Beruflich Dokumente
Kultur Dokumente
34.5kV POWER
REF DRG 311-ESL-1001
UPSTREAM TRIPS
311-TFR-1051
480V/208V
15kVA
L&SP DBE
311-DBE-1061
DBE
311-DBE-1051 REF DRG 311-ESL-1061
BELT SPLICING
REF DRG 311-ESL-1051 DISTRIBUTION BOARD
FIRE TRIP 311-DBE-1121
CRUSHER MODULE
FQML
JUNCTION BOX ROM PAD
PEO DBE PEO DBE 311-DBE-#012 LIGHTING TOWER
311-DBE-1122 311-DBE-1123 JBE01 LEFT FRONT
311-SUB-1002
JUNCTION BOX ROM PAD
E-HOUSE CONTAINER (THYSSEN KRUPP) 311-DBE-#012 LIGHTING TOWER
JBE04 RIGHT BACK
OPERATORS CABIN
VESDA
THYSSEN KRUPP
CONTROL DESK
VESDA
(+C101.YOP01) 1 JUNCTION BOX VESDA HYD. HOUSE 1
TK
HOLD
EQUIP No VESDA HYD. HOUSE 2
CONTROL DESK
COMMUNICATIONS
(+C101.YOP02) 1 JUNCTION BOX
(+C101.XTB22) VOIP CAMERA
1
OIT DISCHARGE CONVEYOR INTERCOM
M
MAGNET I/O BOX CONTROL
I/O BOX
JUNCTION BOX
(+MS01.XCC01) 1 (+C101.XSP01) 1
M (+C101.XTB12)
1
(+C101.XSP02)
1
LV ROOM
ey
bradl
VESDA
chard.
COMMS PANEL
PLC CONTROL
311-COM-1003
ri
CABINET
(+C101.XCC01) 1
REF DRG 311-ECS-1031
14 AM
POWER
44:
JUNCTION BOX
9:
7.2kV/480V 1 (+GC01.LBS01)
1
1000kVA
VSD CABINETS
(+T101.T2002) 1 GANTRY CRANE
(+BC01.XPF01) POWER SUPPLY
(+BC01.XFC01) 1
dgn
(+CE01.XCC01) 1
(+BC01.XFC02)
ag\311\311-EBD-1000.
MAINTENANCE CAR
POWER
(+MW01.XCC01)
TRANSFORMER 1
LV MCC
7.2kV/480V
1000kVA (+N101.XMF01)
(+N101.XMF02) ROCK BREAKER
(+T101.T2001) 1
(+N101.XMF03) COMPRESSOR
(+N101.XPF01) (+HH01.XCC01)
ock Di
1
ng\EBD Bl
MV MCC
(+B101.XMF01)
7.2kV
(+B101.XPF01) 1
MV ELECTROLYTE
1824)
(+B101.XTF01)
JUNCTION BOX STARTER
SAS COMMS PANEL (+B101.XTF02) M
ect (
oduced.
ns
CLIENT
y
n
NGS
lnotbe passed on i
t
em ai
DRAWN J HARTSLIEF 19.06.18 MINA DE COBRE PANAMA
d par
d.
ect
ylt
oj
om
y pr
ects\C1443 Mi
REFERENCE DRAW I
ng r
r
he pr
hi
r
ovalf
l
o any t
nal
CHECKED K REDWOOD 19.06.18 MINERA PANAMA SA
awi
ONS
PRIMARY CRUSHER 1
ort
gi
en appr
s dr
i
thas been or
yf
SI
m att
DISCIPLINE
d.
BLOCK DIAGRAM OVERVIEW
Thi
el
1 TK NUMBERS ADDED. REVISED AS NOTED. RB KR JT 11.07.18 J TAN 20.06.18
REVI
t
ABN 53 131 815 337
yl
ENGINEER
ng shal
y ofPr
t
or
oni
PRINCIPAL
0 ISSUED FOR CONSTRUCTION JRH KR JT 20.06.18 QUALITY ENGINEERING SOLUTIONS A DINGLEY 20.06.18
i
awi
ch i
\Proj
oper
ENGINEER
houtpr
r
ect
COPYRI
orwhi
s dr
A0 311-EBD-1000 1824 1
any el
NTS
tshal
www.ProcessEI.com.au
he pr
Thi
REV DESCRIPTION DRN CHK ENG DATE REV DESCRIPTION DRN CHK ENG DATE DRAWING No. DESCRIPTION CLIENT
t
wi
J:
Pr
Tel: +61 8 9344 6030
f
t