BILL NO 1: GENERAL
107 Allow for cost of engineering consultant for design Prov Sum 2,000,000.00
CONSTRUCTION OF IMOAFE STREET, AFUZE, OWAN EAST/WEST FEDERAL CONSTITUENCY, EDO STATE.
BILL NO 2: EARTHWORKS
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
N
201 Clear site 6m on each side of centre line of road
to remove grass including top soil to a depth of
150m and cart away 0.22 Ha 1,000,000.00 220,000.00
202 Excavate any material except rock and
side drains, haul excavated material any distance,
deposit, spread in 150mm layers and compact to
100% B.S. Compaction as filling for embankments
and trim slopes to required cross section. All measured
as completed work in final situ. 61 m3 1800 109,800.00
CONSTRUCTION OF IMOAFE STREET, AFUZE, OWAN EAST/WEST FEDERAL CONSTITUENCY, EDO STATE.
CONSTRUCTION OF IMOAFE STREET, AFUZE, OWAN EAST/WEST FEDERAL CONSTITUENCY, EDO STATE.
CONSTRUCTION OF IMOAFE STREET, AFUZE, OWAN EAST/WEST FEDERAL CONSTITUENCY, EDO STATE.
Total 33,804,300.00
5 % Contigencies 1,690,215.00