I33321 Attachment Plate Welding Issue Arun Kumar Mesias Baskaran I34482 Welding Inconsistency Arun Kumar Mesias Baskaran Asignee4D5D6D Asignee7D8D BusinessUnit Category Classification Arun Kumar Mesias Baskaran New Sales Error 1. Safety Mesias Baskaran Mesias Baskaran New Sales Error 2. Quality Mesias Baskaran Mesias Baskaran Error 1. Safety ErrorCode FacilityWhereDetected Function ID 05 - Welding (special process acc IRIS) Dellner India - DCIN Procurement 1173 05 - Welding (special process acc IRIS) Dellner India - DCIN Procurement 3368 05 - Welding (special process acc IRIS) Dellner India - DCIN Procurement 4566 NCR_2D NCR_3D Inspected all the parts in Stores and found 10Pcs with the Parts being corrected at local En15085 supplier (Airflow) All availabel Parts 57nos Quranined , All 57nos Suspected Parts are send back to Supplier for Welding All available Parts are Qurantined for re-work , Qurantined Parts are send back to welding supplier for welding r NCR_4D NCR_5D Due to the manual rotate & the welded of Square tube each fae•manaual i rotation Work and welding Instruction for the start from end manipulator corner is not of the square tube in place. Not checked after welding . IMPROPER • FUSION Production AND weld LESS not coupon DEPOSITION prepared asONper SQUARE BLOCK ISO 15613 • EDGE PREPARATION Welding Notmostly carried out done .in extended shifts during the nights where welders are oversta During inspection it was missed . • Welder not controlled multiple layer in the groove by proper sequence • Dellner India from sub supplier information Provided wrong information (typo error) that Implement the edge preparation on square block. 1.Assosiate NCR_6D Implemented hasmultiple been trained and&made weld run aware multiple of all instead process Points to of be before single run.packing . 2.All Root welded run will corner are merged be covered by GTAW . process •3.Indruduced Final weld runthe Manipulatorwillrotation RPM andtype be done speed by of welding GMAW control fixture and is information process. around addedthe Square in Work tube . & placed near the welding zone. Provided training to welder for following the instruction 4. welding •Load test Vstart Half will befrom and Half doneYcentre of tube production on Initial instead weld 2 sample is to of corner carried . per ISO 15613 to meet the requirement of EN 15085-4 out the analyse as • weld Trained welder is used for Multiple layer welding. Will implement Macro check every 6 months strength. •Implementation New WPS is prepared Target date as per EN15614 & WPQR as per EN9606-1 to test the Raw material E470. Weld consumable used is ER80 SG : 25.11.2017 Added chamfer 45⁰x5 on square block. First weld run is covered by GTAW process. NCR_7D Final weld run is completed by GMAW process. After welding All welded verified parts the actual are 100% throatdone inspection thickness as perwith weld ,gauge. EN5817 class -c Evaluated the surface defect by liquid penetrant test. Load test carried out on actual component. All Loadtheapplied parts are loadvisually >169 KNchecked andton) (Apx 17 found satisfactory without fracture.(Refer attached report No-RE/2017/11/0369) Negative Validation Actual regular Part has failed at 96.070 KN (Refer attached report No-RE/2017/11/0381) NCR_8D NCR_ClosingDate NCR_CreatedDate Before packing all parts are checked 2017-07-14 2017-01-03 Negative validation done and ok . 2017-11-27 2017-11-27 All the key points concentrated and display the work 2018-06-06 2018-05-04 NCR_IssueDescription NCR_LastModifiedDate NCR_Qty Welding underfill in corner area. 2017-07-14 10 Faste Attachment Weld Aeebly weld Broken . 2017-11-27 1 Uneven Weld Bead. Excess Reinforcements affecting visual appearance. 2018-06-06 16 Wrong Filler wire chosen for welding NCR_ReportedBy NCR_VerificationComment Suresh Kumar verified ok . verified found ok . Mesias Arun Kumar Documents and visual veriried du State Subsidiary First7D_8D Closed NCRs Dellner India - DCIN 2017-07-14 Closed NCRs Dellner India - DCIN 2017-11-27 Closed NCRs Dellner India - DCIN 2018-06-06