PMT OPRN SAUDI ARABIAN OIL COMPANY

S1
B.ANDERS
CERT
ENG’G

JL.ZHAO

CALCULATION SHEETS
ISSUED FOR CONSTRUCTION
DESCRIPTION

HVAC Calculation Report for SS-329


10-01525-0004
JO/EWO

19/05/2016
DATE
REV.
NO.
00

Jazan IGCC Power Block Project


DISCIPLINE
ENGINEER
A29-A-DOC-VE-015120
________________

DATE ___________

PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS
________

DATE ___________ 19/May ISSUED FOR


00 jL.Zhao J.Hao S.Wainwright B.Anders
2016 CONSTRUCTION
(DCC)NO. ________10-01525-0004-019_________
THIS INDICATES THAT REV. NO. __00________

APPROVAL/CERTIFICATION REQUIREMENTS,

Rev Date Description Prep Chk Appv’d PM SAPMT


REVISION CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SEPCO Revision History (to be removed after IFP issue)

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 1


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

TABLE OF CONTENTS
B.ANDERS
CERT

1 SCOPE ...............................................................................................................................................3

1.1 SCOPE................................................................................................................................................................................. 3
ENG’G

JL.ZHAO

1.2 PREMISES .......................................................................................................................................................................... 3

2 REFERENCES ..................................................................................................................................3

3 INPUT DESIGN DATA .....................................................................................................................3

3.1 INDOOR DESIGN CONDITIONS ...................................................................................................................................... 4


ISSUED FOR CONSTRUCTION

3.2 OUTDOOR DESIGN CONDITIONS.................................................................................................................................. 4


DESCRIPTION

3.3 U-VALUES .......................................................................................................................................................................... 5

4 PRESSURIZATION CALCULATIONS............................................................................................5

5 INTERNAL HEAT GAIN DUE TO EQUIPMENT AND LIGHTING................................................5

6 VENTILATION SUMMARY ..............................................................................................................6

7 AIR FLOW SUMMARY .....................................................................................................................6

SYSTEM LOADS ..............................................................................................................................7


10-01525-0004
JO/EWO

8.1 HEAT LOADS SUMMARY ................................................................................................................................................. 7


8.2 PSYCHROMETRIC SUMMARY ........................................................................................................................................ 7
19/05/2016
DATE

8.3 AIR FLOW SUMMARY ...................................................................................................................................................... 7

EQUIPMENT CAPACITY SELECTION ..........................................................................................8


REV.

9
NO.
00

DISCIPLINE
9.1 AIR HANDLING UNIT ........................................................................................................................................................ 8
ENGINEER

________________
9.2 ELECTRICAL DUCT HEATER .......................................................................................................................................... 8
DATE ___________
9.3 AIR COOLED CONDENSING UNIT ................................................................................................................................. 8
9.4 CHEMICAL FILTATION UNIT ........................................................................................................................................... 8
PROJECT
ENGINEER

9.5 SAND TRAP UNIT ............................................................................................................................................................. 8


________________

DATE ___________

CERTIFIED
9.6 EXHAUST FAN ................................................................................................................................................................... 9
________________

DATE ___________
10 PSYCHROMETRIC CHART ............................................................................................................9

CONSTRUCTION 11 CALCULATION REPORTS FROM HAP 4.8...............................................................................9


AGENCY

________________

DATE ___________

OPERATIONS
________

DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 2


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
B.ANDERS
CERT

1 SCOPE

1.1 Scope
ENG’G

JL.ZHAO

The scope of this document is to present the HVAC calculations results for the
detailed design of the Substation SS-329, in order to establish the minimum
requirements for the HVAC System Design.

1.2 Premises
ISSUED FOR CONSTRUCTION

These calculations have been performed under the following premises:


DESCRIPTION

 Calculations has been performed using CARRIER`s Hourly Analysis Program


(HAP) System Design Load, version 4.8.
 Internal heat gains due to electrical / electronic equipment are from electrical /
instrument engineering data and shall be reviewed if the heat load changed after
purchase.
 Pressure calculation based on BRA 7E draft version and related discipline input
information.
 For the telecom room, the total equipment heat dissipation will add the 20%
10-01525-0004
JO/EWO

minimum increase to have excess capacity for the future equipment.

2 REFERENCES
19/05/2016
DATE

ASHRAE Handbook Systems and Equipment


ASHRAE Handbook Fundamentals
REV.
NO.

ASHRAE Cooling and Heating Load Calculations Manual


00

A10-A-DOC-VE-014968 HVAC Design Basis


DISCIPLINE
ENGINEER SAES-K-001 Design and Installation of Heating, Ventilating and Air
________________ Conditioning Systems
DATE ___________
SAES-K-002 Air Conditioning Systems for Essential Operating
PROJECT
ENGINEER Facilities
________________ SAES-K-003 Air Conditioning Systems for Communications Buildings
DATE ___________
SAES-M-009 Design Criteria for Blast Resistant Buildings
CERTIFIED SAES-M-100 Saudi Aramco Building Code
________________
SAES-P-103 Batteries and UPS Systems
DATE ___________
SAES-P-119 Onshore Substations
CONSTRUCTION
AGENCY
SAES-S-070 Installation of Utility Piping Systems
________________ SABP-K-001 Energy Efficient Buildings
DATE ___________

OPERATIONS
________
3 INPUT DESIGN DATA

DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 3


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1
B.ANDERS
CERT

3.1 Indoor Design Conditions


ENG’G

JL.ZHAO

Table 1 Indoor Design Conditions

Indoor design parameters Noise Indoor


level pressure Notes
HVAC Air
Summer Winter NC control
System Room Name change
No. rate
Temp. RH Temp.
ISSUED FOR CONSTRUCTION

RH(%) dB (+/- Pa)


(℃) (%) (℃)
DESCRIPTION

Switchgear
<=29 - <=29 - 45~55 Positive
Room
No
Battery
22.5±2 - 22.5±2 - 45~55 ≥1/3 Positive recirculation
Room
air*(1)
PAS/SAS
22 ±2 50 ±10 22 ±2 50 ±10 45~55 Positive
A29- Room
AHU- Telecom
22 ±2 50 ±10 22 ±2 50 ±10 45~55 Positive
301A//B Room
Air lock G04 <=29 - <=29 - 45~55 Positive

Air lock G06 <=29 - <=29 - 45~55 Positive

Mechanical
10-01525-0004
JO/EWO

<=29 - <=29 - <85 Positive


Room

*(1) No air return shall be considered for Battery Room. Building shall keep a positive pressure relative
to atmosphere.
19/05/2016
DATE

3.2 Outdoor Design Conditions


REV.
NO.
00

Table 2-1 Outdoor Design Conditions(2.5% Dry Bulb)


DISCIPLINE
ENGINEER
Description Summer Winter
________________

DATE ___________
Dry Bulb Temperature ºC 38℃ *(2) 21℃
PROJECT
ENGINEER Wet Bulb Temperature ºC 28℃ 17℃
________________

DATE ___________

CERTIFIED Table 2-1 Outdoor Design Conditions(2.5% Wet Bulb)


________________
Description Summer Winter
DATE ___________

Dry Bulb Temperature ºC 36℃ *(2) 21℃


CONSTRUCTION
AGENCY

________________ Wet Bulb Temperature ºC 30℃ 17℃


DATE ___________

*(2) For Air Cooled Condensing Unit selection, the temperature of air entering to the condenser coil
OPERATIONS
________ shall be 44.5 ℃ , according with A10-A-DOC-VE-014968 HVAC Design Basis “ 4 SPECIAL
REQUIREMENTS FOR HVAC SYSTEM”.
DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 4


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

3.3 U-values
B.ANDERS
CERT

Table 3 U-Values
Components Thickness Resistance K(U-Value)
ENG’G

JL.ZHAO

(t) (R) (W/m2 °C)


mm (m2 °C/W)
Roof without Ceiling
Inside Air-Surface Resistance - 0.12064
Slab 150 0.184
Light Weight Concrete Screed 20 0.05
Polyisocyanurate Rigid Insulation 76 5.25
Fiberboard 25 0.03
ISSUED FOR CONSTRUCTION

Course Fully Bonded EPDM Membrane 1.52 0.009


DESCRIPTION

Concrete Protection Screed 50 0.13


Outside Air-Surface Resistance - 0.05864
TOTAL 5.83 0.172

External & Internal Wall


Outside Air-Surface Resistance - 0.05864
Concrete Wall 250 0.24
Air Space 10 0.16
Fiber Glass Wool Insulation 89 1.97
Gypsum Board 16 0.098
Inside Air-Surface Resistance - 0.12064
TOTAL 2.65 0.377
10-01525-0004
JO/EWO

Note: U-Values taken from HAP System Design Load Library.

4 PRESSURIZATION CALCULATIONS
19/05/2016
DATE

An additional 5% (minimum) of fresh air shall be included in the design of SS-329


Substation, over and above all other fresh air requirements (include the extract air
REV.
NO.
00

from the building) to achieve a positive pressure relative to atmosphere. This


DISCIPLINE
overpressure is to prevent in ingress of dust and normal ambient fumes.
ENGINEER

________________

DATE ___________

PROJECT
5 INTERNAL HEAT GAIN DUE TO EQUIPMENT AND LIGHTING
ENGINEER

________________

DATE ___________
Table 4 Internal Heat Gain due to Equipment and Lighting *(3)
CERTIFIED

________________ Room Electrical Equipment Lighting Data


DATE ___________
W W/m²
CONSTRUCTION
AGENCY Switchgear Room 85360 20
________________

DATE ___________ Battery Room 6624 20

OPERATIONS PAS/SAS Room 400 20


________

Air lock G08 0 20


DATE ___________

Telecom Room 1700*1.2 *(4) 20


APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Air lock G04 0 20

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 5


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

Air lock G06 0 20


B.ANDERS
CERT

Mechanical Room 750 20


ENG’G

JL.ZHAO

*(3) Electrical power SubStation are considered as unmanned building. Heat gains due to people
were not considered.
*(4) Telecom room loads of electrical equipment add 20% due to client’s comments.

6 VENTILATION SUMMARY
ISSUED FOR CONSTRUCTION
DESCRIPTION

Table 5 Ventilation Summary


Room Exhaust Requirements
Room*(5) area height volume Air Changes Calc. Design Leak
m² m m³ AC/H CMH EACMH EA CMH CMH
Battery Room 106 6.5 689 ≥1/3 ≥230 3680 3500 180

*(5) This table just list rooms which have ventilation requisition.

7 AIR FLOW SUMMARY


10-01525-0004
JO/EWO

Table 6 Air Flow Summary


Temperature Supply air RA
Room Adjusted Make-Up (CMH)
(℃ ) (CMH) (CMH)
19/05/2016
DATE

Load
Room TA TA
(KW) SA Room Calc. Dsgn. Leak Exh.
(S) (R)
Switchgear
REV.

113.6 13 <=29 24237 24240 60 - 500 - 23800


NO.

Room
00

DISCIPLINE
Battery Room 11.7 13 22.5 ±2 3675 3680 - - 180 3500 -
ENGINEER

________________ PAS/SAS Room 2.6 13 22 ±2 842 860 - 40 - - 820


DATE ___________

PROJECT Telecom Room 3.4 13 22 ±2 1126 1130 - 60 - - 1070


ENGINEER

________________
Air lock G04 0.3 13 <=29 71 80 - - 80 - -
DATE ___________

CERTIFIED Air lock G06 0.3 13 <=29 73 80 - - 80 - -


________________
Mechanical
DATE ___________
Room
5.1 13 <=29 1090 1090 - - 240 - 850

CONSTRUCTION
Notes:
AGENCY TA (S) = Transfer Air (Supplied from other rooms)
________________ TA (R) = Transfer Air (Transferred to other rooms)
DATE ___________ For room details, building location and orientation see drawings A29-R-ARC-VA-120519-001/002.

OPERATIONS
________
Room loads in the Table 6 are referred to the heat gains inside each room, due to
heat transfer trough the walls and roof, internal room equipment, lighting, and
DATE ___________ people.
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____

The Internal loads shown in the Table 7 are the design loads that occurs in the
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

entire building at the building design day.

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 6


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

Table 6 shows the design internal load in each room handled by the air handling
B.ANDERS
CERT

unit . These loads are the highest loads that occurs in each room and they do not
occur necessarily in the same day, for this reason the sum of all loads shown in
the Table 6 do not coincide exactly with the combined loads of the entire building,
ENG’G

JL.ZHAO

shown in the Table 7, however, the supply air flows corresponding to the heat
loads indicated in the Table 6 shall be taken as design air flow volumes in order to
cover maximum rooms supply air requirements.

The design cooling day for each room is shown in the attachment.
ISSUED FOR CONSTRUCTION

The entire building combined design loads are shown in attachment.


DESCRIPTION

The HVAC calculations are performed using the Carrier Hourly Analysis Program
(HAP), version 4.8.

The total system loads are taken from the Air System Sizing Summary and the
System Psychrometics data (see attachment).

8 SYSTEM LOADS
8.1 Heat Loads Summary
10-01525-0004
JO/EWO

Table 7 Heat Loads Summary


Sensible Heat Latent Heat Total Heat
Cooling Loads (KW) (KW) (KW)
19/05/2016
DATE

Internal Loads 133.3 0 133.3


Total System Loads 164.7 64.4 229.1
REV.
NO.
00

8.2 Psychrometric Summary


DISCIPLINE
ENGINEER

________________ Table 8 Psychrometric Summary


DATE ___________

Psychrometric Data DB (℃) WB (℃)


PROJECT
ENGINEER

________________
Return Air (Room Air) 26.2 16.9
DATE ___________
Outdoor Air 36 30
Mixed Air Entering Coil 27.7 19.3
CERTIFIED
Air Leaving Coil 11.9 11.3
________________ Air Leaving Fan Outlet (Supply Air) 13 11.8
DATE ___________

CONSTRUCTION
AGENCY 8.3 Air Flow Summary
________________

DATE ___________
Table 9 Air Flow Summary
OPERATIONS Air Flow Data CMH
________

Return Air Quantity 26420


DATE ___________ Outdoor Air Quantity 4740
Total Air Quantity (Supply Air) 31160
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 7


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

9 EQUIPMENT CAPACITY SELECTION


B.ANDERS
CERT

9.1 Air Handling Unit


9.1.1 Coil Loads
ENG’G

JL.ZHAO

Table 10 Cooling Coil Loads


Sensible Heat Latent Heat Total Heat
Cooling Loads (KW) (KW) (KW)
Cooling Capacity(Each Unit) 164.7 64.4 229.1
ISSUED FOR CONSTRUCTION

9.1.2 Coil Entering / Leaving Air Temperatures


DESCRIPTION

Table 11 Cooling Coil Entering / Leaving Air Temperatures


Coil Entering / Leaving Air Temp. DB (℃) WB (℃)

Coil Entering Air Temperature 27.7 19.3


Coil Leaving Air Temperature 11.9 11.3

9.1.3 Supply Fan Data


Table 12 Supply Fan Data
Equipment No. Flow (CMH)/Each Unit Motor (KW)
10-01525-0004
JO/EWO

A29-AHU-301A/B 31160 18.5


19/05/2016
DATE

9.2 Electrical Duct Heater

Table 13 Electrical Duct Heater


REV.
NO.
00

Equipment No. Heating Load(KW) Air Flow(CMH)


DISCIPLINE
ENGINEER
A29-EDH-301 1.5 860
________________
A29-EDH-302 4 3680
DATE ___________ A29-EDH-303 2 1130
PROJECT
ENGINEER

________________ 9.3 Air Cooled Condensing Unit


DATE ___________

CERTIFIED Table 14 Air Cooled Condensing Unit


________________ Cooling Capacity Air Entering Condenser Coil
Equipment No. each unit (100% x 2)(KW) Temp. (℃)
DATE ___________

A29-ACCU-301A/B 229.1 44.5


CONSTRUCTION
AGENCY

________________

DATE ___________ 9.4 Chemical Filtation Unit

OPERATIONS
Table 15 Blower Data
________
Equipment No. Flow (CMH) Motor (KW)
DATE ___________ A29-CFU-301 4740 3.0
APPROVAL/CERTIFICATION REQUIREMENTS,

9.5
(DCC)NO. _______10-01525-0004-019________

Sand Trap Unit


THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Table 16 Bleed Fan Data

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 8


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9
PMT OPRN
SAUDI ARABIAN OIL COMPANY
S1

Equipment No. Flow (CMH) Motor (KW)


B.ANDERS
CERT

A29-BF-301 520 0.18


ENG’G

JL.ZHAO

9.6 Exhaust Fan

Table 17 Exhaust Fan


Equipment No. Flow (CMH) Motor (KW)
A29-EF-301A/B 3500 1.5
ISSUED FOR CONSTRUCTION
DESCRIPTION

10 PSYCHROMETRIC CHART

See attachment V015120–Attachment 1.

11 CALCULATION REPORTS FROM HAP 4.8

See attachment V015120–Attachment 1.


10-01525-0004
JO/EWO

19/05/2016
DATE
REV.
NO.
00

DISCIPLINE
ENGINEER

________________

DATE ___________

PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS
________

DATE ___________
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______10-01525-0004-019________
THIS INDICATES THAT REV. NO. ___00_____
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

CALCULATION SHEETS DWG. TYPE PLANT INDEX DOC. SHT. NO. REV. NO.

HVAC CALCULATION REPORT FOR SS-329 DOC VE- 9


A29 A
ELECTRICAL POWER DISTRIBUTION & INT 015120 OF 00
JAZAN SAUDI ARABIA JO / EWO: 10-01525-0004 9