Sie sind auf Seite 1von 2

Sheet1

S1 = 1200 4 -PILE-GROUP

PILE SIZE ( dia.) = 400 mm. sq.


L/2
PILE WORKING LOAD ( WL ) = 1000 KN
Y
PILE SPACING
S1 = 1200 mm
S2 = 1200 mm
W/2 AS2
a= 600 mm
S2 = X W=
1200 b 1900 b= 600 mm

a fcu = 35 N/mm2

fy = 460 N/mm2
c=
350 AS1 use 20 mm dia. bar
e = 350
AS2 use 20 mm dia. bar
L = 1900
( D ) Minimum 900 mm
AS1 D use 1000 mm

Soffit of beam or slab

AS1
d D use
1000
COL

100 150

50 lean concrete
AS2 T13 - 250 Blinders
4 PILE - GROUP 400

MINIMUM DEPTH OF PILE CAP ( D)

IF dia. < 550mm than D = 2.dia. + 100 = 900 mm


IF dia. > 550mm than D = 1/3 ( 8.dia. - 600 ) = NA mm

L = ( S1 / dia. + 1 )dia. + 300 = 1900 mm

W = ( S2 / dia. + 1 )dia. + 300 = 1900 mm

d= 850 mm

FILE : 4PILEG
Sheet2

REYNOLD DESIGNER'S HANDBOOK - TRUSS SYSTEM


4-PILE-GROUP 0
ULTIMATE LOAD ( N ) = 4 x 1.5WL = 6000 KN

PARALLEL TO X - X AXIS

TENSILE FORCE BETWEEN PILE ( T )


T = N / 24.S1.d ( 3.S1.^2 - a^2 ) = 971 KN
AS1 minimum = 0.15%.2c.D = 1050 mm2
700 width AS1 required = T / 0.87.fy = 2425 mm2
OK - more than AS1 minimum
AS1 per metre = AS1 x 1000 / 2c = 3465 mm2/m
AS1 = T 20 at 91 mm

AS1 use T 20 at 150

PARALLEL TO Y - Y AXIS

TENSILE FORCE BETWEEN PILE ( T )


T = N / 24.S2.d ( 3.S2.^2 - b^2 ) = 971 KN
AS2 minimum = 0.15%.2e.D = 1050 mm2
700 width AS2 required = T / 0.87.fy = 2425 mm2
OK - more than AS1 minimum
AS2 per metre = AS2 x 1000 / 2e = 3465 mm2/m
AS2 = T 20 at 91 mm

AS2 use T 20 at 150

Punching shear stress = N / (2(a+b)).d = 2.94 N/mm2


OK - less than 4.73 N/mm2

X - X AXIS

Shear v = 2 x 1.5WL / L.d = 1.86 N/mm2


av = S2/2 - b/2 - dia/2 = dia/5 = 180 mm
100AS2/1000d = 0.41
vc = 0.52 N/mm2
Enchanced shear stress = vc.2.d / av = 4.95 N/mm2
shear check - OK

Y - Y AXIS

Shear v = 2 x 1.5WL / W.d = 1.86 N/mm2


av = S1/2 - a/2 - dia/2 = dia/5 = 180 mm
100AS1/1000d = 0.41
vc = 0.52 N/mm2
Enchanced shear stress = vc.2.d / av = 4.95 N/mm2
shear check - OK