QUALITY ASSURANCE PLAN FOR INERT CERAMIC BALL (Al2O3 :90%)

CAPEX Scheme No : 2Z3264

Format of
Record
Classificatio Type of
Sr.No. Criteria Limit Reference Documents / Process of test Remarks
n Check
Acceptance
Norms
1) FINAL INSPECTION :

1.1 Major 3rd party check


Average dimeter of STANDERD Measurement
the spherical ceramic 19 Physical SPECIFICATION report
balls (mm) Manual Measurement
Ratio of maximum dia STANDERD
1.2 Major Measurement
to minimum dia (Less 1.2 Physical SPECIFICATION
report Manual Measurement 3rd party check
than) 4.2
1.3 Density Major Physical Tested from actual Laboratory
sample Standard laboratory
(Kg/m3, Minimum) 3500 Test Report 3rd party check
process

1.4 Major STANDERD Laboratory Tested as specified IN


Crushing Strength Physical
SPECIFICATION standard specification 3rd party check
(Kg , Min) 430 Test Report
4.9 4.9

1.5 Impact Test Major Physical STANDERD Laboratory Tested as specified IN


SPECIFICATION standard specification 3rd party check
(%loss, Max) 1.5 Test Report
(4.7)
4.7
1.6 Quench Test Major Physical STANDERD Laboratory Tested as specified IN
(%loss, Max) 1.5 SPECIFICATION Test Report standard specification 3rd party check
4.8 (4.8)

PACKING : The materrial shall be packed in clean dry and airtight drums as specified in IS 9700:1991

MARKING: Each container must be marked with : a)Name & Grade b)Source of manufacturer c)Mass in container d)Date of packing
e)Batch number -- All in accordance with IS 9700:1991

SAMPLING As per Annexure B of IS9700:1991 (To be collected for 3rd party inspection and testing.Samples to be collected in 3 parts -
for Purchaser,Supplier and for Testing)

TESTING: Samples taken for testing to be tested in NABL Accredited Laboratory .Lab test report to be submitted along with 3rd party inspection report.

Certificate of manufacture or Import document to be verified and correlated by 3rd party.