Sie sind auf Seite 1von 4

House#10 Lane#4 Chaklala Scheme-1 Cell: +92-333-9409853

Rawalpindi Cantt-
Email: saafridi_2002@hotmail.com
Aks4shah@yahoo.com

Engr. Shahalam Afridi

Experience

Jan2010 till Nov2016 SPD(Strategic Plans Division)


SO-III/Deputy Assistant Director (Works & Maintenance) SPS-08

 Contract’s Management and Project Control as an Engineer In-


Charge
 Projects estimation ,feasibility & Approval
 Delivering the Project from inception to Completion
 Dealing with all contractors and superiors as Department Head
 Assurance of Quality as defined in technical specifications.
 Top supervision on contractor’s & supervisory staff
 Tendering/Bidding & award of Works
 Presenting the Monthly Progress Reports in Quarterly
Progress review meetings.
 Approval of Interim Payment Certificate
 Ensuring the completion of project with in approved timeline and
budget
 Addendum Approval
 Variation orders Approval
 Rate Analysis Approval
 Tech Check of Construction Drawings
 Review/Tech Check of Geo-Technical Site Investigation Report
 Appropriate site selection for the Buildings by keeping in view both
economy and safety factors in line with Geo-Technical Site
Investigation Report
 Handing-Taking proceedings/Approval of Completed Works
 Maintenance of Handed over works
 Escalation Claims Approval

Aug 2006 -- Dec 2009 Associated Consulting Engineers (ACE-Arts)

Project Engineer Capt- Karnal Sher Khan SH(NH) Cadet College Swabi

Engr. Shahalam Afridi -1-


 Site supervision.
 Quality control.
 Checking Surveys
 IPC’s checking. (Running Bills)
 Dealing with BOQs
 Quantities Computation & Verification
 Variation orders Preparation & Approval
 Addendums Approval
 Rate Analysis Preparation
 Bar-bending Schedule Approval and Checking on Site as per
Structural Design
 Progress Report Preparation
 Check of As-Built Dwgs

12th Dec 05 – July06 International Medical Corps(IMC/USA NGO)


Watsan Engineer NWFP Earthquake Affected Areas

 Managing Water Supply & Sanitation Schemes in Earth Quake


affected Areas Undertaken by IMC
 Preparation of Initial & Detail Assessment Reports for
rehabilitation and restoration of above Schemes
 Supervision of above Schemes by making frequent and long
distant visits to sites
 Representation of Organization in Cluster Meetings held under
umbrella of Unicef for detail description of the current status of all
Watsan sites undertaken by IMC
 Requisition of materials required for Schemes as per Detail
Assessment Report
 Maintaining Logistic Record of all the materials Pro-cured/not Pro-
cured as per requisitions and supplied to sites in Collaboration with
Logistic Officer
 Supply of Material to Sites As per Detail Assessment
 Progress Report Preparation of all the Schemes
 Dealing with the Communities for motivating and encouraging
them to help themselves for the Restoration of Watsan Schemes
 Involving the Community to work for their selves by giving them
incentives like cash for work and Hygiene Kits Supplied through our
Hygiene Promotion Team .

Aug 2005 –11 Dec 2005 Associated Consulting Engineers(ACE-Arts)


Site Engineer NWFP Assembly Building Project,Peshawar
 Site supervision.
 Check Survey.
 Quality control.
 IPC’s checking.

Engr. Shahalam Afridi -2-


 Bar-Bending Schedule Checking and Approval
 Quantities Computation & Verification
 Preparation of As Built Drawings

Qualifications 2014-2016 M.Sc Geotechnical Engineering from NUST Islamabad


(CGPA = 3.25)

2001-2005 BSc. Civil Engineering from NWFP University of


Engineering & Technology Peshawar with honors(securing 72% Agg- marks)

1998-2000 F.Sc (Pre engineering) from PAF Inter College Kohat

1996-1998 S.S.C ( Science Group) from FG Boys High School Kohat

Professional Member Pakistan Engineering Council as a Professional Engineer


Affiliation CIVIL/26835

Specific Assignment
 Contract’s Management and Construction Supervision of buildings,
roads and services projects.
 Variation Orders and rate analysis.
 Landscaping
 Quality Control
 Project Management
 IPC Checking
 External/Internal Electrification, IT & Tel Sys
 Addendum Preparation/Approval
 Preparation of Bill of Quantities.
 Slope Stability/Treatment
 Storm Water Drainage
 Sewerage System
 Tuff Paver Parkings/Tracks
 Erection of Pre-Fab Steel Structure

Engr. Shahalam Afridi -3-


Computer skills/Courses
 Experienced user of Computer Application Software including
Operating Systems (MS DOS, MS Windows), Microsoft Office (MS
Excel, MS Word, MS Power Point)
 Plotting of drawings by using AutoCAD
 MS Project 2000
 AutoCAD 2000
 Sap 2000
 Phase-2 (Flow net/Seepage analysis Software)
 Slide-6 (Slope Stability Software)
 Geotechnical Site Investigation
 Design of Earth Dams

Seismic Design of Buildings by using provisions of NEHRP (National


Final Year Project Earthquake Hazard Reduction Program) Code published by Federal
Emergency Management Agency(USA).

Read Write Speak Understand


Lingual Ability
English: Excellent Excellent Good Excellent

Urdu: Excellent Excellent Excellent Excellent

Pashto: Good Good Excellent Excellent

Engr. Shahalam Afridi -4-

Das könnte Ihnen auch gefallen