I. General Requirements
Mobilization / Demobilization
Temporary Facilities
Personal Protective Equipment
Demolition Works
Safety and Health
II. Escavation Works
Excavation
Backfilling of Excavated Materials
Gravel Bedding @ SOF, CF & WF, FTB and Trench
Embankment
Soilpoisoning
III. Renforced Concrete Works
Cement, Portland
Sand, Washed
Gravel
Coco Lumber
Assorted CW Nails
Ordinary Plywood
IV. Reinforced Bars
Deformed Round Bars
# 16 Tie Wire G.I.
V. Masonry Works
CHB 6"
CHB 4"
Cement, Portland
Sand, Washed
Deformed Round Bars
# 16 Tie Wire G.I.
Concrete Louver Block
VI. Steel Trusses and Framing Works
Top Chord
Bottom Chord
Web Members
Plate
Purlins and Channel Beam including Ceiling Support
and Connections(base plate, bolts & angle cleats)
Sog Fod
Cross Bracing
Angular Base Plate
Anchor Bolt with Nuts and Washer
Welding Rod
Prime, Zinc Chromate
Flat Bar
Turn Buckle
VII. Fire Escape & Steel Railings (Stair, Ramp & Rail Guard)
Ramp
GI Pipe
Vert. Support
Stair
GI Pipe
Square Bar
Angular Bar
Flat Bar Strap
Fire Escape
Square Bar
Checkered Plate
Steel Channel
Angle Bar
GI Pipe
Spider Plate
Blind Flange
Gusset Plate
nosing Angle
Base Plate
Anchor Nolth with Nuts and Washer
Welding Rod
VIII. Cement Plaster Finish
Cement, Portland
Sand, Washed
IX. Carpentry Works
Fiber Cement Board
Wall Angle
Ceiling Vent
Blackboard with Chalk Box
Concrete Nails
Rod Suspension Hanger with Adjustment Spring
Metal Carrying Channel
Metal Double Furring Channedl
W-Clip
Pand head Screw
Hardiflex Screw
Rivet
Insulation Foam
Ordinary Plywood
Rough Lumber
Assorted CW Nails
X. Doors and Windows