Beruflich Dokumente
Kultur Dokumente
2. BORED PILE PC.1A' 3 4.43 Tabung 1.00 41.769 10.442 0.016 20 1.578 4.430 419.50
POT. 1 1.00 0.010
POT. 2 3.43 0.010
3. BORED PILE PC.1B 108 4.43 Tabung 0.60 902.201 135.330 0.016 12 1.578 4.430 9,061.12
POT. 1 1.00 0.010
POT. 2 3.43 0.010
4. BORED PILE PC.1C 62 4.43 Tabung 0.40 345.287 34.529 0.013 8 1.042 4.430 2,289.31
POT. 1 1.00 0.010
POT. 2 3.43 0.010
5. BORED PILE (Ø 800) PC.2G 3 4.43 Tabung 0.80 33.415 5.778 0.016 12 1.578 4.430 251.70
POT. 1 1.00 0.010
POT. 2 3.43 0.010
BORED PILE
BORED PILE (Ø 1000) PC.2G 3 4.43 Tabung 1.00 41.769 9.028 0.016 20 1.578 4.430 419.50
POT. 1 1.00 0.010
POT. 2 3.43 0.010
5. BORED PILE (Ø 800) PC.2G* 2 4.43 Tabung 0.80 22.277 3.852 0.016 12 1.578 4.430 167.80
POT. 1 1.00 0.010
POT. 2 3.43 0.010
BORED PILE (Ø 1000) PC.2G* 2 4.43 Tabung 1.00 27.846 6.019 0.016 20 1.578 4.430 279.66
POT. 1 1.00 0.010
POT. 2 3.43 0.010
BORED PILE
364.00
- - 419.5 419.50 - - 23
0.617 0.100 4 3.019 22.33 22.3 - - 22.33 4 - -
0.617 0.200 15 3.024 83.89 83.9 - - 83.89 12 - -
- - 251.7 251.70 - - 14
0.617 0.100 4 2.391 17.69 17.69 - - 17.69 3 - -
0.617 0.200 15 2.397 66.50 66.50 - - 66.50 9 - -
BORED PILE
- - 419.5 419.50 - - 23
0.617 0.100 4 3.019 22.33 22.33 - - 22.33 4 - -
0.617 0.200 15 3.024 83.89 83.89 - - 83.89 12 - -
- - 167.8 167.80 - - 9
0.617 0.100 4 2.391 11.79 11.79 - - 11.79 2 - -
0.617 0.200 15 2.397 44.33 44.33 - - 44.33 6 - -
- - 279.7 279.66 - - 15
0.617 0.100 4 3.019 14.89 14.89 - - 14.89 3 - -
0.617 0.200 15 3.024 55.92 55.92 - - 55.92 8 - -
BORED PILE
Selimut Beton = 0.07
Tekukan = (6*db)+0,075
PROYEK HARRIS SEMINYAK T. balok Rata-Rata = 0.417
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID D1-D12 & AS 1 - 4"
JUMLAH 81
972 3.234 4 4
3.234 4 4
3.234 4 4
3.234 4 4
1.848 4 4
3.234 4 4
FORMWORK CONCRETE TULANGAN UTAMA
TEBAL PLAT
PLYWOOD K-300 D. JML BERAT PANJANG BERAT TOTAL
(m) (m2) (m3) (m) (kg/m) (m) (kg)
3 24 1944
3 24
3 24
3 24
3 24
3 24
144
TULANGAN SENGKANG
D JARAK (m) JUMLAH BERAT PANJANG BERAT TOTAL AREA TU
(m) TUMP. LAP. TUMP. LAP. (kg/m) (m) (kg) D (m) JML. TIES
3,690.17
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG
1,024.11
BERAT TULANGAN UTAM
BERAT TOTAL
EA LAPANGAN BERAT BERAT 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)
4,940.773 1011.900
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
1,619.2 - - 765.360 - - -
- 1,252.2 - 417.469 - - -
- 1,252.2 - 417.469 - - -
1,619.2 - - 765.360 - - -
- - - 422.574 - - -
- 104.3 - 901.940 - - -
3,238.38 2,608.70
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- - 313.978 - - - 353.994
- - 171.261 - - - 193.088
- - 171.261 - - - 193.088
- - 313.978 - - - 353.994
- - - - - - -
- 53.636 - - - - 102.801
- - - - 11,799.75
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - 86 - - 104 - -
- - - 47 - 57 - -
- - - 47 - 57 - -
- - 86 - - 104 - -
- 4 - - - 58 - -
- - - 4 - 122 - -
- 4 172 98 - 502 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - 43 - - - 48 -
- - 24 - - - 27 -
- - 24 - - - 27 -
- - 43 - - - 48 -
- - - - - - - -
- - - - - - 14 8
- - 134 - - - 164 8
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)
43 - - -
24 - - -
24 - - -
43 - - -
- - - -
- - - -
134 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID-AS (C1-C3' )-(1-4")
JUMLAH 30
0.07
(6*db)+0,075
0.437
1,025.71
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG
240.50
BERAT BERAT TULANGAN UTAMA
EA LAPANGAN BERAT BERAT TOTAL 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)
- 208.7 - 72.932 - - -
- 521.7 - 173.945 - - -
- 417.4 - 139.156 - - -
- 417.4 - 139.156 - - -
- 313.0 - 104.367 - - -
- - - 184.876 - - -
- 670.8 - 211.275 - - -
- 2,549.07 - 1,025.71 - - -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- - 12.153 - - - 12.762
- - 71.359 - - - 80.453
- - 57.087 - - - 64.363
- - 57.087 - - - 64.363
- - 42.815 - - - 48.272
- - - - - - -
- - - - - - -
- - 240.50 - - - 270.21
BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING
- - - - 4,375.44
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - - 8 - 10 - -
- - - 20 - 24 - -
- - - 16 - 19 - -
- - - 16 - 19 - -
- - - 12 - 15 - -
- 24 - - - 25 - -
- - - 26 - 29 - -
- 24 - 98 - 141 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - 2 - - - 2 -
- - 10 - - - 11 -
- - 8 - - - 9 -
- - 8 - - - 9 -
- - 6 - - - 7 -
- - - - - - - -
- - - - - - - -
- - 34 - - - 38 -
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)
2 - - -
10 - - -
8 - - -
8 - - -
6 - - -
- - - -
- - - -
34 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID B1-B5' & AS 1 - 4"
JUMLAH 25
0.07
(6*db)+0,075
0.394
1,002.12
TULANGAN TIES
AREA TUMPUAN BERAT AREA LAPANGAN
JARAK Σ BENTANG Σ TOTAL PANJANG BERAT TUMP. DIA. (m) JML.TIES JARAK Σ BENTANG
262.80
BERAT BERAT TULANGAN UTAMA
EA LAPANGAN BERAT BERAT TOTAL 10 13
Σ TOTAL PANJANG BERAT LAP. TIES (kg) (kg) (kg)
1,320.882 249.484
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- 521.739 - 182.330 - - -
- 521.739 - 173.945 - - -
- 521.739 - 173.945 - - -
- 521.739 - 173.945 - - -
- 74.534 - 238.364 - - -
- 74.534 - 59.591 - - -
- 2,236.03 - 1,002.12 - - -
- 2,236.025 -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- - 30.381 - - - 31.904
- - 71.359 - - - 80.453
- - 71.359 - - - 80.453
- - 71.359 - - - 80.453
- 13.316 - - - - 26.633
- - 5.026 - - - 5.549
- - - - 3,806.39
JUMLAH TULANGAN UTAMA JUMLAH TULANGAN SENGKANG
Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10 Dia.13 Dia.16
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - - 20 - 25 - -
- - - 20 - 24 - -
- - - 20 - 24 - -
- - - 20 - 24 - -
- - - 3 - 33 - -
- - - 3 - 9 - -
- - - 86 - 139 - -
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - 5 - - - 5 -
- - 10 - - - 11 -
- - 10 - - - 11 -
- - 10 - - - 11 -
- - - - - - 4 2
- - 1 - - - 1 -
- - 36 - - - 43 2
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)
5 - - -
10 - - -
10 - - -
10 - - -
- - - -
1 - - -
36 - - -
Selimut Beton =
Tekukan =
PROYEK HARRIS SEMINYAK T. balok Rata-Rata =
Item : Kolom (Ground)
Building : Area Hotel
MEASUREMENT SHEET KOLOM GRID A0-A6' & AS 1A-4A
JUMLAH 37
1,382.76
357.84
335.2 95.3
1,656.1 344.8
BERAT TULANGAN UTAMA BERAT TULANGAN SENGKANG
16 19 22 10 13 16 19
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- 626.087 - 218.796 - - -
- 730.435 - 243.524 - - -
- 730.435 - 243.524 - - -
- 104.348 - 34.789 - - -
- 74.534 - 297.954 - - -
- 626.087 - 208.735 - - -
- 74.534 - 29.795 - - -
- - - 105.643 - - -
- 2,966.46 - 1,382.76 - - -
- 313.044 - 104.367 - - -
- 104.348 - 36.466 - - -
- 74.534 - 29.795 - - -
- - - 105.643 - - -
- 491.9 - 276.3 - - -
- 491.9 -
- 2,728.0 -
ANG BERAT TULANGAN TIES TUMPUAN BERAT TUL
22 10 13 16 19 22 10
(kg) (kg) (kg) (kg) (kg) (kg) (kg)
- - 36.458 - - - 38.285
- - 99.902 - - - 112.635
- - 99.902 - - - 112.635
- - 14.272 - - - 16.091
- 16.646 - - - - 33.291
- - 85.630 - - - 96.544
- - 5.026 - - - 1.908
- - - - - - -
- - 42.815 - - - 48.272
- - 6.076 - - - 5.672
- - 5.026 - - - 4.994
- - - - - - -
- - 53.9 - - - 58.9
BERAT TULANGAN TIES LAPANGAN RASIO
BERAT TOTAL RASIO BESI
13 16 19 22 BEKISTING
- - - - 5,159.86
- - - 24 - 30 - -
- - - 28 - 33 - -
- - - 28 - 33 - -
- - - 4 - 5 - -
- - - 3 - 41 - -
- - - 24 - 29 - -
- - - 3 - 5 - -
- 4 - - - 15 - -
- 4 - 114 - 191 - -
- - - 12 - 15 - -
- - - 4 - 5 - -
- - - 3 - 5 - -
- 4 - - - 15 - -
0
ULANGAN SENGKANG JUMLAH TULANGAN TIES TUMPUAN JUMLAH TULANG
Dia.19 Dia.22 Dia.10 Dia.13 Dia.16 Dia.19 Dia.22 Dia.10
(btg) (btg) (btg) (btg) (btg) (btg) (btg) (btg)
- - 5 - - - 6 -
- - 14 - - - 16 -
- - 14 - - - 16 -
- - 2 - - - 3 -
- - - - - - 5 3
- - 12 - - - 14 -
- - 1 - - - 1 -
- - - - - - - -
- - 48 - - - 61 3
- - 6 - - - 7 -
- - 1 - - - 1 -
- - 1 - - - 1 -
- - - - - - - -
JUMLAH TULANGAN TIES LAPANGAN
Dia.13 Dia.16 Dia.19 Dia.22
(btg) (btg) (btg) (btg)
5 - - -
14 - - -
14 - - -
2 - - -
- - - -
12 - - -
1 - - -
- - - -
48 - - -
6 - - -
1 - - -
1 - - -
- - - -
KEBUTUHAN BAHAN
PROYEK HARRIS SEMINYAK
CONCRETE K-300
NO. ITEM JUMLAH KOLOM
(m3) D10
18.526 (219.89)
REBARS (kg) REBARS (btg)
D13 D16 D19 Dia. 22 TOTAL D10 Dia. 13
- 500 - 1,083.80
(171) 113