OPERATIONAL REVIEW TEAM
(ORT) MEETING of KTPS V&VI Stages
for the month of APRIL’ 2019
On 28.05.2019
KTPS V & VI STAGES PERFORMANCE AT A GLANCE
2019-20
Sl. Parameter 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 (up to
No
April’ 19)
1 Generation 7799.06 7018.26 7329.16 6635.81 658.112 7130.20 7543.65 683.994
(MU)
2 PLF (%) 89.03 80.117 83.67 75.54 75.22 81.40 86.11 95.00
3 Sp. Oil cons. 1.22 0.719 0.742 0.952 0.768 1.118 0.826 0.288
4 Sp. coal cons. 0.719 0.776 0.727 0.708 0.747 0.739 0.723 0.690
5 % APC 7.020 7.501 7.325 7.948 7.845 7.761 7.645 7.33
6 Heat Rate 2436 2403 2273 2287 2314 2323 2326 2300
% DM Water
7
consumption
2.01 1.186 0.903 1.048 0.971 0.856 0.940 0.72
8 No of trips. 54 54 25 42 42 34 39 03
COST OF GENERATION FOR THE MONTH OF MARCH’ 2019
(Including Headquarter Charges) for the month of March’ 2019
Fixed Cost consists of Cost of O&M and R&M (Repairs & Maintenance), Employees, Depreciation,
Interest & Finance, Adm & Gen Expenses, Operating Expenses; Variable Cost consists of Cost of Coal,
oil & water.
Generation Allowance linked to performance parameters for the employees of KTPS V & VI stages for
the month of April’ 2019 is 5.00%
MERIT ORDER COMPARISION OF TSGENCO UNITS
Current Variable Total Previous Variable Fixed Total
Fixed Cost
Station MOD Cost Cost MOD Cost Cost Cost
(Rs/Kwh)
Position (Rs/Kwh) (Rs/Kwh) Position (Rs/Kwh) (Rs/Kwh) (Rs/Kwh)
Certificate of Customer Satisfaction from TSTRANSCO is obtained till 31st March’ 2019
MONTHLY PERFORMANCE OF KTPS V & VI STAGES FOR FY 2019-20
Generation PLF Sp. Coal Sp. Oil W.Avg Heat % DM No. of
Month
(MU) (%) Cons. (kg/Kwh) cons.(ml/Kwh) GCV (Kcal/Kg) Rate Water Cons. Trips
FY 2019-20 FY 2018-19
DESCRIPTION Comparison
(30 DAYS) (30 DAYS)
Generation (MU) 683.994 622.258 ▲(increased)
PLF(%) 95.0 86.42 ▲(increased)
% Availability 98.01 88.08 ▲(increased)
Sp. Coal Consumption.(kg/kwh) 0.690 0.715 ▼(decreased)
Sp. Oil Consumption (ml/kwh) 0.288 0.789 ▼(decreased)
% DM Water Consumption(%) 0.720 0.875 ▼(decreased)
Gross Heat rate (kcal/ kwh) 2300 2265 ▲(increased)
Net Heat Rate (kcal/ kwh) 2482 2456 ▲(increased)
% Aux Power Consumption 7.33 7.770 ▼(decreased)
No. Of Outages 03 03 ---
The Generation increased by 61.736 MU during the FY 2019-20 when compared to FY 2018-19
REASONS FOR PARTIAL LOADING COMPARED WITH PREVIOUS FY UP TO APRIL’ 19
Sl. In MU In %
Description
No April’ 19 March’19 April’ 19 March’ 19
1 Units generated 672.960 673.338 --- ---
2 Units sent out 623.763 621.501 --- ---
Auxiliary Power
3 consumption
49.196 51.836 7.31 7.69
i) Coal handling plant 0.978 0.898 0.145 0.133
ii) Ash handling plant 1.287 1.522 0.191 0.226
Unit Wise % APC for the Month of April’19
Unit Design % APC %APC
Unit IX 9.0 10.395
Unit X 9.0 9.368
Unit XI 4.5 5.264
KTPS VI STAGE : PAT-III CYCLE
The Perform Achieve Trade (PAT) Cycle – III (2017-20) assessment year
for KTPS VI Stage commenced from 1st April 2019.
Energy consumption norms & standards in Kcal/Kwh of net electricity
produced for the target year 2019-20 for KTPS VI Stage is 2322.37 Kcal/Kwh
A Net Heat Rate (NHR) target deviation of about 36.86 Kcal/kwh has been
observed during the assessment year 2019-20 up to April’ 2019.
UNIT OUTAGES DURING THE MONTH OF APRIL’ 2019
Unit –X Outages of KTPS V Stage for the month of April’ 2019 (in Chronological order)
Unit Outage on 07.04.2019: (Boiler tripped on "Reheater Protection Operated"
(mal operation of Vacuum breaker due to spurious signals from IPB-II to PROCONTROL DCS of CCA-02 )
At 16:28 hrs., Turbine tripped on "Condenser Vacuum Low" and immediately Boiler
tripped on " Reheater Protection Operated" as HP bypass couldn't open due to low
condenser vacuum. Cyclic variation in condenser vacuum and flickering of fault LEDs
on turbine BTG panel were perceived. On keen observation, it was concluded that
Condenser vacuum breaker is being operated Open & Close continually which wasn't
realized earlier. Spurious signals generated in IPB-II resulted in faulty operation of
condenser vacuum breaker. Fault has been identified in IPB-II FV60 of Bus traffic
director. Faulty card XV7718 in FV60 was replaced.
UNIT - 10 START UP
S.No PARAMETERS DATE TIME
1 Outage Reason Spurious signals from DCS system
As per
2 Unit X Hot Start Up
3 Date 07.04.2019 Actual Curve ( HP
Casing ≈ 350 °C)
4 Type of Start Hot ( HP Casing: 490°C)
5 Trip date & Time 07.04.2019 16:28 hrs.
6 Light up time 07.04.2019 21:06 hrs.
7 Condenser Vacuum Pulling Start Time 07.04.2019 --
8 HP bypass Charging 07.04.2019
21:15 hrs. 71 Mins 120 Mins
9 LPBP charging 07.04.2019
10 Coal firing started (Ele.-D taken in to service) 07.04.2019 21:44 hrs.
11 Turbine Latch Start Time 07.04.2019 22:17 hrs.
12 Turbine Rolled to 600rpm 07.04.2019 23:06 hrs.
13 Turbine rolled to 3000rpm 07.04.2019 23:20 hrs. 17 Mins 10 Mins
14 M/C Synchronisation Time 07.04.2019 23:23 hrs.
15 Oil gun removal time (180 MW) ( with 04 elevations) 07.04.2019 23:58 hrs. 35 Mins 80 Mins
HFO : 15.694 KL
16 Total Oil Consumption (KL) 172 Mins 225 Mins
LDO : 03.33 KL
UNIT OUTAGES DURING THE MONTH OF APRIL’ 2019
Unit –X Outages of KTPS V Stage for the month of April’ 2019 (in Chronological order)
Unit Outage on 23.04.2019: Boiler tripped on "Both ID Fans OFF" & Turbine tripped on "
Mechanical over speed protection operated". (Budidampadu -I & II feeders tripped on distance relay protection)
The maximum Ex-Bus load at KTPS V Stage is 456 MW. The out going feeders
Budidampadu- I & II, Seetharampatnam- I & II, Tie-Line-I & II & Phase shifting
transformer have a maximum load evacuation capacity of 395 MW, 100 MW, 200 MW & 270
MW respectively. At 15:25 hrs. Budidampadu-II tripped on distance relay protection and
suddenly at 16:06 hrs., Budidampadu-I also tripped on distance relay protection.
Immediately "Generator unbalance relay 46A operated" alarm flashed on BTG panel and
Generator circuit breaker opened , however, the reasons for GCB opening were unclear as no
significant alarms or relay pick ups are observed in Generator transformer protection panels.
Turbine tripped on " Mechanical over speed ( 3250 rpm) operated "and Boiler tripped on "
Both ID Fans OFF" due to snag in extending station supply to unit auxiliaries. Soon after
opening of Generator Circuit Breaker (GCB), Station supply is supposed to extend to Unit
auxiliaries i.e., from SA board to US-10A(T) and SB board to US-10B(B). However, due to
some circuitry complications, Station supply to Unit auxiliaries couldn't extend and Boiler
tripped on " Both ID fans OFF"
UNIT - 10 START UP
S.No PARAMETERS DATE TIME
1 Outage Reason Spurious signals from DCS system As per
2 Unit X Hot Start Up
Actual Curve ( with
3 Date 23.04.2019 certain pre
conditions)
4 Type of Start Hot ( HP Casing: 505°C)
5 Trip date & Time 23.04.2019 16:28 hrs.
6 Light up time 23.04.2019 16:46 hrs.
7 Condenser Vacuum Pulling Start Time 23.04.2019 ---
8 HP bypass Charging 23.04.2019
--- 76 Mins 30 Mins
9 LPBP charging 23.04.2019
10 Coal firing started (Ele.-D taken in to service) 23.04.2019 17:18 hrs.
11 Turbine Latch Start Time 23.04.2019 18:02 hrs.
12 Turbine Rolled to 600rpm 23.04.2019 18:05 hrs.
13 Turbine rolled to 3000rpm 23.04.2019 18:20 hrs. 21 Mins 05 Mins
14 M/C Synchronisation Time 23.04.2019 18:26 hrs.
15 Oil gun removal time (180 MW) ( with 04 elevations) 23.04.2019 18:56 hrs. 30 Mins 20 Mins
HFO : 18.832 KL
16 Total Oil Consumption (KL) 130 Mins 70 Mins
LDO : --- KL
UNIT OUTAGES DURING THE MONTH OF APRIL’ 2019
Unit –X Outages of KTPS V Stage for the month of April’ 2019 (in Chronological order)
Unit Outage on 28.04.2019: (Boiler tube leak at Economiser Zone"
'On confirming tube leak at Economiser Zone, Load gradually reduced duly taking oil
support in CD elevation by tripping AB & CD mills. It is planned to trip the boiler on
" Loss of All Fuel " in order to examine Unit protections during planned shutdowns.
At 30 MW load, Turbine hand tripped at 06:55 hrs. duly ensuing opening of HP bypass
>2% followed by cutting off oil guns in CD elevation and Boiler tripped on "Loss of
all Fuel“
The primary cause of tube leak is at 37 mtr. elevation Economiser lower bank Coil No
1, Tube No.14 tube bend got fish mouth open due to flue gas erosion. After completing
rectification works, Hydrostatic test conducted at 190 Kg/cm2 drum pressure and
found one leak at Economizer Upper bank coil No 157 Tube No 17 got Pin hole in weld
joint.
UNIT - 10 START UP
S.No PARAMETERS DATE TIME
1 Outage Reason BTL ( Economiser Zone)
As per
2 Unit X Hot Start Up
3 Date 28.04.2019 Actual Curve ( HP
Casing ≈ 350 °C)
4 Type of Start Hot ( HP Casing: 370°C)
5 Trip date & Time 28.04.2019 06:55 hrs.
6 Light up time 29.04.2019 13:43 hrs.
7 Condenser Vacuum Pulling Start Time 29.04.2019 14:43 hrs.
8 HP bypass Charging 29.04.2019
15:18 hrs. 131 Mins 120 Mins
9 LPBP charging 29.04.2019
10 Coal firing started (Ele.-D taken in to service) 29.04.2019 15:39 hrs.
11 Turbine Latch Start Time 29.04.2019 15:54 hrs.
12 Turbine Rolled to 600rpm 29.04.2019 16:06 hrs.
13 Turbine rolled to 3000rpm 29.04.2019 16:31 hrs. 29 Mins 10 Mins
14 M/C Synchronisation Time 29.04.2019 16:35 hrs.
15 Oil gun removal time (180 MW) ( with 04 elevations) 29.04.2019 17:30 hrs. 55 Mins 80 Mins
HFO : 21.97 KL
16 Total Oil Consumption (KL) 227 Mins 225 Mins
LDO : 07.49 KL
DIVISION WISE BREAK UP OF UNIT TRIPS FOR THE FY 2019-20
Division UNIT-IX UNIT-X UNIT XI V&VI
Unit IX Unit X
Availability (%) 100 100
Loading (TPH) 96.14 94.79
Avg. Energy level (MW) 1.42 1.42
GRINDING MEDIA CONSUMPTION FOR THE FY 2019-20 (IN MTs)
Grinding media
Running Energy consumption in
UNIT MILL consumption in grams /
hrs Kwh. / ton of coal
ton of coal
Activity / Mill A B C D E F G
06.01.19 05.09.17 15.12.17 17.01.18 11.01.18 02.04.17 12.01.18
O/H date to to to to to to to
07.01.19 10.09.17 21.12.17 20.01.18 14.01.18 06.04.17 25.03.18
Running Hours 720 718 700 707 685 632 34
Due for O/H April’20 Mar’19 June’19 Aug’19 July’19 Dec’18 Oct’19
Due for Airport
June’20 Sep’20 June’19 July’15 Feb’19 April’20 Oct’17
assembly replacement
EM & MRT REPORT FOR THE MONTH OF APRIL’ 2019
Healthiness of KTPS V Stage Station Batteries
S.No DESCRIPTION UNIT IX UNIT X
1 Make & type of batteries EXIDE/TUBULAR EXIDE/PLANTE
No of cells installed/Date of
2 107 / 23.08.2018 106 / 03.01.2017
commissioning
No of batteries having good specific
3 107 / 107 106 / 106
gravity
No of batteries having out of voltage < 2.1 V:- Nil < 2.1 V:- Nil
4
( < 2.1 V & 2.3 Volts) > 2.3 V:- Nil > 2.3 V:- Nil
5 Voltage across battery system 237 V 237 V
6 Earth fault in DC system No fault No fault
Specific gravity/Voltage of batteries
7 1235 / 2.22 V 1210 / 2.23 V
(Average)
Healthiness of KTPS VI Stage Battery Banks
Sl. Date of Date of
Location Battery Bank details Remarks
No commissioning load test
Make: Exide
48 V Battery
1 Rating: 48 V, 400 AH 31.01.2011 09.07.2017 Healthy
Set-1
Type: Plante, YKP-33
Make: Exide
48 V Battery
2 Rating: 48 V, 400 AH 25.01.2016 14.07.2017 Healthy
Set-2
Type: Plante, YKP-33
Make: Exide
220 V Battery
3 Rating: 220 V, 250 AH 31.01.2011 09.07.2017 Healthy
Set-1
Type: Plante, YKP-21
Make: Exide
220 V Battery
4 Rating: 220 V, 250 AH 31.01.2011 14.07.2017 Healthy
Set-2
Type: Plante, YKP-21
Generator Hydrogen cooling system
Unit IX Unit X Unit-XI
% Hydrogen Purity (Min) % 96.9 97.6 97.63
Hydrogen due point temperature at --- --- ---
max.moisture
H2 Cylinders stock (Station) 70 (O&M Plant: 11 + Andhra Sugars: 59) 92 (Andhra Sugars)
CO2 Cylinders stock 63 55
BATTERIES CAPACITY TESTS CARRIED OUT
Duration of
S.No Description Temperature Date of test Remarks
discharge
1 Unit IX Main 10 hours 36°C 22.08.2018 Satisfactory
2 Unit X Main 10 hours 36°C 30.01.2019 Satisfactory
3 MCR-V Main -1 1.5 hours 36°C 12.02.2019 Unsatisfactory
4 MCR-V Main -2 2 hours 36°C 13.02.2019 Unsatisfactory
Expected
S.No Equipment Name Out since Reasons / Remarks Action by
date
MOT Analysis
Sl. Permissible
Description Unit-IX Unit-X Unit-XI
No values
1 Water, Weight% < 0.01% NIL NIL NIL
Neutralization 2.0 mg
2 0.02 0.02 0.02
No.(Total acidity) TAN KOH/gm
Kinematic Viscosity at 40.90 – 52.80
3 46.15 46.1 47.19
40 °C CST
Ash-Water Ratio
S.No Description Design Station
1 Bottom Ash 1:4 1:3
2 Fly Ash 1:5 1:4
3 Bottom Ash & Fly Ash 1:6 1:5
3 HP Water Pumps 100% 720 Hours , 2 pumps in service / 1 pump standby ----
14.23
Apr'19 May'19 Jun'19 Jul'19 Aug'19 Sep'19 Oct'19 Nov'19 Dec'19 Jan'20 Feb'20 Mar'20
Apr'19 May'19 Jun'19 Jul'19 Aug'19 Sep'19 Oct'19 Nov'19 Dec'19 Jan'20 Feb'20 Mar'20
STACK MONITORING REPORT ON 26.04.2019
Permissible
S.No Description Unit IX Unit X Unit-XI
limits
1 Flue gas Temperature 150°C 162 179 178
6
Unit X, 5.8
5
% Bottom Ash
1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
GROSS CALORIFIC VALUE (GCV) TREND FOR THE MONTH OF APRIL’ 2019
. KTPS V
4478
.
KTPS VI
4400
4200 4210
4159 4157
4095
4053
4000 4004
3909 39213903 3911 3927
3878 3858 3873
3800 38103822
GCV (Kcal/Kg)
3762 3765
3705 3702 3731
3687 3681 3695
3695
3600 3590
3400
3339 3359
3220 32493262
3200 31783195
31593185 3133 3154 3161 3162 31543130
3139
3108 31223106 30973119 30923105 3097 3112
3080 3081 3074 3090 3077 3083
3046
3000 2988
2800
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
BOILER WATER ANALYSIS FOR THE MONTH OF APRIL’ 2019
PH
1 9.20 – 9.80 9.68 /9.44 9.73 / 9.30 9.48/9.11 8.80 – 9.20 9.03 / 8.80 9.01 / 8.88 9.14/8.88
(Max / Min)
Silica
3 < 100 ppb 91 / 78 195 / 78 62/41 < 10 ppb 8.5 / 8.0 18.2 / 8.0 5.3/4.4
(Max / Min)
The PH, Conductivity & Silica in boiler drum , Main steam are with in permissible Limits
CHEMICAL CONSUMPTION & STOCK FOR THE MONTH OF APRIL’ 19
Cost of DM Water for KTPS V & VI Stages is Rs. 6.81 / MT for the month of April’
2019 when compared to Rs. 7.70 / MT for previous month
Chemical consumption and stock position for the month APRIL’19
Opening Receipts( Stock Quantity
Sl. No Chemical Consumption (MT)
Balance (MT) MT) (MT) sufficient upto
1 Hydrazine Hydrate 0.152 0.2 0.203 0.149 20.05.19
The total number of wagons received during the month of April’ 2019 is 6494 wagons
AMOUNT ACCRUED DUE TO DEMURRAGES IN THE MONTH OF APRIL’ 19
Total number of
Demurrage
Rakes (Nos.) wagons under Amount (Rs.)
hours
demurrage
7 406 10 174600.00
Total Demurrages incurred is Rs 1,74,600.00 and is applied for 100% waiver.
174600
0
April May June July Aug Sep Oct Nov Dec Jan Feb March
Demmurages accrued Net Amount paid ( incl. Tax) to SC rlys. Demmurages accured in last FY 18-19
80
60
40
18
20
0
Apr'`9 May'19 Jun'19 Jul'19 Aug'19 Sep'19 Oct'19 Nov'19 Dec'19 Jan'20 Feb'20 Mar'20
Demurrages paid for releasing of L.Rs as April’ 2019 at O&M, Transport / KTPS V&VI STAGES
P.O.No. Date of
L.R. No. & Date of Amount of
Sl. & Description of Release of
Date Rec. demurrages
No. Date Material material from Remarks
Transporter of L.R. Paid Rs.
Supplier transport office
-- NIL --
IT DIVISION REPORT FOR THE MONTH OF APRIL’ 2019
Activities under proposal / progress
Insulation of surveillance camera at VI stage TG floor, V stage floor was done. 34 nos. PTZ cameras out of
48 nos. and 8 nos. fixed cameras out of 30 nos. has been completed so far and installation of cameras at
outdoor stores, dispensary & stage VI is under progress.
Biometric attendance system for SPF was installed.
Customization of ZPERMISSIONS T code in SAP for permissions of employees is under progress.
Indent preparation is under process for surveillance cameras to replace diverted surveillance cameras.
Survey has been done for installation of cameras at ash pond.
Purchase order for replacement of industrial public addressing system units at necessary places of coal
plant, units 9 & 10 is raised and material to be supplied.
Indent preparation for mini OTDR, splicing kit and power meter is under progress.
Boiler-IX
With booster pump IH-31 (Highest Point) 11:18 hrs 5.2 kg/cm2 ---
(57.5 meters Elevation)
Boiler-X
With out booster pump IH-31 (Highest Point) 11:50 hrs 1.6 kg/cm2 ---
(57.5 meters Elevation)
Boiler-X
With booster pump IH-31 (Highest Point) 11:55 hrs 5.6 kg/cm2 ---
(57.5 meters Elevation)
Fire & Safety
Fire mock drill
KTPS V KTPS VI
conducted
Stage Stage
at & On
U#09
Location Transformer Canteen Area
Yard
03.04.2019 20.04.2019
Date & Time @10:30 hrs. @ 10:30 hrs.
STATUS OF MANDATORY LICENSES OF KTPS V & VI STAGES
S.No. Name of the license/Insurance Due date
1 Factory License , Regd No.38830 for KTPS V & VI Stages 31.12.2019
2 Insurance of Unit IX 31.05.2019
3 Insurance of Unit X 31.05.2019
4 Insurance of Unit XI 31.05.2019
5 Explosive License (P4664) for 9790 KL of HFO & LDO oil storage (Class-C petroleum) 31.12.2026
6 Explosive License (P30350) for 19.7 KL diesel bunk (Class-B petroleum) 31.12.2026
7 Explosive License G31659) storage of 12 Nos. chlorine cylinders in KTPS VI Stage 30.09.2022
8 Explosive License (G41727) storage of 15 Nos. Chlorine cylinders in KTPS V Stage 30.09.2026
9 Hydrogen cylinders storage License (G28643) in KTPS V Stage 30.09.2026
10 Boiler License of Unit IX (Regd.No.AP2954) 03.07.2019
11 Boiler License of Unit X (Regd.No.AP3010) (Provisional order issued for a period of 06 months) 11.08.2019
12 Boiler License of Unit XI (Regd.No.AP4983) 17.07.2019
13 Testing of tools, tackles & pressure vessels 11.02.2020
14 Air & water consent. 30.09.2022
15 Hydrogen cylinders storage (G39160) in KTPS VI Stage 30.09.2026
16 Public liability Insurance. 31.05.2019
17 Boiler Erector/Repairer in Telangana State under IBR,1950 26.11.2019