8
0.032
0.4
0.2
0.02
0.002

0.7577
0.12
0.14
0.067
0.007
0.007

61
0.2033
0.1687
0.2543
0.0253
0.008

6.6625
0.5125
0.205
0.0105
KOEFISIEN

12.5
12
0.038
0.3518
0.1131
0.0193
0.0288
20.6
8.32
0.062
0.321
0.437
0.022
0.0175

51.5
8.32
0.062
0.321
0.437
0.022
0.0175

1.1
0.5
0.6667
0.024
KOEFISIEN

7.0521
0.02
0.2559
0.15
0.0167
0.0167

6.24
0.0214
0.2559
0.15
0.0167
0.0167

12.75
0.027
0.35
0.15
0.0202
0.0273

10.35
0.031
0.35
0.15
0.0202
0.0273

8.32
0.032
0.35
0.15
0.0202
0.0273
KOEFISIEN

5.608
0.011
0.2559
0.127
0.013
0.015

4.7751
0.022
0.2559
0.15
0.0167
0.0167

6.449
0.023
0.35
0.15
0.0202
0.0273
KOEFISIEN

3.822
0.15
0.0731
0.0074
0.0069

1.64
0.072
0.036
0.004
0.004

6.34
0.012
0.3
0.15
0.015
0.027

3.4988
0.1753
0.1057
0.0146
0.0146
KOEFISIEN

1.108
1.0031
1
6.938
20.814
2.1521
0.4283

1.108
1.0031
1
6
18
2
0.389

0.04
0.475
0.5725
1.5508
0.1551
0.0956

0.04
0.475
0.5725
1.5508
0.1551
0.0956
KOEFISIEN

0.04
0.5
1
2.5543
0.2556
0.05

0.024
0.1593
0.8
2.1006
0.2043
0.04

0.0385
0.5
1
3
0.3
0.05

0.025
0.03
0.5
1
0.6359
2.0127
0.2
0.0546
KOEFISIEN

0.026
0.03
0.5
1
0.6651
2.1006
0.2043
0.056

0.06
0.15
0.5743
2
0.2
0.0764

0.0217
0.03
0.3
1
0.6366
2.0434
0.2043
0.056

1.1
15
3.446
4.4054
10.154
1.0154
0.2
KOEFISIEN

1.115
15
2.426
4.7508
20.1
2.01
0.2375

1.1
15
3
2.4
7.2
0.72
0.12

0.014
0.0038
0.25
0.1
0.1
0.01
0.005
0.014
0.007
0.25
0.1
0.1
0.01
0.005
KOEFISIEN

0.169
0.205
0.123
0.123
0.0123
0.006

0.015
0.2
0.15
0.3
0.03
0.075

0.0163
0.2543
0.2033
0.305
0.0305
0.075

0.01
0.0759
0.1194
0.239
0.0239
0.005

0.011
0.0759
0.1194
0.239
0.0239
0.005
KOEFISIEN
0.0283
0.1527
0.1527
0.4577
0.0473
0.008

0.0275
0.15
0.8451
0.45
0.1436
0.4307
0.0431
0.0077

0.028
0.144
0.8451
0.45
0.1914
0.5742
0.0574
0.0096

0.007
0.1025
0.1538
0.615
1.845
0.1845
0.0308
KOEFISIEN

0.4100
0.0515
0.0255
0.077
0.0077
0.001
KOEFISIEN

25.3588
10.4
0.045
0.3467
0.3228
0.1966
0.0197
0.0197

6.1554
1.2724
0.0033
0.09
0.09
0.009
0.0045

1.1177
0.61
0.7
0.356
0.0407
0.0407

1.05
0.35
0.171
0.127
0.0127
0.0091
KOEFISIEN

10
3.895
0.0665
0.5125
0.205
0.0205
0.0205

0.0023
0.05
0.12
0.12
0.012
0.006
11.87
8
0.045
1.5
0.7
0.35
0.035
0.035

6.625
8
0.045
0.94
0.7
0.35
0.035
0.035
KOEFISIEN

3
8
0.045
0.9321
0.7
0.35
0.035
0.035

1.1
11.5453
0.0193
2.336
0.3047
0.0117
0.0138
KOEFISIEN

1.1
0.01
0.03
0.07
0.007
0.04

0.375
0.03
0.1
0.1
0.01
0.005

0.0155
0.0105
0.82
0.82
0.082
0.041

1.05
0.0329
0.05
0.05
0.005
0.003

0.3646
0.11
0.228
0.4158
0.0416
0.014
KOEFISIEN

1.1
0.071
0.06
0.06
0.006
0.0023

1.1
10
7
0.2
0.2
0.02
0.001

1.05
0.015
0.019
0.231
0.4
0.04
0.01

1.05
0.01
0.0125
0.15
0.3
0.03
0.008
KOEFISIEN

1
0.01
0.5
0.01
0.005

1
0.015
0.15
0.015
0.001

1
0.01
0.1
0.01
0.001

1
0.015
0.15
0.015
0.001

1
0.0098
0.0683
0.0068
0.001
1.1
0.015
0.15
0.015
0.001
KOEFISIEN

1
1.4501
1.2366
0.1236
0.16

1
6.1
0.0103
1
1.525
1.5
0.1627

1
1
1
0.1
0.1

1
1.2
1.2366
0.1236
0.1
KOEFISIEN

1
1.9474
2.7
0.54
0.1189

53
44
0.07
0.07
1.415
0.06
3.2
1.015
0.1015
0.016

1.2
35
0.054
0.09
0.009
0.027

1.2
35
0.108
0.18
0.018
0.0054
KOEFISIEN

1.2
35
0.036
0.0706
0.0075
0.0043
KOEFISIEN

1.2
35
0.045
0.075
0.009
0.0025

1.2
0.081
0.1879
0.0189
0.007

1
0.0245
0.01
0.1
0.01
0.005
KOEFISIEN

0.185
0.138
0.17
0.273
0.0294
0.0847
0.089
0.0139
0.0051

0.293
0.0934
0.8924
0.0294
0.0539
0.0806
0.0129
0.0046

0.1154
0.092
0.26
0.0294
0.0362
0.063
0.0064
0.0064
KOEFISIEN

0.12
0.1839
0.0294
0.0361
0.042
0.0051
0.0037

0.123
0.0136
0.0227
0.0636
0.2
0.0204
0.0114

0.1
0.01
0.002
0.25
0.225
0.023
0.008