RAPID P0014 5007 INC LST 6900 2072

PETRONAS RAPID PROJECT


PACKAGE 14 - UTILITIES, INTERCONNECTING,
OFFSITE UNITS
1 - REJECTED

Petronas
Do not proceed with anyTechnical
work definedServices
by the dataSdn. Bhd. EPCC
submitted. Revise and resubmit per Purchaser
comments consistent with the Purchase Order,
Level
unless 16, noted.
otherwise Menara DAYABUMI, Jalan Sultan Hishamudin,
50050 Kuala Lumpur, Malaysia.
Authorization to proceed does not relieve Contractor
/Supplier of its responsibility or liability under the
Contract and/or Purchase Order.

LIST OF COMPONENTS TO BE ERECTED/


INSTALLED ON SITE FOR 6900-CMH-921

3 - PROCEED
Authorization to proceed does not relieve Contractor
/Supplier of its responsibility or liability under the
Contract and/or Purchase Order.

(With Minor Comments)


OWNER Approval: PRPC Utilities and Facilities Sdn. Bhd.
Name:
Date (DD-MMM-YY):

Signature:
By Suet Mei Chew on Dec 19, 2017
Document Class: X

Pages modified under this revision: -

A 12-Dec-17 IFR – Issued for Review HSG NH RI


DATE WRITTEN BY CHECKED BY APPROVED BY
REV. STATUS – REVISION MEMO
(name & signature) (name & signature) (name & signature)
DD-MM-YY

Sections changed in last revision are identified by a vertical line in the right margin.

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-INC-LST-6900-2072.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 2 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

HOLD’s

HOLD No. REF. § DESCRIPTION ACTIONS

CONTRACTOR REF. NO.: 65A10282-09-0945-18-001_0


"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 3 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

Table of Contents
1. PURPOSE ......................................................................................................................................... 4
2. REFERENCE DOCUMENTS ............................................................................................................ 5
3. ACRONYM AND DEFINITIONS ....................................................................................................... 6
4. INTRODUCTION ............................................................................................................................... 7
5. LIST OF COMPONENTS TO BE ERECTED / INSTALLED AT SITE ........................................... 8
5.1 CANOPY ..................................................................................................................................8
5.2 GUTTER...................................................................................................................................9
5.3 GUTTER PIPE .........................................................................................................................9
5.4 HVAC UNIT ..............................................................................................................................9
5.5 AIR STACK ..............................................................................................................................9
5.6 SUPPLY AIR DUCTING ..........................................................................................................9
5.7 RETURN AIR DUCTING AND DAMPER ................................................................................9
5.8 CABLE TRAYS ........................................................................................................................10
5.9 INTERFACE CABLE (CABLE BETWEEN HVAC UNIT & CMH)............................................10
5.10 LIGHTNING ARRESTOR ........................................................................................................10
5.11 FIRE EXTINGUISHER .............................................................................................................10
5.12 STEEL WIRE SUPPORT FOR THE AIR STACK ...................................................................11
6. ATTACHMENT 1 ............................................................................................................................. 13

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 4 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

1. PURPOSE

PETRONAS intends to build a grass root integrated Refinery and Petrochemicals Complex by
developing the RAPID PROJECT (Refinery and Petrochemical Integrated Development) to
meet both domestic and Asia's energy and chemicals demand. The RAPID PROJECT consists
of a world scale integrated site which includes Refinery with a deep conversion scheme, 300
000 barrels per stream day capacity, Naphtha Steam Cracker of 1.28 million tons of ethylene
per year capacity; Petrochemical Derivative Units, utilities, off site and jetty installations.

The RAPID PROJECT is a fundamental component of the Pengerang Integrated Complex


(PIC) which also includes the following major projects Pengerang Cogeneration Plant (PCP), a
New LNG Regasification Terminal (RGT2), Raw Water Supply Project (PAMER),Pengerang
Deep Water Terminal (PDWT) and Air Separation Unit (ASU) which provides oxygen and
nitrogen gases to the Complex and to the local market.

The RAPID PROJECT is located at Pengerang, Mukim of Pengerang, Kota Tinggi District,
Johor and is in close proximity to the international shipping lane connecting the Straits of
Malacca, Singapore and the South China Sea

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 5 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

2. REFERENCE DOCUMENTS

General Arrangement Drawing: RAPID-P0014-5007-INC-DWG-6900-2002

Foundation Drawing: RAPID-P0014-5007-CVS-DWG-6900-2012

HVAC Control Panel General RAPID-P0014-5007-INC-DWG-6900-2122


Arrangement and Wiring Drawing

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 6 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

3. ACRONYM AND DEFINITIONS

OWNER : PRPC Utilities and Facilities Sdn. Bhd.

EPCM CONTRACTOR : OUI JV: Joint venture appointed by OWNER with specified
authority to perform the EPCM Services of the UIO Project.

CONTRACTOR : MPEI (Mechanical, Piping, Electrical and Instrument)


contractor engaged by the EPCM contractor to carry out works
at site.

PROJECT or UIO PROJECT EPCM of Utilities, Interconnecting and Offsite facilities (UIO)
Package 14 for RAPID PROJECT at Pengerang, Johor.

EPCM : Engineering, Procurement and Construction Management.

PACKAGE WORK : The works, services or supplies, or any or all of the foregoing,
to be undertaken by a PACKAGE CONTRACTOR or
PACKAGE VENDOR as applicable.
“SCOPE OF WORK” may also be used instead of “PACKAGE
WORK” to facilitate the understanding of all the parties.

PACKAGE : Refer to each package of works or supplies forming parts of


the PROJECT.

PACKAGE VENDOR : Refer to any vendor engaged by OWNER to supply equipment


and materials or spare parts, which may include associated
services.

PACKAGE CONTRACTOR : Refer to any contractor engaged by OWNER to undertake the


PACKAGE WORKS for a PACKAGE.

The acronyms used in this document have the meaning defined below:

HVAC Heating, Ventilation, and Air Conditioning


PIC Pengerang Integrated Complex
PCP Pengerang Cogeneration Plant
RGT2 Regastification Terminal 2
PAMER Raw Water Supply Project
PDWT Pengerang Deep Water Terminal
ASU Air Separation Unit
CMH Custody Metering House
GA General Arrangement

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 7 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

4. INTRODUCTION

The purpose of this document is to list loose supplied components to be erected/installed at


site for Custody Metering System (6900-CMH-921) for UIO by others to ensure all the loose
supplied components can be correlated for correct erection/installation.

The list covers the following parts of the loose supplied components for Custody Metering
House, 6900-CMH-921:
• HVAC unit, supply air ducting, return air ducting & fresh air stack.
• Canopy
• Drain Gutter Pipe
• Lightning Arrestors
• Fire Extinguisher
• HVAC Power & Signal Cables (Cables between HVAC unit and CMH)
• Cable Trays

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 8 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

5. LIST OF COMPONENTS TO BE ERECTED / INSTALLED AT SITE

6900-CMH-921 is constructed with dimensions 6.0 M (L) x 3.2 M (W) x 3.4 M (H). On the
external it has canopy, gutter, gutter pipe, cable trays, lights, HVAC unit panel, supply air
ducting, return air ducting and fresh air stack

The canopy, gutter, gutter pipe, HVAC unit, supply air ducting, return air ducting & fresh air
stack will be dismantled for transportation to RAPID, Pengerang site along with its bolts, nuts,
support brackets and sealants for the canopy as required.

Refer Attachment 1 for loose item Bill of Material for further details.

Figure 1: 6900-CMH-921

5.1 CANOPY

Each canopy has been labelled in accordance to the List & Drawing as in attachments for
reference. Contractor to check labels prior to installation the canopy to each respective section.
Contractor to refer Attachment 1, Figure 5 to 7 for the canopy layout prior to installation.

Contractor to apply adhesive/sealant supplied by CMH vendor on gasket face so it sticks to the
mating canopy and ensure no leakage during raining.

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 9 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

5.2 GUTTER

Each section of the canopy or CMH has its own designated rain gutter. Contractor to refer
Attachment 1, Figure 8 to 10 for the gutter prior to installation.

Contractor to install rain gutter with the support brackets come with bolts and nuts.

5.3 GUTTER PIPE

Each Rain Gutter comes with Gutter Pipe to drain the rain water to OUIJV drain pipe connected
to the drain system. Contractor to refer Attachment 1, Figure 11 to 14 for the gutter pipe prior to
installation.
Contractor to install gutter pipe with support brackets come with bolts and nuts.
5.4 HVAC UNIT

Contractor to install HVAC UNIT & Air Stack on a flat surface concrete for proper alignment
and then followed by Return Air & Supply Air Ducting come with bolts & nuts.

Contractor to refer Foundation Layout and Loading Plan for 6900-CMH-921, RAPID-P0014-
5007-CVS-DWG-6900-2012 & Attachment 1, Figure 15 for the HVAC Unit prior to installation.

5.5 AIR STACK


used
Contractor to install the Air Stack on flat surface by bolting the Air Stack mounting base plate to
the ground with anchor bolt by others and erect the Air stack vertically. The steel wire support
is use to anchor the Air Stack after final alignment. Contractor to refer Attachment 1, Figure 16
& 17 and section 5.12 for the air stack prior to installation.

5.6 SUPPLY AIR DUCTING

The supply air ducting will distribute the cooled air from HVAC to CMH. Contractor to install /
tight in the supply air ducting by bolt and nut between the CMH, ducting and HVAC. Contractor
to refer Attachment 1, Figure 18 for the supply air ducting prior to installation.
Contractor to refer List & Drawing for designated items prior to installation.
5.7 RETURN AIR DUCTING AND DAMPER

The return air ducting will distribute the hot air from CMH to the air stack through damper.
Contractor to install / tight in the return air ducting and five (5) pieces of damper by bolt and
nut. Contractor to check labels prior to installation of the return air ducting and the damper to
each respective section. Contractor to refer attachment 1, Figure 19 & 20 for the return air
ducting and damper prior to installation.

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 10 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

5.8 CABLE TRAYS There is no Section B


for 6900-CMH-921.
The Cable Trays for the interface cable is supplied loose as the cable trays need to be pre-
setup at site before termination of the interface cable been take place. Contractor needs to
pre-setup the cable trays to support the interface cable by suit at site from the CMH to HVAC
termination at Section B. Contractor to refer Attachment 1, Figure 21 & 22 for the cable trays
prior to installation.
Kindly identify by number which is for Power and which is for Signal.
5.9 INTERFACE CABLE (CABLE BETWEEN HVAC UNIT & CMH)

The interface cable between HVAC Unit and CMH function as connecting the signal and power
to both HVAC and CMH. The cable is temporarily been disconnected from HVAC and rolled at
CMH Section B wall as per illustrated in Attachment 1, Figure 23. Contractor need to lay the
interface cable on the cable trays and do the termination on the HVAC. The minimum distance
for Signal and Power Cable shall be 300mm.
For termination, refer to HVAC Control Panel GA & Wiring Drawing for 6900-CMH-921, RAPID-P0014-5007-INC-DWG-6900-2122.
5.10 LIGHTNING ARRESTOR

The 6900-CMH-921 package comes together with two (2) unit typical lightning arrestor 15mm
in diameter x 2m long for the lightning strike prevention plan. The lightning arrestor come with
male threaded and the female threaded located at top of Air Stack and CMH. Contractor need
to install the lightning arrestor on the Air Stack before the air stack been erected vertically.
Contractor to refer Attachment 1, Figure 24 for the lightning arrestor prior to installation.

There is no Section B
5.11 FIRE EXTINGUISHER for 6900-CMH-921.
The 6900-CMH-921 package come together with four (2) unit 5kg Portable CO2 extinguisher
been supplied as loose component (External Fire Extinguisher). The fire extinguisher’s
designated bracket is mounted on the CMH external wall at Section B. Contractor required to
install the loose supplied fire extinguisher on the dedicated location by referring the Attachment
1, Figure 25.

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 11 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

5.12 STEEL WIRE SUPPORT FOR THE AIR STACK

The 6900-CMH-921 is provided with the steel wire support been provided as loose components
as per Figure 26 in Attachment 1. Contractor required to install the steel wire support to the 4
holes M10 tie guide wire provided on the air stack as per details configuration in Figure 2 to 4
and GA Drawing for 6900-CMH-921, RAPID-P0014-5007-INC-DWG-6900-2002.

Steel Wire
Support

Figure 2 : Isometric view

M10 Holes at Air


Stack Flanges

Figure 3 : Top View


"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 12 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

Figure 4 : Front View

Support on the ground shall be provided by OUI JV at Site. Guide wire with holder
shall be provided by PACKAGE VENDOR. Suitable xxx on the ground to match the
guide wire holder shall be supplied and installed by OUI JV.

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
Document Number
Rev. Page
Doc.
Project Package Originator Discipline Unit n° Serial n°
Type
A 13 / 34
RAPID P0014 5007 INC LST 6900 2072

LIST OF COMPONENTS TO BE
ERECTED/INSTALLED ON SITE
FOR 6900-CMH-921

6. ATTACHMENT 1

"In accordance with Article 38 of the UIO EPCM Contract, the ownership in this document shall vest in OWNER. No part of this document may be reproduced, stored in a
retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the OWNER.
CONFIDENTIAL – Not to disclose without authorization”
Electronic Filename: RAPID-P0014-5007-LST-SPN-6900-2072_A.docx
BUILT OF MATERIALS (BOM)
6900-CMH-921

ITEM DESCRIPTION LOCATION Tag Piecemark Figure No. QTY REMARKS


SECTION A c/w Bolts & Nuts A1 to A6 A1, A2, A3, A4, A5, A6 5,6 & 7 6 Sets
SECTION B c/w Bolts & Nuts B1 to B4 B1, B2, B3, B4 5,6 & 7 4 Sets
1 CANOPY
SECTION C c/w Bolts & Nuts C1 to C6 C1, C2, C3, C4, C5,C6 5,6 & 7 6 Sets
SECTION D c/w Bolts & Nuts D1 to D4 D1, D2, D3, D4 5,6 & 7 4 Sets
SECTION A G-A - 8,9 & 10 1 Pcs
SECTION B G-B - 8,9 & 10 1 Pcs
2 GUTTER
SECTION C G-C - 8,9 & 10 1 Pcs
SECTION D G-D - 8,9 & 10 1 Pcs
SECTION A & B GP-A/B GP-AB1, GP-AB2 11,12,13 & 14 2 Pcs
3 GUTTER PIPE
SECTION C & D GP-C/D GP-CD1, GP-CD2 11,12,13 & 14 2 Pcs
4 HVAC HVAC UNIT - - 15 1 Lot
5 AIR STACK Fresh Air Stack c/w Bolts & Nuts, Base AS - 16 & 17 1 Set
6 SUPPLY AIR DUCTING SUPPLY AIR Ducting c/w Bolts & Nuts SA SA-1 18 1 Pcs
RETURN AIR DUCTING RETURN AIR Ducting c/w Bolts & Nuts RA RA-1 1 Pcs
7
& DAMPING DAMPING c/w Bolts & Nuts DM DM1, DM2,DM3, DM4, DM5 19 & 20 5 Pcs
8 CABLE TRAYS SECTION B - - 21 & 22 3 Set
Cable between HVAC Unit
9 INTERFACE CABLE SECTION B 1 Set
- - 23 & CMH.
10 LIGHTNING ARRESTOR On Top of Air Stack and CMH Section B LA - 24 2 Pcs
11 FIRE EXTINGUISHER SECTION C FE FE2-003, FE2-004 25 2 Pcs 5kg CO2 Fire Extinguisher
12 STEEL WIRE SUPPORT SECTION B - - 26 2 Pcs For the Air Stack anchor.

Table 1: Loose Item BOM for HVAC Unit 6900-CMH-921

PETRONAS RAPID PROJECT


CANOPY
6900-CMH-921

C3 C4 C5

Figure 5: Canopy as installed on 6900-CMH-921

PETRONAS RAPID PROJECT


CANOPY
6900-CMH-921

Figure 6: Dismantled Canopy

PETRONAS RAPID PROJECT


CANOPY
6900-CMH-921

SECTION A

SECTION B
SECTION D

SECTION C

Figure 7: Canopy Layout

PETRONAS RAPID PROJECT


GUTTER
6900-CMH-921

Figure 8: Gutter as installed on Canopy of 6900-CMH-120

PETRONAS RAPID PROJECT


GUTTER
6900-CMH-921

Figure 9: Gutter dismantled for 6900-CMH-120

PETRONAS RAPID PROJECT


GUTTER
6900-CMH-921

SECTION A
G-A

G-D

G-B
SECTION D

SECTION B

G-C
SECTION C

Figure 10: GUTTER Layout

PETRONAS RAPID PROJECT


GUTTER PIPE
6900-CMH-921

GP-AB1 GP-AB2

Figure 11: Gutter Pipe (Tag GP-A/B) as installed of 6900-CMH-921

GP-CD2 GP-CD1

Figure 12 : Gutter Pipe (Tag GP-C/D) configuration of 6900-CMH-921

PETRONAS RAPID PROJECT


GUTTER PIPE
6900-CMH-921

GP-1B

GP-1A
GP-2B

GP-2A

Figure 13: Gutter Pipe dismantled for 6900-CMH-921

PETRONAS RAPID PROJECT


GUTTER PIPE
6900-CMH-921

SECTION A GP-AB2

GP-AB1

SECTION D
SECTION B

GP-CD2
SECTION C

GP-CD1

Figure 14: Gutter Pipe Layout for 6900-CMH-921

PETRONAS RAPID PROJECT


HVAC UNIT
6900-CMH-921

HVAC
UNIT

Figure 15: HVAC Unit for 6900-CMH-921

PETRONAS RAPID PROJECT


AIR STACK
6900-CMH-921

AIR
STACK

Figure 16: Air Stack as dismantled for 6900-CMH-921


for 6900-CMH-120

PETRONAS RAPID PROJECT


AIR STACK
6900-CMH-921

Figure 17: Air Stack set for 6900-CMH-921 packing for shipment.

PETRONAS RAPID PROJECT


SUPPLY AIR DUCTING
6900-CMH-921

SUPPLY AIR
(Ducting)
SA-1

Figure 18: Supply Air Ducting as installed on HVAC Unit for 6900-CMH-921

PETRONAS RAPID PROJECT


RETURN AIR DUCTING AND DAMPER
6900-CMH-921

RA-1

DM-2 DM-3
RETURN AIR
(Ducting)
DAMPER
DM-1

Figure 19: Return Air Ducting & Damper as installed on HVAC Unit for 6900-CMH-921

PETRONAS RAPID PROJECT


RETURN AIR DUCTING AND DAMPER
6900-CMH-921

DM-5
DM-4

DAMPER

Figure 20: Damper as Installed from HVAC Unit for 6900-CMH-921

PETRONAS RAPID PROJECT


CABLE TRAY
6900-CMH-921

CABLE
TRAY

Figure 21: Cable Tray as installed for 6900-CMH-921

CABLE
TRAY

Figure 22: Cable Tray as illustrated in drawing


for 6900-CMH-921

PETRONAS RAPID PROJECT


INTERFACE CABLE ( BETWEEN HVAC CMH)
6900-CMH-921

ITERFACE
CABLE

INTERFACE

Figure 23: Interface cable between the HVAC Unit To the CMH as
dismantled for 6900-CMH-921

PETRONAS RAPID PROJECT


LIGHTNING ARRESTOR
6900-CMH-921

Lightning
Arrestor

Figure 24: Lightning Arrestor as installed on top of


the 6900-CMH-921 roof

PETRONAS RAPID PROJECT


FIRE EXTINGUISHER
6900-CMH-921

External Fire
Extinguisher

Figure 25: 6900-CMH-921 external Fire Extinguisher temporary


secured in CMH for transportation

PETRONAS RAPID PROJECT


STEEL WIRE SUPPORT
6900-CMH-921

Steel Wire
Support

Figure 26: Steel Wire Support with accessories


for 6900-CMH-921