Sie sind auf Seite 1von 2

PROPERTY : Jaro District, Iloilo City

OWNER : San Miguel Properties Inc.


PROJECT : Proposed Relocation Survey and Barbed Wire with Concrete Post Perimeter Fence
SUBJECT : Bill of Quantities

Item Work Description Qty Unit Unit Rate Total Cost


A Preliminaries
1.00 Mobilization / Demobilization 1.00 lot -
2.00 Permits and Clearances lot -
Barangay Clearance 1.00 lot -
Other permits (specify) 1.00 lot -
3.00 Bonds and Insurance lot
Surety 1.00 lot -
Performance 1.00 lot -
Warranty 1.00 lot -
4.00 Relocation Survey 1.00 lot -
5.00 Safety and Security 1.00 lot -
6.00 Temfacil 1.00 lot -
7.00 Temporary Utilities ( Electricity & Water) 1.00 lot -
8.00 Tools and Equipment 1.00 lot -
9.00 Shop drawings 1.00 lot -
Sub-total ( A- Preliminaries) -

B Site Works
Barbed Wire Fence
1.00 Clearing and Grubbing 1.00 lot
2.00 Excavation works 1.00 lot
3.00 Concreting works 1.00 lot
4.00 Footing (200 x 200 x 600mm ht)
Sand cu.m
Cement bags
Gravel cu.m
5.00 Posts (100 x 100 x 2100mm ht)
Rebars 10 mm pcs
Tiebars 8mm pcs
Sand cu.m
Cement bags
6.00 Barbed wire installation ( 5 layers) mtrs
Sub-total (B - Site works) 0.00

1.00 Others to Complete ( specify)

DIRECT COST -
Vat 12% -

Total Project Cost -


Further discounted to: VAT INC
General Conditions
1. Mode of payment
20% Down Payment
70% Progress Billling
10% Retention
2. Verify actual site conditions and specify other works needed that are not indicated in this Bill of Quantities.
3. Submit structural computations for owner's approval.
4. Allow necessary protective measures during construction of new perimeter fence

Specifications
1. Eagle Cement
2. Grade 40 reinforcing bars
3. 3/4 crushed gravel
4. River white fine sand
5. 3000 psi minimum concrete comprehensive strength
6. 3mm diameter galvanize barbed wires
7. Design & specification to comply w/ the Naional Building Code & latest National Structural Code