Sie sind auf Seite 1von 8

北京汇能精电科技股份有限公司

BEIJING EPSOLAR TECHNOLOGY CO., LTD

APP Installment and Application

1, Requirements
Android mobile phone supported OTG function.
OTG Function must be on
Android system version must be over 4.0
Controller with IR communication function
IR terminal for insert to the Mobile phone

2, Download and install the APP software to your Mobile

in the below linked to download “APP “

http://www.epsolarpv.com/en/index.php/Technical/download

Install the APP ,

After installing them ,it will show the logo”EPEVER” in your mobile phone desk

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

3、Insert the blue IR terminal to your mobile phone USB port

4, Confirm connected

After insert the IR terminal , your mobile phone will jump a message , Press “OK” to

confirm.

If no message to jump ,
1) check if the power is lower

2)In your Mobile Phone “setting” to find “developer options”, and choose “usb

debugging”,then re-insert the IR terminal to the mobile phone.

APP Application

1、Click ”Controller ” to go to the controller interface

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

2、Operation choice:RealTimeMonitoring/DeviceSetting,BatterySetting, Load setting

Click them to go into inner

you have to click“Read” (to read the connected controller info) ,configure (to program

the needed info) and click” Send”(to copy the configured info to controller)

3、Real Time Mnitoring ,

Click “Pull down Refresh ” to check the latest data from the controller
Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200
Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

4、Device Setting,”Communication Mode” to choose the connection method

between controller and Mobile .If you have LS-EPLI ,Tracer-EPLI in hand , you have

to choose “Infrared “

If the Controller and Mobile connected by wire ,you have to choose”Wired”

5, Battery Setting

Mainly set the battery type(Sealed,Gel,Flood, User), system nominal voltage and

the charging voltage set point.

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

If you want to program the Charging voltage setpoint , you have to choose

“Advance ” , “Battery Type “to “User”, And the “Rated Voltage Level “ must not be

“self-recognition”

6、Load Setting

(1) Manual Mode

It is for the load with alwayse works application.

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

Manually On or Off by default setting

On : means when powering on the system , the load will be on all the time unless the

battery is overdicharge and then will be on again after the battery reach to the

recovery voltage

Off :means the load Off

(2) Light On/Off

Sunlight control the Load working :

The Sunlight shine on the solar panel to generate the Voltage,

From Dark to Dawm ,sunlight strognness is different .Then there will be different

Voltage .

The controller control the Load on /Off by the Voltage .

Normally In 12V system Dark voltage is 5V ,Dawn Voltage is 6V , with 10 min.

delay .

(3) Light On+Timer (two model for choice)

1)The Load will work following to the setting of Timer1,Timer2 and Timer 3 in order

2)The night length time<Time1+Time2+Time3 , the Load work time will be real night

length time

3)The night length time>Time1+Time2+Time3 , there will be a gap for load not work .

In “Light On+Timer1” :The gap will be before sunrise

In“Light On+Timer2” :The gap will be between Timer2 and Timer 3

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

You may adjust the load output Power % in “Rated Current Percent”

(4)Real Time Control

Load working time will follow to the real time after synchronizing the controller time to

the project location real time in “Device Setting”-“Timer”.

(5) Configure load rated current

Rated Current= Load light source Power/ Load light source Power
Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200
Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com
北京汇能精电科技股份有限公司
BEIJING EPSOLAR TECHNOLOGY CO., LTD

(6) Under Voltage control Power reduction

When Battery voltage drop to System rated Voltage but not over discharge,

controller will control the load output by power reduction, (The output power percent

need to configure in PC software, Default 50%.)

Remarks: (5) and (6) are only for the LED Driver or Controller with built in LED

Driver

Add:BLDG#18,CO.PARK,NO.8HEYING ROAD,CHANGPING DISTRICT,BEIJING,CHINA.102200


Tel:86-10-82894112 / 82894962 Fax:86-10-82894882 Web:www.epsolarpv.com

Das könnte Ihnen auch gefallen