Sie sind auf Seite 1von 16

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Balance work of Four Laning of NAGPUR - HYDERABAD Section of NH-7 From Km:153+000 to Km:175+000
in the State of Maharashtra,Contract Package NS-62(Bal).

Client National Highways Authority of India

Consultant BCEOM-AARVEE (JV)

Contractor M/s Prasad - MKS Constro (JV)

AGGREGATE IMPACT VALUE


(IS 2386, Part-4)

Source of Material : Wasri Stone Quarry Date of Sampling 17.04.2014

Detailed Location : CH- 169+350 RHS Date of Testing 21.04.2014

Sample Description: 12.5mm Passing & 10mm Retained Sampled By Jointly

Description/Trail No: Trial-1 Trial-2

(a) Weight of Aggregate Before Testing (gm) 372.0 369.0

(b) Weight of Aggregate Retained on 2.36mm sieve (gm) 316.0 311.0

(c) Weight of Aggregate passing on 2.36mm sieve (gm) 56.0 58.0

Aggregate Impact Value (%) c/a * 100 15.1 15.7

Average AIV (%) 15.4

Specified limit-30% Max

Remarks: ……………………………………………………………………………...

Contractor's Representative Consultants's Representative

Lab Tech/QCE Lab Tech/QCE

Material Engineer Material Engineer


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Balance work of Four Laning of NAGPUR - HYDERABAD Section of NH-7 From Km:153+000 to Km:175+000
in the State of Maharashtra,Contract Package NS-62(Bal).

Client National Highways Authority of India

Consultant BCEOM-AARVEE (JV)

Contractor M/s Prasad - MKS Constro (JV)

AGGREGATE IMPACT VALUE


(IS 2386, Part-4)

Source of Material : Wasri Stone Quarry Date of Sampling 17.04.2014

Detailed Location : CH- 169+350 RHS Date of Testing 21.04.2014

Sample Description: 12.5mm Passing & 10mm Retained Sampled By Jointly

Description/Trail No: Trial-1 Trial-2

(a) Weight of Aggregate Before Testing (gm) 360.0 366.0

(b) Weight of Aggregate Retained on 2.36mm sieve (gm) 304.0 307.0

(c) Weight of Aggregate passing on 2.36mm sieve (gm) 56.0 59.0

Aggregate Impact Value (%) c/a * 100 15.6 16.1

Average AIV (%) 15.8

Specified limit-30% Max

Remarks: ……………………………………………………………………………...

Contractor's Representative Consultants's Representative

Lab Tech/QCE Lab Tech/QCE

Material Engineer Material Engineer


NATIONAL HIGHWAYS AUTHORITY OF IN
Balance work of Four Laning of NAGPUR - HYDERABAD Section of NH-7 From Km:153+000 to Km:175+000 in the
Contract Package NS-62(Bal)

Client National Highways Authority of India

Consultant BCEOM-AARVEE (JV)

Contractor M/s Prasad - MKS constro (JV)

LOS ANGELES ABRASION VALUE


AS PER IS : 2386 (PART- IV)

Location/Chainage CH-169+350 RHS Date of Sampling

Source of Material Wasri Stone Quarry Date of Testing

Type of Materal 12-5mm aggregate Sampled By

Proposed Use SDBC Grade-2 Tested By

Passing 80mm 63mm 50mm 40mm 25mm 20mm 12.5mm


Gradation
Retained 63mm 50mm 40mm 25mm 20mm 12.5mm 10mm

Designatiom/No. of Balls E/12 A/12

Weight in gms 2500 2500 5000 1250 1250 1250 1250

Designatiom/No. of Balls F/12 B/11

Weight in gms 5000 5000 2500 2500

Designatiom/No. of Balls G/12

Weight in gms 5000 5000

Sr. No. Description Sample No. - 1 Sample No. - 2

A Designation C/8 C/8

B Revolutions (30 to 33 r.p.m.) 500 500

C Number of Balls 8 8

D Total Weight of Sample in gms 5000.0 5000.0

E Weight of Sample Retained on 1.7mm Sieve in gms 4137.0 4171.0

F Weight of Sample Passing Through 1.7mm Sieve in gms 863.0 829.0

G Abrasion (F/D) x 100 in % 17.3 16.6


H Average Abrasion in % 17.0

Specified limit - 40% Max

Remarks :

Contractor's Representative Consultant's Representativ

Lab Tech/QCE Lab Tech/QCE

Material Engineer Material Engineer


AYS AUTHORITY OF INDIA
ction of NH-7 From Km:153+000 to Km:175+000 in the State of Maharashtra
act Package NS-62(Bal)

of India

LES ABRASION VALUE


R IS : 2386 (PART- IV)

17.04.2014

21.04.2014

Jointly

Jointly

10mm 6.3mm 4.75mm

6.3mm 4.75mm 2.36mm

C/8 D/6

2500 2500 5000

Sample No. - 2 Sample No. - 3

C/8 C/8

500 500

8 8

5000.0 5000.0

4171.0 4144.0

829.0 856.0

16.6 17.1
17.0

Consultant's Representative
NATIONAL HIGHWAYS AUTHORITY OF INDIA
Balance work of Four Laning of NAGPUR - HYDERABAD Section of NH-7 From Km:153+000 to Km:175+000
Maharashtra,Contract Package NS-62(Bal).

Client National Highways Authority of India

Consultant BCEOM-AARVEE (JV)

Contractor M/s Prasad - MKS Constro (JV)

FLAKINESS & ELONGATION INDEX


(IS 2386, Part-1)

Source of Material : Wasri Stone Quarry Date of Sampling : 17.04.2014

Sopurce Location : CH- 169+350 RHS Date of Testing : 22.04.2014

Sample Description : 12-5mm aggregate Tested By : Jointly

Sieve Size (mm) Flakiness Guage


Total Weight of
Aggregate (gms)
Passing Retained
Passing Retained A (gm) (gm)
B C

63 50 - - -

50 40 - - -
40 31.5 - - -

31.5 25 - - -

25 20 - - -

20 16 - - -

16 12.5 - - -

12.5 10 456 56 400


10 6.3 236 34 202

TOTAL 692 90 602

Flakiness Index = (B/A) X 100 = 13.0%


Elongation Index = (D/C) X 100 = 14.5%
Combined Flakiness & Elongation Index = 27.5% Specified L

REMARKS :-…………………………………………………………………………………………
Contractor's Representative Consultants's Representative

Lab Tech/QCE Lab Tech/QCE

Material Engineer Material Engineer


WAYS AUTHORITY OF INDIA
BAD Section of NH-7 From Km:153+000 to Km:175+000 in the State of

of India

(IS 2386, Part-1)

Date of Sampling : 17.04.2014

Date of Testing : 22.04.2014

Weight Retained on
Elongation Guage
(gm)
D

-
-

55
32

87

Specified Limit:- 30% Max.


Consultants's Representative
NATIONAL HIGHWAYS AUTHORITY OF
Balance work of Four Laning of NAGPUR - HYDERABAD Section of NH-7 From Km:153+0
Maharashtra,Contract Package NS-62(Bal).

Client National Highways Authority of India

Consultant BCEOM-AARVEE (JV)

Contractor M/s Prasad - MKS Constro (JV)

ATTERBERG'S LIMIT

Source of Material : Wasri Stone Quarry / CH- 169+350 RHS Sampling Date :

Sample Description : 5mm & down Testing Date :

Sampled By : Jointly Tested By :

LIQUID LIMIT
Description
1 2

Penetration in mm : 15 18

Container No. : 10 15

Wt. Of container gms : W1 12.10 12.10

Wt. Of container+ wet soil gms : W2 35.26 36.01

Wt. Of container+ dry soil gms : W3 31.79 32.24

Wt. Of water gms : M=W2-W3 3.47 3.77

Wt. Of dry soil gms : D=W3-W1 19.69 20.14

Moisture Content % : M/Dx100 17.6 18.7

Liquid Limit At 20mm 23


19.2%
Penetration
Moisture %

22

Plastic Limit N.A. 21


LL - 19.2%
20

Plasticity Index N.P. 19


23

Moisture %
22

21

20

Plasticity Index N.P. 19

18

17

16
12 14 16 18 20

Penetration in (

Contractor's Representative Consultants's Repr

Lab Tech/QCE Lab Tech/QCE

Material Engineer Material Engineer


WAYS AUTHORITY OF INDIA
AD Section of NH-7 From Km:153+000 to Km:175+000 in the State of

ndia

(IS: 2720, Part 5)

Sampling Date : 17.04.2014

Testing Date : 23.04.2014

Tested By : Jointly

LIQUID LIMIT PLASTIC LIMIT


3 4 1 2

21 25

7 1

9.75 9.93 0.0

32.41 30.85 N.A.

28.71 27.25

3.70 3.60

18.96 17.32

19.5 20.8
14 16 18 20 22 24 26 28 30

Penetration in (mm)

Consultants's Representative

Lab Tech/QCE

Material Engineer

Das könnte Ihnen auch gefallen