Sie sind auf Seite 1von 51

PROYEK HARRIS SEMINYAK

Item : BORED PILE


Building : HOTEL

Jmlh Tinggi Dimensi Tulangan Pokok


Concrete
Bored Pile Bored Pile Formwork Panjang + Berat
NO. DESCRIPTION Ø Ø/D Jlh Berat Ø
K-300 Overlap total
(bh) (m) (m) (m) (m2) (m3) (m) (kg/m) (m) (kg) (m)
BORE PILE GRID D1-D13
A STRUKTUR BORED PILE
1. BORED PILE PC.1A 41 4.43 Tabung 1.00 570.837 142.709 0.016 20 1.578 4.430 5,733.11
POT. 1 1.00 - 0.010
POT. 2 3.43 - 0.010
-
JUMLAH 570.837 142.709 5,733.11

2. BORED PILE PC.1A' 3 4.43 Tabung 1.00 41.769 10.442 0.016 20 1.578 4.430 419.50
POT. 1 1.00 0.010
POT. 2 3.43 0.010

JUMLAH 41.769 10.442 419.50

3. BORED PILE PC.1B 108 4.43 Tabung 0.60 902.201 135.330 0.016 12 1.578 4.430 9,061.12
POT. 1 1.00 0.010
POT. 2 3.43 0.010

JUMLAH 902.201 135.330 9,061.12

4. BORED PILE PC.1C 62 4.43 Tabung 0.40 345.287 34.529 0.013 8 1.042 4.430 2,289.31
POT. 1 1.00 0.010
POT. 2 3.43 0.010

JUMLAH 345.287 34.529 2,289.31

5. BORED PILE (Ø 800) PC.2G 3 4.43 Tabung 0.80 33.415 5.778 0.016 12 1.578 4.430 251.70
POT. 1 1.00 0.010
POT. 2 3.43 0.010

BORED PILE
BORED PILE (Ø 1000) PC.2G 3 4.43 Tabung 1.00 41.769 9.028 0.016 20 1.578 4.430 419.50
POT. 1 1.00 0.010
POT. 2 3.43 0.010

JUMLAH 75.183 14.806 671.19

5. BORED PILE (Ø 800) PC.2G* 2 4.43 Tabung 0.80 22.277 3.852 0.016 12 1.578 4.430 167.80
POT. 1 1.00 0.010
POT. 2 3.43 0.010
BORED PILE (Ø 1000) PC.2G* 2 4.43 Tabung 1.00 27.846 6.019 0.016 20 1.578 4.430 279.66
POT. 1 1.00 0.010
POT. 2 3.43 0.010

JUMLAH 50.122 9.870 447.46

TOTAL 224 1985.399 347.686 18621.70

BORED PILE
364.00

Tulangan Sengkang Jumlah Jumlah


Berat
Berat Jarak Jlh Kel.
Total D10 D13 D16 TOTAL D10 D13 D16
(kg/m) (m) (m) (kg/m) (kg) (kg) (kg) ( kg ) (btg) (btg) (btg)

- - - 5,733.1 5,733.11 - - 303


0.617 0.100 4 3.019 305.22 305.2 - - 305.22 42 - -
0.617 0.200 15 3.024 1,146.45 1,146.5 - - 1,146.45 155 - -
- - - - - - - -
1,451.67 1,451.7 - 5,733.1 7,184.8 197.0 - 303.0

- - 419.5 419.50 - - 23
0.617 0.100 4 3.019 22.33 22.3 - - 22.33 4 - -
0.617 0.200 15 3.024 83.89 83.9 - - 83.89 12 - -

106.22 106.2 - 419.5 525.7 16.0 - 23.0

- - 9,061.1 9,061.12 - - 479


0.617 0.100 4 1.763 469.49 469.5 - - 469.49 64 - -
0.617 0.200 15 1.771 1,769.08 1,769.1 - - 1,769.08 240 - -

2,238.57 2,238.6 - 9,061.1 11,299.7 304.0 - 479.0

- 2,289.3 - 2,289.31 - 184 -


0.617 0.100 4 1.136 173.66 173.7 - - 173.66 24 - -
0.617 0.200 15 1.149 658.76 658.8 - - 658.76 90 - -

832.42 832.4 2,289.3 - 3,121.7 114.0 184.0 -

- - 251.7 251.70 - - 14
0.617 0.100 4 2.391 17.69 17.69 - - 17.69 3 - -
0.617 0.200 15 2.397 66.50 66.50 - - 66.50 9 - -

BORED PILE
- - 419.5 419.50 - - 23
0.617 0.100 4 3.019 22.33 22.33 - - 22.33 4 - -
0.617 0.200 15 3.024 83.89 83.89 - - 83.89 12 - -

190.40 190.4 - 671.2 861.6 28.0 - 37.0

- - 167.8 167.80 - - 9
0.617 0.100 4 2.391 11.79 11.79 - - 11.79 2 - -
0.617 0.200 15 2.397 44.33 44.33 - - 44.33 6 - -
- - 279.7 279.66 - - 15
0.617 0.100 4 3.019 14.89 14.89 - - 14.89 3 - -
0.617 0.200 15 3.024 55.92 55.92 - - 55.92 8 - -

126.94 126.9 - 447.5 574.4 19.0 - 24.0

4946.22 4946.22 2289.31 16332.39 23567.91 678.00 184.00 866.00

BORED PILE
Selimut Beton = 0.07
Tekukan = (6*db)+0,075
PROYEK HARRIS SEMINYAK T. balok Rata-Rata = 0.417
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID D1-D12 & AS 1 - 4"

TINGGI DIMENSI KOLOM


TIPE JUMLAH KOLOM
No. BENTANG GRID - AS LEBAR PANJANG
KOLOM KOLOM
(m) (m) (m)

1 K1-2 1'-(D1-D12) Horizontal 22 3.080 0.450 0.600


2 K1-1 2-(D1-D12) Horizontal 12 3.080 0.450 0.600
3 K1-1 2"-(D1-D12) Horizontal 12 3.080 0.450 0.600
4 K1-2 4'-(D1-D12) Horizontal 22 3.080 0.450 0.600
5 KL-1 Kolom Siku 8 3.080 0.150 0.450
6 K4-1 5 3.080 0.250 0.800

JUMLAH 81

972 3.234 4 4
3.234 4 4
3.234 4 4
3.234 4 4
1.848 4 4
3.234 4 4
FORMWORK CONCRETE TULANGAN UTAMA
TEBAL PLAT
PLYWOOD K-300 D. JML BERAT PANJANG BERAT TOTAL
(m) (m2) (m3) (m) (kg/m) (m) (kg)

0.120 123.021 15.817 0.016 14 1.578 3.331 1619.192


0.120 67.102 8.627 0.019 14 2.226 3.349 1252.174
0.120 67.102 8.627 0.019 14 2.226 3.349 1252.174
0.120 123.021 15.817 0.016 14 1.578 3.331 1619.192
0.120 25.563 1.438 0.013 12 1.042 3.313 41.421
0.120 27.959 2.663 0.019 14 2.226 3.349 104.348

433.767 52.989 5,888.50

3 24 1944
3 24
3 24
3 24
3 24
3 24
144
TULANGAN SENGKANG
D JARAK (m) JUMLAH BERAT PANJANG BERAT TOTAL AREA TU
(m) TUMP. LAP. TUMP. LAP. (kg/m) (m) (kg) D (m) JML. TIES

0.010 0.100 0.100 9 18 0.617 2.090 765.360 0.013 1


0.010 0.100 0.100 9 18 0.617 2.090 417.469 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 417.469 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 765.360 0.013 1
0.010 0.000 0.100 0 18 0.617 2.380 422.574
0.010 0.075 0.075 12 23 0.617 4.180 901.940 0.010 1

3,690.17
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG

0.100 9 9 1.522 1.042 313.978 0.010 1 0.100 18


0.100 9 9 1.522 1.042 171.261 0.010 1 0.100 18
0.100 9 9 1.522 1.042 171.261 0.010 1 0.100 18
0.100 9 9 1.522 1.042 313.978 0.010 1 0.100 18

0.075 12 12 1.450 0.617 53.636 0.01 1 0.075 23

1,024.11
BERAT TULANGAN UTAM
BERAT TOTAL
EA LAPANGAN BERAT BERAT 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)

18 1.450 0.617 353.994 667.973 3,052.525 - -


18 1.450 0.617 193.088 364.349 2,033.992 - -
18 1.450 0.617 193.088 364.349 2,033.992 - -
18 1.450 0.617 353.994 667.973 3,052.525 - -
463.995 - 41.4
23 1.450 0.617 102.801 156.437 1,162.724 - -

1,196.97 2,221.08 11,799.75 - 41.421

4,940.773 1011.900
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

1,619.2 - - 765.360 - - -
- 1,252.2 - 417.469 - - -
- 1,252.2 - 417.469 - - -
1,619.2 - - 765.360 - - -
- - - 422.574 - - -
- 104.3 - 901.940 - - -

3,238.38 2,608.70 - 3,690.17 - - -

3,238.38 2,608.70
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- - 313.978 - - - 353.994
- - 171.261 - - - 193.088
- - 171.261 - - - 193.088
- - 313.978 - - - 353.994
- - - - - - -
- 53.636 - - - - 102.801

- 53.64 970.48 - - - 1,196.97


BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING

(kg) (kg) (kg) (kg) (kg) (kg/m3) (m2/m3)

- - - - 3,052.525 192.991 7.778


- - - - 2,033.992 235.759 7.778
- - - - 2,033.992 235.759 7.778
- - - - 3,052.525 192.991 7.778
- - - - 463.995 322.689 17.778
- - - - 1,162.724 436.658 10.500

- - - - 11,799.75
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - 86 - - 104 - -
- - - 47 - 57 - -
- - - 47 - 57 - -
- - 86 - - 104 - -
- 4 - - - 58 - -
- - - 4 - 122 - -

- 4 172 98 - 502 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - 43 - - - 48 -
- - 24 - - - 27 -
- - 24 - - - 27 -
- - 43 - - - 48 -
- - - - - - - -
- - - - - - 14 8

- - 134 - - - 164 8
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)

43 - - -
24 - - -
24 - - -
43 - - -
- - - -
- - - -

134 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID-AS (C1-C3' )-(1-4")

TINGGI DIMENSI KOLOM


TIPE JUMLAH KOLOM
No. BENTANG GRID - AS LEBAR PANJANG
KOLOM KOLOM
(m) (m) (m)

1 K5-1 1-(C1'-C1') (Horizontal) 2 3.080 0.250 0.600


2 K1-1 (C1"-C3')-1 (Horizontal) 5 3.080 0.450 0.600
3 K1-1 (C1-C3)-2 Horizontal 4 3.080 0.450 0.600
4 K1-1 (C1-C3)-3 Horizontal 4 3.080 0.450 0.600
5 K1-1 (C1-C3)-3' Horizontal 3 3.080 0.450 0.600
6 KL1 Kolom Siku 7 3.080 0.150 0.450
7 KL2 Kolom Siku 5 3.080 0.250 0.500

JUMLAH 30
0.07
(6*db)+0,075
0.437

FORMWORK CONCRETE TULANGAN UTAMA


TEBAL PLAT
PLYWOOD K-300 DIA. JML BERAT PANJANG BERAT TOTAL
(m) (m2) (m3) (m) (kg/m) (m) (kg)

0.120 8.987 0.793 0.019 14 2.226 3.349 208.696


0.120 27.753 3.568 0.019 14 2.226 3.349 521.739
0.120 22.203 2.855 0.019 14 2.226 3.349 417.391
0.120 22.203 2.855 0.019 14 2.226 3.349 417.391
0.120 16.652 2.141 0.019 14 2.226 3.349 313.044
0.120 22.203 1.249 0.013 12 1.042 3.313 289.948
0.120 19.824 1.652 0.019 18 2.226 3.349 670.808

139.823 15.112 2,839.02


TULANGAN SENGKANG
DIA. JARAK (m) JUMLAH BERAT PANJANG BERAT TOTAL AREA TU
(m) TUMP. LAP. TUMP. LAP. (kg/m) (m) (kg) DIA. (m) JML. TIES

0.010 0.075 0.075 12 23 0.617 1.690 72.932 0.013 1


0.010 0.100 0.100 9 18 0.617 2.090 173.945 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 139.156 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 139.156 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 104.367 0.013 1
0.010 0.000 0.100 0 18 0.617 1.190 184.876
0.010 0.000 0.075 0 23 0.617 1.490 211.275

1,025.71
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG

0.075 12 12 0.486 1.042 12.153 0.010 1 0.075 23


0.100 9 9 1.522 1.042 71.359 0.010 1 0.100 18
0.100 9 9 1.522 1.042 57.087 0.010 1 0.100 18
0.100 9 9 1.522 1.042 57.087 0.010 1 0.100 18
0.100 9 9 1.522 1.042 42.815 0.010 1 0.100 18

240.50
BERAT BERAT TULANGAN UTAMA
EA LAPANGAN BERAT BERAT TOTAL 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)

23 0.450 0.617 12.762 24.914 306.542 - -


18 1.450 0.617 80.453 151.812 847.497 - -
18 1.450 0.617 64.363 121.450 677.997 - -
18 1.450 0.617 64.363 121.450 677.997 - -
18 1.450 0.617 48.272 91.087 508.498 - -
- 474.824 - 289.9
- 882.082 - -

270.21 510.71 4,375.44 - 289.948


BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- 208.7 - 72.932 - - -
- 521.7 - 173.945 - - -
- 417.4 - 139.156 - - -
- 417.4 - 139.156 - - -
- 313.0 - 104.367 - - -
- - - 184.876 - - -
- 670.8 - 211.275 - - -

- 2,549.07 - 1,025.71 - - -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- - 12.153 - - - 12.762
- - 71.359 - - - 80.453
- - 57.087 - - - 64.363
- - 57.087 - - - 64.363
- - 42.815 - - - 48.272
- - - - - - -
- - - - - - -

- - 240.50 - - - 270.21
BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING

(kg) (kg) (kg) (kg) (kg) (kg/m3) (m2/m3)

- - - - 306.542 386.585 11.333


- - - - 847.497 237.510 7.778
- - - - 677.997 237.510 7.778
- - - - 677.997 237.510 7.778
- - - - 508.498 237.510 7.778
- - - - 474.824 380.196 17.778
- - - - 882.082 533.957 12.000

- - - - 4,375.44
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - - 8 - 10 - -
- - - 20 - 24 - -
- - - 16 - 19 - -
- - - 16 - 19 - -
- - - 12 - 15 - -
- 24 - - - 25 - -
- - - 26 - 29 - -

- 24 - 98 - 141 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - 2 - - - 2 -
- - 10 - - - 11 -
- - 8 - - - 9 -
- - 8 - - - 9 -
- - 6 - - - 7 -
- - - - - - - -
- - - - - - - -

- - 34 - - - 38 -
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)

2 - - -
10 - - -
8 - - -
8 - - -
6 - - -
- - - -
- - - -

34 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID B1-B5' & AS 1 - 4"

TINGGI DIMENSI KOLOM


TIPE JUMLAH KOLOM
No. BENTANG GRID - AS LEBAR PANJANG
KOLOM KOLOM
(m) (m) (m)

1 K5-1 1A-(B1-B5') 5 3.080 0.250 0.600


2 K1-1 1A-(B1-B5') 5 3.080 0.450 0.600
3 K1-1 2A-(B1-B5) 5 3.080 0.450 0.600
4 K1-1 3A-(B1-B5) 5 3.080 0.450 0.600
5 K2-2 3A-(B1-B5) 4 3.080 0.400 0.500
6 K3-1 4A-B1 1 3.080 0.300 0.600

JUMLAH 25
0.07
(6*db)+0,075
0.394

FORMWORK CONCRETE TULANGAN UTAMA


TEBAL PLAT
PLYWOOD K-300 DIA. JML BERAT PANJANG BERAT TOTAL
(m) (m2) (m3) (m) (kg/m) (m) (kg)

0.120 22.832 2.015 0.019 14 2.226 3.349 521.739


0.120 28.204 3.626 0.019 14 2.226 3.349 521.739
0.120 28.204 3.626 0.019 14 2.226 3.349 521.739
0.120 28.204 3.626 0.019 14 2.226 3.349 521.739
0.120 19.340 2.149 0.019 10 2.226 3.349 74.534
0.120 4.835 0.484 0.019 10 2.226 3.349 74.534

131.620 15.526 2,236.03


TULANGAN SENGKANG
DIA. JARAK (m) JUMLAH BERAT PANJANG BERAT TOTAL AREA TU
(m) TUMP. LAP. TUMP. LAP. (kg/m) (m) (kg) DIA. (m) JML. TIES

0.010 0.075 0.075 12 23 0.617 1.690 182.330 0.013 1


0.010 0.100 0.100 9 18 0.617 2.090 173.945 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 173.945 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 173.945 0.013 1
0.010 0.100 0.100 9 18 0.617 1.790 238.364 0.010 1
0.010 0.100 0.100 9 18 0.617 1.790 59.591 0.013 1

1,002.12
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG

0.075 12 12 0.486 1.042 30.381 0.010 1 0.075 23


0.100 9 9 1.522 1.042 71.359 0.010 1 0.100 18
0.100 9 9 1.522 1.042 71.359 0.010 1 0.100 18
0.100 9 9 1.522 1.042 71.359 0.010 1 0.100 18
0.100 9 9 0.600 0.617 13.316 0.010 1 0.100 18
0.100 9 9 0.536 1.042 5.026 0.010 1 0.100 18

262.80
BERAT BERAT TULANGAN UTAMA
EA LAPANGAN BERAT BERAT TOTAL 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)

23 0.450 0.617 31.904 62.285 766.354 - -


18 1.450 0.617 80.453 151.812 847.497 - -
18 1.450 0.617 80.453 151.812 847.497 - -
18 1.450 0.617 80.453 151.812 847.497 - -
18 0.600 0.617 26.633 39.949 352.847 - -
18 0.500 0.617 5.549 10.575 144.700 - -

305.44 568.24 3,806.39 - -

1,320.882 249.484
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- 521.739 - 182.330 - - -
- 521.739 - 173.945 - - -
- 521.739 - 173.945 - - -
- 521.739 - 173.945 - - -
- 74.534 - 238.364 - - -
- 74.534 - 59.591 - - -

- 2,236.03 - 1,002.12 - - -

- 2,236.025 -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- - 30.381 - - - 31.904
- - 71.359 - - - 80.453
- - 71.359 - - - 80.453
- - 71.359 - - - 80.453
- 13.316 - - - - 26.633
- - 5.026 - - - 5.549

- 13.32 249.48 - - - 305.44


BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING

(kg) (kg) (kg) (kg) (kg) (kg/m3) (m2/m3)

- - - - 766.354 380.402 11.333


- - - - 847.497 233.711 7.778
- - - - 847.497 233.711 7.778
- - - - 847.497 233.711 7.778
- - - - 352.847 164.199 9.000
- - - - 144.700 299.274 10.000

- - - - 3,806.39
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - - 20 - 25 - -
- - - 20 - 24 - -
- - - 20 - 24 - -
- - - 20 - 24 - -
- - - 3 - 33 - -
- - - 3 - 9 - -

- - - 86 - 139 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - 5 - - - 5 -
- - 10 - - - 11 -
- - 10 - - - 11 -
- - 10 - - - 11 -
- - - - - - 4 2
- - 1 - - - 1 -

- - 36 - - - 43 2
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)

5 - - -
10 - - -
10 - - -
10 - - -
- - - -
1 - - -

36 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID A0-A6' & AS 1A-4A

TINGGI DIMENSI KOLOM


TIPE JUMLAH KOLOM
No. BENTANG GRID - AS LEBAR PANJANG
KOLOM KOLOM
(m) (m) (m)

1 K5-1 1A-(A1-A6) 6 3.080 0.250 0.600


2 K1-1 1A-(A0-A6') 7 3.080 0.450 0.600
3 K1-1 2A-(A0-A6') 7 3.080 0.450 0.600
4 K1-1 2B-(A0) 1 3.080 0.450 0.600
5 K2-1 3A-(A0-A6') 5 3.080 0.400 0.500
6 K1-1 3A-(A0-A6') 6 3.080 0.450 0.600
7 K3-1 (4A-A6) 1 3.080 0.300 0.600
8 KL1 (A5'-A6) Kolom siku 4 3.080 0.150 0.450

JUMLAH 37

OPNAME BESI 11-08-2012

2 K1-1 1A-(A0-A6') 3 3.080 0.450 0.600


1 K5-1 1A-(A1-A6) 1 3.080 0.250 0.600
7 K3-1 (4A-A6) 1 3.080 0.300 0.600
8 KL1 (A5'-A6) Kolom siku 4 3.080 0.150 0.450
9 0.288 0.563
47.124
Decking 754
0.07
(6*db)+0,075
0.398

FORMWORK CONCRETE TULANGAN UTAMA


TEBAL PLAT
PLYWOOD K-300 D JML BERAT PANJANG BERAT TOTAL
(m) (m2) (m3) (m) (kg/m) (m) (kg)

0.120 27.356 2.414 0.019 14 2.226 3.349 626.087


0.120 39.424 5.069 0.019 14 2.226 3.349 730.435
0.120 39.424 5.069 0.019 14 2.226 3.349 730.435
0.120 5.632 0.724 0.019 14 2.226 3.349 104.348
0.120 24.137 2.682 0.019 10 2.226 3.349 74.534
0.120 33.792 4.345 0.019 14 2.226 3.349 626.087
0.120 4.827 0.483 0.019 10 2.226 3.349 74.534
0.120 12.873 0.724 0.013 12 1.042 3.313 41.421

187.466 21.509 3,007.88

0.120 16.896 2.172 0.019 14 2.226 3.349 313.044


0.120 4.559 0.402 0.019 14 2.226 3.349 104.348
0.120 4.827 0.483 0.019 10 2.226 3.349 74.534
0.120 12.873 0.724 0.013 12 1.042 3.313 41.421
TULANGAN SENGKANG
DIA. JARAK (m) JUMLAH BERAT PANJANG BERAT TOTAL AREA TU
(m) TUMP. LAP. TUMP. LAP. (kg/m) (m) (kg) DIA. (m) JML. TIES

0.010 0.075 0.075 12 23 0.617 1.690 218.796 0.013 1


0.010 0.100 0.100 9 18 0.617 2.090 243.524 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 243.524 0.013 1
0.010 0.100 0.100 9 18 0.617 2.090 34.789 0.013 1
0.010 0.100 0.100 9 18 0.617 1.790 297.954 0.010 1
0.010 0.100 0.100 9 18 0.617 2.090 208.735 0.013 1
0.010 0.100 0.100 9 18 0.617 1.790 29.795 0.013 1
0.010 0.000 0.100 0 18 0.617 1.190 105.643

1,382.76

0.010 0.100 0.100 9 18 0.617 2.090 104.367 0.013 1


0.010 0.075 0.075 12 23 0.617 1.690 36.466 0.013 1
0.010 0.100 0.100 9 18 0.617 1.790 29.795 0.013 1
0.010 0.000 0.100 0 18 0.617 1.190 105.643
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG

0.075 12 12 0.486 1.042 36.458 0.010 1 0.075 23


0.100 9 9 1.522 1.042 99.902 0.010 1 0.100 18
0.100 9 9 1.522 1.042 99.902 0.010 1 0.100 18
0.100 9 9 1.522 1.042 14.272 0.010 1 0.100 18
0.100 9 9 0.600 0.617 16.646 0.010 1 0.100 18
0.100 9 9 1.522 1.042 85.630 0.010 1 0.100 18
0.100 9 9 0.536 1.042 5.026 0.010 1 0.100 18

357.84

0.100 9 9 1.522 1.042 42.815 0.010 1 0.100 18


0.075 12 12 0.486 1.042 6.076 0.010 1 0.075 23
0.100 9 9 0.536 1.042 5.026 0.010 1 0.100 18
BERAT BERAT TULANGAN UTAMA
EA LAPANGAN BERAT BERAT TOTAL 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)

23 0.450 0.617 38.285 74.742 919.625 - -


18 1.450 0.617 112.635 212.537 1,186.495 - -
18 1.450 0.617 112.635 212.537 1,186.495 - -
18 1.450 0.617 16.091 30.362 169.499 - -
18 0.600 0.617 33.291 49.937 422.425 - -
18 1.450 0.617 96.544 182.174 1,016.996 - -
18 0.172 0.617 1.908 6.934 111.264 - -
- 147.065 - 41.4

411.39 769.22 5,159.86 - 41.421

18 1.450 0.617 48.272 91.087 508.498 - -


23 0.400 0.617 5.672 11.748 152.562 - -
18 0.450 0.617 4.994 10.020 114.349 - -
- 147.065 - 41.4
- 41.4

335.2 95.3

1,656.1 344.8
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- 626.087 - 218.796 - - -
- 730.435 - 243.524 - - -
- 730.435 - 243.524 - - -
- 104.348 - 34.789 - - -
- 74.534 - 297.954 - - -
- 626.087 - 208.735 - - -
- 74.534 - 29.795 - - -
- - - 105.643 - - -

- 2,966.46 - 1,382.76 - - -

- 313.044 - 104.367 - - -
- 104.348 - 36.466 - - -
- 74.534 - 29.795 - - -
- - - 105.643 - - -
- 491.9 - 276.3 - - -

- 491.9 -

- 2,728.0 -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)

- - 36.458 - - - 38.285
- - 99.902 - - - 112.635
- - 99.902 - - - 112.635
- - 14.272 - - - 16.091
- 16.646 - - - - 33.291
- - 85.630 - - - 96.544
- - 5.026 - - - 1.908
- - - - - - -

- 16.65 341.19 - - - 411.39

- - 42.815 - - - 48.272
- - 6.076 - - - 5.672
- - 5.026 - - - 4.994
- - - - - - -
- - 53.9 - - - 58.9
BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING

(kg) (kg) (kg) (kg) (kg) (kg/m3) (m2/m3)

- - - - 919.625 380.997 11.333


- - - - 1,186.495 234.077 7.778
- - - - 1,186.495 234.077 7.778
- - - - 169.499 234.077 7.778
- - - - 422.425 157.508 9.000
- - - - 1,016.996 234.077 7.778
- - - - 111.264 230.480 10.000
- - - - 147.065 203.094 17.778

- - - - 5,159.86

- - - - 508.498 234.077 7.778


- - - - 152.562 379.235 11.333
- - - - 114.349 236.873 10.000
- - - - 147.065 203.094 17.778
- - - - 922.5
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - - 24 - 30 - -
- - - 28 - 33 - -
- - - 28 - 33 - -
- - - 4 - 5 - -
- - - 3 - 41 - -
- - - 24 - 29 - -
- - - 3 - 5 - -
- 4 - - - 15 - -

- 4 - 114 - 191 - -

- - - 12 - 15 - -
- - - 4 - 5 - -
- - - 3 - 5 - -
- 4 - - - 15 - -
0
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)

- - 5 - - - 6 -
- - 14 - - - 16 -
- - 14 - - - 16 -
- - 2 - - - 3 -
- - - - - - 5 3
- - 12 - - - 14 -
- - 1 - - - 1 -
- - - - - - - -

- - 48 - - - 61 3

- - 6 - - - 7 -
- - 1 - - - 1 -
- - 1 - - - 1 -
- - - - - - - -
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)

5 - - -
14 - - -
14 - - -
2 - - -
- - - -
12 - - -
1 - - -
- - - -

48 - - -

6 - - -
1 - - -
1 - - -
- - - -
KEBUTUHAN BAHAN
PROYEK HARRIS SEMINYAK

CONCRETE K-300
NO. ITEM JUMLAH KOLOM
(m3) D10

1 KOLOM GROUND 173 105.136 9,368.37

KONTROL 123.662 9,148.48

18.526 (219.89)
REBARS (kg) REBARS (btg)
D13 D16 D19 Dia. 22 TOTAL D10 Dia. 13

2,174.44 3,238.38 10,360.25 - 25,141.45 1,267 174

3,083.06 13,352.21 25,583.75 1,237 247

908.62 (3,238.38) 2,991.96 442.31 (30) 73


REBARS (btg) FORMWORK (m2) GALIAN LC SAND BED
Dia. 16 Dia. 19 Dia. 22 PLYWOOD (m3) (m3) (m3)

171 388 - 892.68 - - -

- 500 - 1,083.80

(171) 113

Das könnte Ihnen auch gefallen