Asset under Construction through

MM
created by Snehashis Paul on 01-Aug-2016 10:00, last modified by Snehashis Paul on 02-Aug-2016 09:11
Version 1
inShare2

What is AUC?

AUC is Asset under construction where some assets are in construction phase and cost needs to capture through internal
order for the time being. Once asset is fully completed then cost would be transferred to another cost object (E.g. Cost
center) and settle with final asset.

Process of AUC

1. Create IO as well as AUC in KO01

Create IO:

Assignment Tab:

Assign Profit Center

Control Data Tab:

In this section System status should be in Release stage "REL"


Investments Tab:

Assign Investment Profile in this section: select ZIP001 & click enter or goto extra & select AUC

Create AUC through IO. Go to Extras-Asset under construction


Create AUC:

General Tab:

In this section put capitalization date and text

Time Dependent Tab:

In this section assign IO


Depreciation Tab:

In this section Depreciation Key needs to be assigned.

Note- Depreciation key is "0000", as depreciation is not calculating in AUC.


9. Create PO with Account assignment "F" (Order) in ME21N

12. Create Main Asset master in AS01 where AUC will be settled or assign to existing asset

Create Main Asset master with Cost Center.

General Tab:

In this section put Asset description and Capitalization Date


Time Dependent Tab:

In this section select Cost center

Depreciation Area Tab:

In this section select Depreciation Key, Useful life and Depreciation Start date
13. Settlement with AUC in KO88

Here IO will be settled with AUC. Put IO and select Processing type Automatic. Before Final Run always
perform a Test Run which will show if there is any Error.

Go to Settlement Rule and Add AUC because IO will be settled with AUC.
Add AUC in Settlement Rule

Go back to the main screen to perform the Test Run as well as Final Run
14. Settlement with Fixed Asset in KO88

Here AUC will be settled with Fixed Asset.

Fill up the necessary details and select processing type Full Settlement

Go to Settlement Rule and Add Fixed Asset because AUC will be settled with FA.

Add FA in Settlement Rule


Go back to the main screen to perform the Test Run as well as Final Run

15. Check the AUC and FA in AW01N

AUC
Settlement journal entry can be seen here.

Fixed Asset

Settlement journal entry can be seen here.


Now Depreciation needs to perform on FA.

Journal entries:

Material Purchase through IO

Material Transfer to Asset Dr.


GR/IR Cr.

Invoice Posting

GR/IR Dr.
Vendor Cr.

Settlement with AUC

AUC Dr.
Material Transfer to Asset Cr.(IO)

Settlement with FA

FA Dr.
AUC Cr.

Note- AUC of Investment Measure is Integration with 4 modules FI-CO-MM-IM.