This Quick Setup Guide contains the basic information required to get your new tekmar tN4 Wiring Center 315 installed
and operational. An Installation and Operation Manual D 315 containing all available features and operational details is
included with this control or can be found at www.tekmarcontrols.com/literature.html
Basic Installation
The tN4 Wiring Center 315 is designed to be mounted near a zone manifold and will operate up to 6 zone valves in a
hydronic heating system.
Control Location
• The Wiring Center can be mounted either directly to the wall,
or to a 4”x4” electrical box.
• Mount the enclosure to a solid backing.
• Wiring will enter through either side knockouts or between the
base of the enclosure and the cover on the sides and top. See
Figure 1 and Figure 2.
Note: The nonmetallic enclosure does not provide grounding
between conduit connections. Conduit connections must be
grounded by other means.
Figure 1
Wire the Thermostats
tN4 Thermostats:
• Connect tN4, C, R and W conductors to the corresponding OUTDOOR
F
terminals on the 315, paying special attention to ensure that the FLOOR
F
tN4 and C wires are not reversed. See the terminal labelling in HEAT
Figure 2.
Zone 2
Zone 1
End Switch
• Wire the zone valves to the Vlv and C terminals on the 315,
C tN4
C tN4 C tN4 X
Zone 3
tN4 C R W
Zone 5
Zone 4
Input Power
: 24 V (ac)
Expansion End Switch Input Power
Zone 5
R
±10% 60
2 VA (98 Hz
VA max)
W
Zone 6
End Switch Class 2
:
as shown in Figure 3.
Zone Outpu 24 V (ac) 2 A
C tN4
t: 2 A per
zone
Zone 6
4 A (max)
total
X
Six Zone
ing Cen tektra 1032-0a
ter 315
W
Valv 1
C
es
Figure 2
Use at least 167°F
(75°C) conductors
• End switches on zone valves are not required when using Zone 1
C Vlv
Zone 2
C Vlv
Zone 3
C Vlv
Zone 4
C Vlv
Zone 5
C Vlv
Zone 6
C Vlv
the 315.
External tN4
Connection (ie:
Zone Manager or
Reset Module)
R C tN4
W
Zone 1 Power
Zone 5
R C tN4 C tN4 X X R C
Zone 1
Zone 2 End Switch
Call for heat to directly Zone 3
enable a boiler control Input Power: 24 V (ac) ±10% 60 Hz
R C tN4 W
Zone 4 2 VA (98 VA max)
Expansion End Switch
Zone 5 Class 2
End Switch: 24 V (ac) 2 A
T Zone 6
Zone 6
Zone Output: 2 A per zone
T 4 A (max) total
Made in Canada
W
tektra 1032-01
C tN4 X X R C
Boiler
tekmar
Transformer 009
24 V (ac)
R
L
N C
tekmar Control Systems Ltd., Canada, tekmar Control Systems, Inc., U.S.A.
Head Office: 5100 Silver Star Road, Vernon, B.C. Canada V1B 3K4, 250-545-7749, Fax. 250-545-0650 Web Site: www.tekmarcontrols.com
Product design, software and literature are Copyright © 2009 by: All specifications are subject to change without notice.
tekmar Control Systems Ltd. and tekmar Control Systems, Inc.
2 of 2 Printed in Canada. Q 315 - 04/09.