ADANI GROUP
OHS PROCEDURE FOR
Contractor Safety
OHS-08
DOCUMENT HISTORY:
Rev
Date Key Changes
No.
01/01/2016 0 Issued for implementation
Prepared by:
Approved by:
CONTENT
SR.
TOPIC PAGE NO.
NO.
1.0. PURPOSE & SCOPE 3
3.0. PROCEDURE 3
3.1 - Contract and Contractor Classification 3
5.0. TRAINING 7
6.0. AUDITING 7
CONTRACTOR SAFETY
This procedure applies to Adani Group business locations and activities including
offices within India.
3. PROCEDURE:
f) Higher risk Work are those identified and addressed in OHS Procedure
No. 12.0 which require PTW and special permit, including but not limited
to the following:
Confined Space Entry
Work at height,
All Electrical Work
Hot Work
Work with and around Radioactive source
Work for and related to Excavation
Lifting and rigging, crane operation
a) Each site will follow and send Pre-Bid Contractor OHS Qualification
evaluation form – Annexure -1 to all level –I & II contractor with a request
to Quote inquiry raised by the Business or concern department
b) The received filled annexure will be reviewed and evaluated by concern
engineer in charge of the contract who wants to hire the services of that
contractor.
c) The contractor firm having OHSAS or IS-18001 certification with
established safety management setup will be given preference.
d) The contractor firm does not have OHS Management systems have to
abide and follow Adani Business / Site OHS system and training
requirement.
e) Based on the evaluation and rating the Contractor will be approved for
further bidding or submission of offer.
f) In case of dispute or site do not find suitable contractor the Site head and
Safety head can decide further course of action.
g) On rare occasions, when a site emergency exists, the site can use a
contractor who has not been pre-qualified, If it is one-time occurrence. If
this is a re-occurring event, the responsible manager shall initiate a pre-
qualification process in order to get that contractor qualified.
h) Level-I contractors with acceptable health and safety submittals will be
approved as qualified to proceed in the Bid submission process.
i) Upon award of the contract, the contractor will then submit with any
additional requested detail as indicated on Annexure-1 like MSDS,
Certificate of Insurance, etc.).
f) Based on the type, period and size of the contract At the minimum the
contractor shall attend, initiate and follow the safety target as finalized by
Engineer in charge for the followings:
4. RESPONSIBILITIES:
c) To maintain record required for all steps and document for concern
contractor.
d) To enforce penalty based on the noncompliance observation
e) To carry out pre job discussion and ensure training and qualification of
worker before assigning the job to the contractor.
f) To carry out contractor performance evaluation by carrying out on job
inspection of contractor work.
5. TRAINING:
Refer training procedure OHS -05 for training matrix for training need and available
training topics.
Contractors employee training need shall be evaluated using OHS -05 based on the
role and task assigned and ensures completion of training before start of the work
6. AUDITING:
8. CROSS REFERENCES:
Annexure-A
Part-A
Part-B
Site Specific improvement
A record (describe)
Site Specific Changes-
B Deviation, Exclusion record
(describe)
Annexure-1
PRE BID CONTRACTOR OHS QUALIFICATION EVALUATION FORM
(Level – I & II Contractor to Complete Sections all Questions)
RFQ Title:
Contractor Name:
Firm Reg. Nos:
Office Address:
with Labour Dept.
Phone/Fax:
(BOCW) etc.
Email address:
Total Permanent Total temporary
Nos. Nos.
employee: employee:
Type Nature of
business, Services:
ISO:9001 YES/NO ISO: 14001 YES/NO OHSAS:18001 YES/NO
Valid up to: Date Valid up to: Date Valid up to: Date
A]. Detail of similar work reference : (Past and Present Work) Add more lines if required
Sr. Period Contact person
Organization Type of work
No (From – To) (Mobile/Email)
1
3
B]. Certification
If ISO-18001 certified then would like to work as per
No of Procedure
your safe working procedure(s) Please attach your list ____Nos.
attached
of procedure(s):
If Not ISO-18001 certified then would like to work as
per our site safe working procedure(s)and Train your YES/NO
employee as required:
Attached Copy of Attach Organization Chart (with duties and
YES/NO YES/NO
Safety Policy: responsibilities-Adequately described)
C]. SAFETY PERFORMANCE : (Last three completed
previous years)
Third( last) second First (current)
Average Man-hours worked ( per year)
First aid injury (Nos.)
Reportable Injury (Nos.)
Fatal Injury (Nos.)
Notice of violation (Nos.) describe separately
Fines- Penalty: ( Rupees in Thousand)
Safety performance awards( If any) Attach
copy
Safety Training conducted (Nos.)
Employee trained by safety training (Nos.)
Able to provide
D]. Safety and other Qualification requirement for Requirement
Qualified Person(s)
(Filled by Site)
RFQ- Job (Attach training certificate if available) ( filled by firm)
(Remove lines which is not required) Number of Number
YES/NO YES/NO
person of Person
To be able to prepare Method statement for job
To be able to prepare Job safety analysis
To be able to carry out Risk- analysis
To be able to work as per- MS/JSA/RA if available
To build Scaffolding
To inspect Scaffolding
To work in Confined space
To work at height 0 to 10 mt
Signature: _________________________
Stamp:
Date:
Annexure: 2
CONTRACTOR MOBILISATION & WORK START CLEARANCE FORM
Name of Contractor Date: ___/___/____
M/s
Site Name: Order Number:
Description of Work:
Type Of Work: Mechanical - Electrical- Civil - Others -
Name Of Engineer In Name of Contractor
Charge Safety Officer/
Supervisor:
Mobil. No.: Mobile No.:
Annexure-3
Contractor Safety Performance Evaluation Form
Name Of Date
Contractor:
Department:
Frequency Monthly
Criteria Target Status/ Result
[+ P/- N]
1. No of PPE Noncompliance observation 0
2. No of Procedure/Rule Noncompliance 0
observation
3. No of Attendance Noncompliance 0
observation( safety staff)
4. No of Tool-Equipment Noncompliance 0
observation
5. Number of repeat observation 0
6. Number of times penalty imposed 0
7. No of own observation (closed by 100%
contractor within 30 day)
8. No of observation submitted by contractor
employee.
9. Safety Promotional activity
10. Safety Meeting Conducted
11. Tool box talk Conducted or attended
12. Other
[Expected 80% Positive] with improvement Performance:
Engineer In Head Of
charge Department
Signature Signature
Name Name
Date Date
Monthly Performance evaluation will be used for contractor running bill release
Site can add/modify monitoring parameter based on the type and size of contract
Annexure-4
Annexure-5
Safety Penalty deduction/Payment release/Hold Advice
Please arrange deduct and recover the amount of Rs. ______________________for the
safety violation penalty and other safety deductions as under from current R.A. Bill. The
Total Rs.______________
Appendix-1
Sample Site Specific Penal Provision