Time Period
(Ah)i 0.3375
For Underground Structures redution
factor as per IS 1893 6.4.4 1
(Ah)i 0.3375
(Ah)c 0.0378
For Underground Structures redution
factor as per IS 1893 6.4.4 1
(Ah)c 0.0378
Impulsive Pressure
qi 47.68 kN/m
ai 16.69 kN/m2
bi 2.38 kN/m2
2.38
16.69
Convective Pressure
qi 12.89 kN/m
ai 2.21 kN/m2
bi 2.95 kN/m2
2.95
2.95
STAAD
CALCULATIONS
2 Analysis
Diameter D 20 m
Breadth B 10 m
Height of Water h 5m
Freeboard 0.3 m
Spring Parameters
h/L 0.25
mi/m 0.288
mi 288000 kg
mc/m 0.695
mc 695000
hi/h 0.375
hi 1.875 m
hc/h 0.524
hc 2.62 m
hi*/h 1.61
hi* 8.05 m
hc*/h 2
hc* 10 m
Time Period
(Ah)i 0.3375
For Underground Structures redution
factor as per IS 1893 6.4.4 1
(Ah)i 0.3375
(Ah)c 0.0378
For Underground Structures redution
factor as per IS 1893 6.4.4 1
(Ah)c 0.0378
Impulsive Pressure
qi 47.68 kN/m
ai 16.69 kN/m2
bi 2.38 kN/m2
2.38
16.69
Convective Pressure
qi 12.89 kN/m
ai 2.21 kN/m2
bi 2.95 kN/m2
2.95
2.95
STAAD
CALCULATIONS