Assignment Brief
Student Name/ID
Number
Unit Number and Title 35 Professional Engineering Management (L/615/1503)
Academic Year 2019
Unit Tutor U Min Thein Tun
Assignment Title AS 1 of 1 professional engineering management report
Issue Date
Submission Date
IV Name & Date Dr Ye Thamain Sint ( . .2019)
Submission Format
Strategic portfolio:
A series of own project activities are undertaken, which allowed to build and
simple of strategic plan. The activities will be depended on the personal commitment about
an engineering service/s delivery plan with the obligations to society and the environment.
But it should include both the professional behaviours and develop the range of
employability skills. Students should have note results, analyse, evaluate, and draw
conclusions.
Presentation:
Prepare no more than 15 presentation slides, and speaker notes no more than
300 words. The observation records must be provided as evidence.
Strategic portfolio:
You have to provide outline proposal that is eagerly awaited new instruction for specific
engineering production or service. It should be included six constraints such as scope,
schedule, budget, resource, risk and quality. These are essential requirements for
successful managing and overcome challenges. Moreover, you need to consider SWOT
analysis and ethical issue that impact of engineering activates and understand limitations
when problems faced. You might use a range of method for agreement that how you
engage to stakeholders buy-in before delivery plan. Explain benefit of value analysis.
7. Performance measures
Project delivery plan should be contained total quality management (TQM). New product or
delivery plan are developed by strategy of QC- QA- QMS to support. Risk assessments are
required for quality. Obtain information form relevant resources are collected details to
meet customer satisfaction for change management plan if necessary.
Presentation:
You are required to deliver effective presentation that included communication skill, leader
ship style and team performance to audience. Describe the way of managing people that is
one of the techniques for listening and negotiation skills of communication. Evaluate how to
select right methods during implementation and monitoring. Produce the importance of
organisational development plan by keeping up to date of attitude, professional behaviour,
social responsibility, people habits and competence person to become professionalism.
Suggestion for continuing professional development (CPD).
Centre Name
Tutor
Proposed Title
I confirm that the project is not work that has been or will be submitted for another qualification and is
appropriate:
Agreed: (name) (date)
I confirm that the project is not work that has been or will be submitted for another qualification and is
appropriate:
Agreed: (name) (date)
Student
Student Name Student Number Date
Centre Name
Tutor
Project Title
Section Two: Detail the steps that were undertaken explaining why you took them
Section Four: What could have been done better? How could this have been achieved?
Textbooks
1. BURNS, B. (2014) Managing Change. 6th Ed. Pearson.
2. DEARDEN, H. (2013) Professional Engineering Practice: Reflections on the Role of
the Professional Engineer. CreateSpace Independent Publishing Platform.
3. KARTEN, N. (2010) Presentation Skills for Technical Professionals. IT Governance Ltd.
4. LOCK, D. (2013) Project Management. 10th Ed. Routledge.
Websites
1. http://www.engc.org.uk/ Engineering Council
UK-SPEC UK Standard for Professional Engineering Competence (E-Books)
2. http://www.ewb-uk.org/ Engineering without Borders (General Reference)
Links units
Unit 4: Managing a Professional Engineering Project
*Please access HN Global for additional resources support and reading for this unit. For further guidance and
support on report writing please refer to the Study Skills Unit on HN Global. Link to www.highernationals.com
Assessment Criteria
P1 Evaluate the risk evaluation M1 Critically evaluate the main D1 Specify and analyse the
theories and practices associated elements and issues that impact challenges encountered when
with the management of the successful management of meeting the requirements for
engineering projects. engineering activities. successfully managing
engineering activities, and make
P2 Assess elements and issues justified recommendations to
that impact the successful overcome these challenges.
management of engineering
activities.
P5 Describe the steps for M3 Evaluate leadership styles D3 Critically evaluate effective
effective persuasion and and effective communication ways for the coaching and
negotiation. skills using specific examples in mentoring of disillusioned
an organisational context. colleagues or of a poorly
P6 Explain the steps for performing team.
managing effective group
meetings.