Sie sind auf Seite 1von 27

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED

CIN-U40109MP2001SGC014880, Email-mdtransco.nic.in
STATE LOAD DESPATCH CENTRE, Nayagaon, Rampur, Jabalpur vkbZ ,l vks : 9001-2008
Telephone: (0761) 2970089 Fax: (0761) 2664343 e-mail sldcmpjbp@gmail.com ISO: 9001-2008

No.07-05/SG-11/DSM/1741 Jabalpur, dtd: - 03/07/2019

As Per Distibrution List

Sub: DSM Account for the month of April, 2019 on the basis of MPERC BSC 2015.

In pursuance to MPERC Balancing & Settlement Code, 2015 (BSC), the State DSM Accounts are issued by SLDC.
After issue of fourth amendment of CERC (Deviation Settlement Mechansim and related matters) Regulations, 2014,
practical difficulties were observed in maintaining deviation sign change after every six-time block simultaneously for Intra-
state entities at Intra-state level. In view of above, SLDC has filed a petition bearing No. 16/2019 before the Hon’ble
MPERC wherein it is proposed that deviation sign change may not be made applicable for Intra-state entities. Further, it has
also been requested to amend procedure for Imbalance Settlement of Deviation Charges of Intra-state entities wherein
adjustment of cap amount and additional charges is proposed. Hon’ble MPERC is prayed that pending final adjudication of
the petition, SLDC be allowed to issue State DSM Accounts from January,2019 onwards without computation of deviation
sign change violation charges for Intra-state entities.

The State DSM Accounts for the month of April 2019 has been prepared in accordance with methodology proposed
in Petition No. 16/2019. However, final decision of Hon’ble Commission in the matter shall be binding on all concerned and
the State DSM Accounts shall be revised accordingly, if required. The DSM Accounts for all the Intra State entities including
Inter State Open Access Customers embedded in the State system are uploaded on SLDC website.

The DSM charges of Discoms are computed on the basis of block-wise implemented schedules
issued by WRLDC / Ex-Post facto revisions made by WRPC for Inter State Generating Stations (ISGS) and
implemented schedules issued by SLDC for SSGS. There is a difference of 0.07 MU in the implemented
schedules of WRLDC / Ex-Post facto revisions of WRPC and monthly REA of WRPC for the month of April,
2019.

The scheduling of power under Long Term Access (LTA) from Ratnagriri Gas & Power Pvt. Ltd. (85MW), BRBCL
(50MW), under medium term open access from M/s Jindal India Thermal Power Ltd. (144.6MW) and from MPPMCL (Upto
235MW as & when required) is being done to 47 Nos Railway TSS points in M.P. in accordance with CERC order dated 05-
11-2015 in petition no. 197/MP/2015 considering Railways as a deemed licensee. Accordingly, the deviation charges are
computed for imbalance settlement.

As per Clause 7.12 & 7.13 of the BSC, payment to the DSM Account shall be made within 10 days from the date of
issue of this statement. Payments are to be made on the basis of this account only and no further invoicing is required by
SLDC. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. The settlement of
Deviation Charges shall be done through State Pool Account maintained by SLDC w.e.f. 1st Sept 2018 as per clause 7.11 of
BSC. General notes on DSM account for the month of April, 2019 alongwith Deviation Charges summary and Deviation
Charges bills of all the State entities are uploaded on SLDC website.

In accordance with MPERC Balancing & Settlement Code 2015 (BSC), Discom Energy Accounting Group (DEAG)
has started the deviation settlement, energy settlement of Open Access Customers including CPPs embedded in Discoms
w.e.f. July 2016. As such, the deviation charges of Discom embedded Open Access Customers including CPPs drawing /
injecting power through 33KV networks of Discoms has not been computed and uploaded on SLDC website.

The signed copy of the above DSM account alongwith block-wise details are available on SLDC website
www.sldcmpindia.com which may please be downloaded for further needful. The verification, if required, can be done at
SLDC.

All the Intra State entities are requested to check and verify the State DSM Account and intimate the
discrepancies observed if any within a period of 15 days.

Chief Engineer (LD)


SLDC MPPTCL, Jabalpur

-1-
Distribution List

1. The Chief General Manager (Comml), MPPMCL, Jabalpur.


2. The Chief General Manager (Comml.), MPPuKVVCL, Jabalpur.
3. The Chief Engineer (Gen.) STPS/SGTPS/ATPS, Sarni/Birsingpur/Chachai. Fax 07659-263283/ 07146-
278908/07655-262232.
4. The Chief General Manager (Comml.), MPMKVVCL, Govindpura, Bhopal. Fax- 0755-2588315.
5. The Chief Electrical Distribution Engineer, West Central Railway, Jabalpur – 482001, M.P., Email –
cede@wcr.railnet.gov.in, Fax- 0761-2627629.
6. The Chief Engineer (JR), MPPuKVVCL, Rampur, Jabalpur.
7. The Chief General Manager (BR), MPMKVVCL, Nishta Parisar, Govindpura, Bhopal. Fax: 0755-2600004.
8. The Chief General Manager (GR), MPMKVVCL, Motijheel, A.B. Road, Gwalior – 474010, Fax: 0751-
2448280.
9. The Chief Engineer (IR), MPPaKVVCL, Polo Ground, GPH Compound, Indore. Fax:0731- 2424234.
10. The Chief Engineer (UR), MPPaKVVCL, Jyoti Nagar, Ujjain. Fax:0734-2530149.
11. The Chief Engineer (RR), MPPuKVVCL, Arjun Nagar, Rewa (MP)- 486001. Fax:0766-2257302.
12. The Chief Engineer (CS), MPPGCL, Jabalpur.
13. The Chief Financial Officer, MPPTCL, Jabalpur.
14. The Chief Engineer (Comml.), MPPaKVVCL, GPH Compound, Polo Ground, Indore.
15. The Suptdg. Engineer (GCC), MPPGCL, Jabalpur.
16. The Staff Officer to MD MPPuKVVCL/MPPaKVVCL/MPMKVVCL, Jabalpur / Indore/ Bhopal.
17. The Staff Officer to MD, MPPGCL/MPPTCL/ MPPMCL, Jabalpur.
18. The Discom Control Centre, MPPuKVVCL / MPPaKVVCL/ MPMKVVCL, Jabalpur/ Indore/ Bhopal. Fax:
0761-2668503/ 0731-2421554 /0755-258061.
19. The Chief Engineer (O&M), Indira Sagar Project, NHDC Office Complex, Narmada Nagar, Distt-
Khandwa- 450119 (M.P), Fax No. 07323-284035.
20. The Chief Engineer, NHDC, NHDC Parisar, Shamla Hills, Near Ashoka Hotel, Bhopal-462013, Fax. No.
0755-4030188 / 4030130 / 4030027.
21. The Managing Director, MP Audyogic Kendra Vikas Nigam (Indore) Ltd., Free Press House, First Floor,
3/54, Press Complex, Agra-Mumbai Road, Indore – 452018, Fax. 0731-2572629.
22. M/s BLA Power Private Limited, Village Niwari, PO Khursipar, Tehsil Gadarwara, Narsinghpur - 487551.
Fax. 07791-243667
23. M/s Jaypee Bina Thermal Power Plant, Village-Sirchopi, Sub Post Office-Agasod, Post Office-Bina,
Tehsil-Bina, District- Sagar (MP) –470113 Fax : 07580-277235.
24. M/s Prism Johnson Limited,Unit-II ,Vill.- Mankahari,P.O.- Bathia, dist. Satna-485111 (MP) . Tel 07672-
275301, Fax- 402710,Email- info@prismjohnson
25. M/s Prism Johnson Limited,Unit-I ,Vill.- Mankahari,P.O.- Bathia, dist. Satna-485111 (MP) . Tel 07672-
275301, Fax- 402710, Email- info@prismjohnson
26. The Chief Engineer(PP), Maharashtra State Electricity Distribution Co. Ltd. , 5th Floor, Prakashgad,
Plot No.G-9, Bandra(East), Mumbai-400051, Email: ceppmsedc@gaimail.com.
27. M/s Bhilai Jaypee Cement Plant(Clinkerization) Birhauli Raghuraj Nagar,Satna,M. P.- 485 112

……

-2-
No.07-05/SG-11/DSM/1741 Jabalpur, dtd: 03/07/2019

GENERAL NOTES ON DSM ACCOUNT FOR THE MONTH April,2019

1. DSM rates as per CERC (Deviation Settlement Mechanism and related matters) (Fourth Amendment)
Regulations 2018 dated 20.11.2018 applicable w.e.f. 01.01.2019.

Average Frequency of time block (Hz) DSM Rate (paise / KWh)


50.05 Hz and above 00.00
Below 50.05 Hz and upto 50.01 Hz Slope determined by joining the price at
Not Below 50.05 Hz and identified price
at 50.00 Hz.
Below 50.01 Hz and upto 50.00 Hz Daily (simple) average Area Clearing
Price discovered in the Day Ahead
Market segment of power exchange
Below 50.00 Hz and upto 49.85 Hz Slope determined by joining the price
identified at 50.00 Hz and price at below
49.85 Hz.
Below 49.85 Hz 800.00

2. Capping of Deviation rate for generators and applicability of Deviation charges and additional Deviation
charges for over drawal or under injection of electricity for each time block as per Central Electricity
Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations 2014 and
subsequent amendments.
(i) The Cap Rate for the charges for deviation for the generating stations whose tariff is
determined by the Commission shall be equal to its energy charges as billed for the previous
month. The charges for other generating stations irrespective of the fuel source shall not
exceed Cap Rate of 303.04 Paise / Kwh
(ii) The charges for deviation for the over injection by the seller or under drawal by the buyer in
a time block in excess of 48MW shall be Zero for the utilities having schedules of 400MW or
below. The charges for deviation for the over injection by the seller or under drawal by the
buyer in a time block in excess 12% of the schedule or 150 MW whichever is less shall be
Zero for the utilities having schedules above 400MW.
(iii) The additional Deviation Charge for under injection / over drawal of electricity for each time
block when grid frequency is below 49.85 Hz shall be equivalent to 100% of the charges for
deviation of 800.00 Paise/Kwh corresponding to the grid frequency of “below 49.85Hz.
Additional charges for Deviation shall also be applicable for over-drawal as well as under –
injection of electricity for each time block in excess of the following volume limits when the
grid ferquency is 49.85Hz and above.
- 48 MW for the utilities having schedule less than or equal to 400MW.
- 12% of schedule or 150MW whichever is less for the utilities having schedules
above 400MW.
(iv) The additional charges for Deviation shall also be appicable for over-injection / under drawal
of electricity for each time block by a seller/buyer as the case may be when grid frequency
is 50.05 Hz and above at the ACP rate discovered in the Day Ahead Market segment of
power exchange in accordance with the methodology specified in CERC (Deviation
Settlement Mechanism and related matters) (Fourth Amendment) Regulations 2018.
(v) The State DSM Accounts have been prepared in accordance with methodology proposed in
Petition No. 16/2019. The final decision of Hon’ble Commission in the matter shall be
binding on all concerned and the State DSM Accounts shall be revised accordingly, if
required.

3. Deviation suspension for the month due to transmission constraints – Nil.

4. Deviation suspension for the month due to grid disturbance – Nil.

5. Deviation reduction in respect of MPPGCL Thermal Stations – Nil.

-3-
6. An actual MPPTCL transmission loss for the month of February,2019 has been worked out as 2.48%.
The same has been considered for scheduling for the month of April,2019.

7. The schedule energy of chambal complex have been computed considering 50% sent out of
Gandhisagar HPS, RPS HPS, JS HPS & Excess / less drawal by MP after apportioning MP loss and
credited to each Discom as per capacity allocation. The actual ABT meter data of RPS HPS & JS HPS
was not made available to SLDC, thus, monthly sent out as per JMR data has been equally distributed
in 15 min. time blocks for complete month. As per the directive issued, the energy supplied to
Rajasthan area from 33KV Kuakheda feeder is added to West Discom drawl for issuance of energy bills
to Rajasthan w.e.f July 2017.

8. As per Clause 7.9 of the MPERC Balancing & Settlement Code 2015, DSM shall not be applied to
multipurpose Hydro Power Stations of MPPGCL. Accordingly the Generation Schedules of these Hydro
Generators have been replaced with actual meter data while computing Deviation charges.

9. Omkareshwar Sagar Project (OSP) of NHDC is not covered in the ABT regime. Therefore the Generation
Schedule of OSP has been replaced with actual meter reading while computing monthly Deviation
charges.

10. Deviation charges of Inter State Open Access Customers embedded in the State system has been
computed as per Clause 7.10 of the MPERC Balancing & Settlement Code, 2015.

11. Renewable Energy Generators (REG’s) are not governed by the ABT regime. The energy injection data
of REGs connected at 33KV level whose data is not received through AMR system is taken from the
monthly energy injection details furnished by respective SE(O&M) and distributed in 15 min. time
blocks for complete month as per actual generation pattern of wind and solar generation. The actual
ABT meter data of the REGs connected at 132KV and above has been considered after deducting MP
transmission losses for computation of DSM charges of Discoms. The energy purchased by MPPMCL is
added to drawal schedule of respective Discom, energy wheeled for own use / third party sale is added
to Discoms schedule where point of drawal is situated and energy injection by the REG’s at 33KV level
is added to Discom drawal where point of injection is situated.

12. The auxiliary consumption in the sub-stations of MPPTCL is considered as a part of transmission losses
as per MPERC (Terms & Conditions for Determination of transmission Tariff) (Revision-III) Regulations,
2016 dated 15th July 2016. Thus the monthly auxiliary consumption of sub-stations of MPPTCL is
deducted from the respective Discom’s drawal while computing the Deviation charges.

13. Assessment / adjustment have been made in the Deviation accounting due to non-availability /
discrepancies in the main meter data as given below –

13.1 Data of ABT meters of following transformers / HT Consumers not received through AMR system and
also not furnished by the concerned site officials. Therefore, the data for each 15 min. time block for
the whole month have been assessed based on the monthly consumption and load pattern of
adjoining transformers –
1. Auxiliary Consumption of WZ, CZ & EZ
2. 132 KV S/s Anjad 40MVA BHEL
3. 132 KV S/s Bagdi 40MVA BBL
4. 132 KV S/s Badgaon 40MVA BBL
5. 132 KV S/s Chhayan 50MVA BBL
6. 132 KV S/s Channera 50MVA
7. 132 KV S/s Depalpur 40MVA CGL
8. 132 KV S/s Dhamnod 20MVA EMCO
9. 132 KV S/s Electronic Complex 40MVA BHEL
10. 132 KV S/s Indore(Chambal) 20MVA NGEF
11. 132 KV S/s Jobat 40MVA
12. 132 KV S/s Jhabua 40MVA EMCO
13. 132 KV S/s Kukshi 40MVA ABB
14. 132 KV S/s Pandhana 63MVA IMP
15. 132 KV S/s Piplani 50MVA
16. 132 KV S/s Pithampur 40MVA BHEL
17. 132 KV S/s Rajgarh 40MVA IMP

-4-
18. 132 KV S/s Sanawad 40MVA ABB
19. 132 KV S/s Shahpura 40MVA
20. 132 KV S/s Sendhwa 20MVA CGL
21. 132 KV S/s Singot 40MVA
22. 132 KV S/s Talakpura 40MVA
23. 132 KV S/s Agar 40MVA TELK
24. 132 KV S/s Agrod 40MVA BBL
25. 132 kV S/s Bharotha 40MVA BHEL
26. 132 kV S/s Bherugarh 63MVA IMP
27. 132 kV S/s Ghonsla 40MVA IMP
28. 132 kV S/s Ingoriya 20MVA NGEF
29. 132 KV S/s Kishangarh 40MVA BHEL
30. 132 KV S/s Khategaon 40MVA BHEL
31. 132 KV S/s Mahidpur 40MVA BBL
32. 132 KV S/s Mandsour 63MVA BBL
33. 132 KV S/s Makdon 40MVA BHEL
34. 132 KV S/s Maxi 40MVA
35. 132 KV S/s Shankargarh 40MVA BHEL
36. 132 KV S/s Satwas 40MVA BHEL
37. 132 KV S/s Tarana 63MVA BBL
38. 132 KV S/s Amrawad khurd 63MVA & 40MVA
39. 132 KV S/s Berasia 40MVA BHEL
40. 132 KV S/s Bilkisganj 40MVA
41. 132 KV S/s Binsoor 50MVA
42. 132 KV S/s Intkhedi 63MVA
43. 132 KV S/s Ichhawar 20MVA BBL
44. 132 KV S/s Jeerapur 20MVA NGEF
45. 132 KV S/s Kurawar 40MVA BBL
46. 132 KV S/s Khujner 50MVA
47. 132 KV S/s Lalghati 63MVA BBL
48. 132 KV S/s Lateri 40MVA IMP
49. 132 KV S/s MACT Bhopal 63MVA NGEF
50. 132 KV S/s Pachore 40MVA TELK & BBL
51. 132 KV S/s Salamatpur 40MVA TELK
52. 132 KV S/s Sarangpur 20MVA NGEF
53. 132 KV S/s Shamshabad 20MVA NGEF
54. 132 KV S/s Udaipura 40MVA
55. 132 KV S/s Badagaon 40MVA IMP & 50MVA
56. 132 KV S/s Banmore 40MVA NGEF
57. 132 KV S/s Chinor 50MVA BBL
58. 132 KV S/s Indergarh 50MVA BHEL
59. 132 KV S/s Joura 20MVA A&Y
60. 132 KV S/s Kailaras 40MVA
61. 132 KV S/s Morena 40MVA BBL
62. 132 KV S/s Motizeel 40MVA BBL
63. 132 KV S/s Pratapura 40MVA IMP
64. 132 KV S/s Porsa 12.5 MVA EMCO
65. 132 KV S/s Ron 50 MVA
66. 132 KV S/s Sheopur 50 MVA
67. 132 KV S/s Shivpuri 40 MVA BBL
68. 132 KV S/s Khurai 40MVA BHEL
69. 132 KV S/s Karpgaon 40MVA BHEL
70. 132 KV S/s Kymore 16MVA NGEF
71. 132 KV S/s Mansakra 40MVA TELK
72. 132 KV S/s Palohabada 40MVA
73. 132 KV S/s Banda 50MVA BHEL
74. 132 KV S/s Bijawar 40MVA NGEF
75. 132 KV S/s Damoh 50MVA BBL
76. 132 KV S/s Gourjhamar 20MVA NGEF
77. 132 KV S/s Patera 50MVA BHEL
78. 132 kV S/s Prithvipur 63MVA BBL

-5-
79. 132 kV S/s Rahatgarh 40MVA
80. 132 KV S/s Beohari 50MVA
81. 132 KV S/s Deosar 40MVA T&R
82. 132 KV S/s Dindori 20MVA EMCO
83. 132 KV S/s Dongrital 20MVA EMCO
84. 132 KV S/s Katra 50MVA BHEL
85. 132 KV S/s Majhgawan 40MVA BBL
86. 132 KV S/s Mauganj 40MVA
87. 132 KV S/s Rampur Naikin 40MVA BHEL
88. 132 KV S/s Rewa-II 50MVA BBL
89. 132 KV S/s Satna 40MVA BHEL
90. 132 KV S/s Satna-II 50MVA-I & II
91. 132 kV S/s Shahdol 20MVA
92. 132 kV S/s Umariya 20MVA
93. 132 KV S/s Satna-II 50MVA-I
94. 132 KV S/s Bichhua 40MVA BHEL
95. 132 KV S/s Benegaon 12.5MVA
96. 132 KV S/s Lalburra 40MVA IMP
97. 132 KV S/s Saori 50MVA
98. 132 KV S/s Waraseoni 40 MVA
99. 220 kV S/s Chhegaon makhan 63MVA BHEL
100. 220 kV S/s Barnagar 20 MVA NGEF
101. 220 kV S/s Neemuch 50 MVA BHEL
102. 100 MVA LV-I Barnagar AREVA
103. 220 kV S/s Shajapur 40 MVA BHEL
104. 220 kV S/s Suwasara 50 MVA BBL
105. 220 kV S/s Bairagarh 50 MVA
106. 220 kV S/s Mugaliya Chhap 40MVA BHEL
107. 220 kV S/s Rajgarh Biora 20MVA
108. 220 kV S/s Gwalior-II 40MVA
109. 220 KV S/s Guna 40MVA BHEL
110. 220 kV S/s Mahalgaon 63MVA BHEL
111. 220 kV S/s Morena 63MVA
112. 220 kV S/s Mehgaon 40MVA BBL
113. 220 kV S/s Shivpuri 20MVA CGL
114. 220 kV S/s Chichli 50MVA BHEL
115. 220 kV S/s Narsingpur 63MVA BBL
116. 220 kV S/s Panagar 40MVA BHEL
117. 220 kV S/s Damoh 40MVA ABB
118. 220 KV S/s Seoni 50MVA BBL
119. 220 KV S/s Chhindwara 50MVA
120. 220 KV S/s Sirmour 40MVA IMP
121. 220 KV S/s Anuppur 50MVA BHEL
122. 400 KV S/s Kirnapur 40 MVA
123. 220 KV S/s Satna 63 MVA
124. 0.4 KV Mangthar feeder from SGTPS.
125. Inter Discom feeders - 33kV Manglaj, Khokhrakalan, Salsalai, Killod and Lion.
126. HT Consumers- NTPC_TC, JP Cement Bela, OSP CANAL,Narmada malwa link-Balwada, SPM..

13.2 Data of ABT meters of following transformers / HT Consumers is partially available. Dates for which
data was not available, has been assessed based on the monthly consumption, loading pattern of
other dates for which data is available –

1. 132 KV S/s Betma 40MV BBL (12th to 30th )


2. 132 KV S/s Barwani 20MV EMCO (09th to 30th )
3. 132 KV S/s Chapda 20MVA EMCO (08th to 30th )
4. 132 KV S/s Boregaon 50MVA BHEL (11th to 30th )
5. 132 KV S/s Kotma 40MVA BBL (08 to 30th )
th

6. 132 KV S/s Mauganj 40MVA BBL (23rd to 30th )

-6-
13.3 ABT meter / Non- ABT meter data of 33 KV feeder supplying power to CHP of Satpura TPS was not
available. Thus the monthly energy drawn as per JMR by MPPGCL on these feeder has been equally
distributed in 15 min. time blocks for complete month.

13.4 The ABT meter data of Open Access meter installed for M/s SEL, M/s Prism Cement Unit-2 & M/s
Maihar Cement was not made available to SLDC. Thus data of ABT meter installed at substation end
was taken.

13.5 The Maharastra State Electricity Distribution Co. Ltd (MSEDCL) is drawing power from 132KV Dharni
feeder through 132KV Nepanagar S/s under Short Term Open Access (Approval no.
WRLDC/FCFS/3577). Accordingly, Deviation charges of MSEDCL are computed.

(S S PATEL)
SE (LD: ABT&OA)
SLDC MPPTCL Jabalpur

…….

-7-
STATE LOAD DISPATCH CENTRE

Madhya Pradesh Power Transmission Company Limited, Jabalpur


DETAILS OF DEVIATION CHARGES FROM 01/ 04/ 2019 TO 30/ 04/ 2019
All Figures in Rs.
ADDITIONAL TOTAL ADJUSTED
DEVIATION CAPPING DEVIATIONAL DEVIATION DEVIATION
UTILITY CHARGES AMOUNT CHARGES CHARGES CHARGES
MPPakVVCCL -362523247 168361466 65327008 -128834773 -260414952
MPMKVVCL 10633224 74748061 58135733 143517018 41288029
MPPuKVVCL 189398425 32686306 75983471 298068202 192595222
Special Economic Zone 4433537 0 326061 4759598 4558601
RAILWAYS 15701698 99888 4489617 20291203 20104222
M/s BLA POWER PVT. LTD. -448072 116152 41253 -290667 -290185
M/s JAYPEE BINA THERMAL POWER PLANT, UNIT-I&II -126683 398399 186021 457737 379334
Sanjay Gandhi Thermal Power Station -III 552613 25347 398217 976177 897949
Satpura Thermal Power Station -IV 4109208 -1088510 768528 3789226 3750718
SHREE SINGAJI THERMAL POWER PROJECT-I 7373174 -1470081 857875 6760968 6493585
Sanjay Gandhi Thermal Power Station I&II -432775 714960 566321 848506 775728
Amarkantak Thermal Power Station -III -1110291 800769 85091 -224431 -230801
Satpura Thermal Power Station 22355444 -6977596 845110 16222958 15635873
SHREE SINGAJI THERMAL POWER PROJECT- II 42305905 -13806185 3894454 32394174 30593437
Indira Sagar Project -3967270 0 176477 -3790793 -3726640
MSEDCL_DHARNI (DRAWAL) 186386 0 412737 599123 601341
PRISM CEMENT I (DRAWAL) -3852 0 0 -3852 -3852
PRISM CEMENT II (DRAWAL) -5005 0 1535 -3470 -3476
M/s BHILAI JAYPEE CEMENT PLANT, BHILAI (DRAWAL) -394344 0 43550 -350794 -349300
Regional DSM Amount -52654833 0 0 -52654833 -52654833
TOTAL -124616758 254608976 212539050 342531277 0
( - ) RECEIVABLE

Assistant Engineer (LD) Executive Engineer (LD)


MPPTCL Jabalpur MPPTCL Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
MPPakVVCCL
DATE SCHEULE in ACTUAL in KWH DEVIATION CAP AMOUNT in ADDITIONAL TOTAL ADJUSTED
KWH CHARGE in RS. DEVIATION DEVIATION DEVIATION
RS. CHARGE in RS. CHARGE in CHARGE in RS.
RS.
01-04-2019 70398447 67201099 -8677141 2867138 2859220 -2950783 -21947542
02-04-2019 77664418 76316541 -3050872 2621860 1574704 1145692 -7324799
03-04-2019 71966891 68868381 -13532594 3681110 296687 -9554797 -14940802
04-04-2019 71603028 65911271 -18291588 7362924 2168086 -8760578 -14094277
05-04-2019 69725289 64613355 -15569799 6395257 3065476 -6109066 -12101653
06-04-2019 67262320 65493755 -185626 584612 3743318 4142304 2328622
07-04-2019 66705212 61223213 -12407217 5344724 5561679 -1500814 -6045696
08-04-2019 73432984 68848177 -13435302 4140774 1163328 -8131200 -10931447
09-04-2019 71297772 63971301 -25603184 14377845 502494 -10722845 -17004166
10-04-2019 72158676 66037656 -24351809 10849742 310722 -13191345 -19647905
11-04-2019 72288732 66999248 -19972318 8675554 110689 -11186075 -16969329
12-04-2019 66299288 67323787 4435605 0 519554 4955159 3592913
13-04-2019 72328304 66494731 -19000888 8291797 2161752 -8547339 -15599049
14-04-2019 66429546 63520035 -8011165 1879958 1848392 -4282815 -9572466
15-04-2019 69625399 63917996 -14965882 6775794 2591135 -5598953 -12496524
16-04-2019 54249236 53786888 -867693 462352 2677743 2272402 1449774
17-04-2019 50938738 50739510 -1566438 580554 189130 -796754 -1672516
18-04-2019 56647820 58611466 6910438 0 1202489 8112927 5858886
19-04-2019 65811353 60272491 -15110465 5509066 1099581 -8501818 -9684036
20-04-2019 65430093 64173620 -4439347 1678541 256511 -2504295 -4654090
21-04-2019 74555829 69198596 -15539728 5951594 1253362 -8334772 -7856787
22-04-2019 69773531 62955259 -20425716 9498182 1623513 -9304021 -10306573
23-04-2019 74918528 67522736 -14928672 6599334 5271523 -3057815 -5240721
24-04-2019 66242468 63768379 -8652900 1921092 407103 -6324705 -7908222
25-04-2019 66869257 64289744 -7843772 1850923 356619 -5636230 -8114288
26-04-2019 72725829 64887398 -20578575 13383421 2457964 -4737190 -10149281
27-04-2019 72873626 67077025 -17442898 6534809 3791933 -7116156 -8215363
28-04-2019 69951888 64046675 -10515832 4593258 3641490 -2281084 -2193172
29-04-2019 71416510 62155553 -19268975 12074377 4293887 -2900711 -9619174
30-04-2019 72563379 60835442 -19632894 13874874 8326924 2568904 -9355269
TOTAL 2064154391 1931061328 -362523247 168361466 65327008 -128834773 -260414952
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
MPMKVVCL
DATE SCHEULE in ACTUAL in KWH DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in RS. CHARGE in RS. CHARGE in RS.
01-04-2019 58836349 60249343 3442909 206921 1036962 4686792 2556699
02-04-2019 62119876 63644144 8785899 800217 2916044 12502160 9030744
03-04-2019 59764199 61202983 7548126 191833 1998992 9738951 6691650
04-04-2019 61533057 61833675 715078 1028384 647105 2390567 1617165
05-04-2019 57197381 59168532 7351968 86741 2013990 9452699 6292728
06-04-2019 58774876 56996092 -4579432 1815010 1582814 -1181608 -6424656
07-04-2019 57402760 60284852 5759411 88615 1667582 7515608 4335516
08-04-2019 55768464 56820777 6065036 320098 2266152 8651286 6974032
09-04-2019 62059306 62653883 2955528 1059821 796307 4811656 3345086
10-04-2019 61181699 63522941 9822208 428030 3030912 13281150 9503085
11-04-2019 62094724 64198351 10500110 0 1399412 11899522 8419679
12-04-2019 69371704 64051112 -21212615 8536706 1471910 -11203999 -17274282
13-04-2019 62336107 66580006 14511964 0 4810283 19322247 13428157
14-04-2019 70025803 65792618 -10725922 4581405 3763348 -2381169 -5322119
15-04-2019 59822050 63769877 9880265 0 2251285 12131550 7484176
16-04-2019 57519118 51022460 -12999066 7636748 6513108 1150790 -9417043
17-04-2019 36924616 42849568 13698737 0 3798678 17497415 10397008
18-04-2019 59836749 53191693 -18746069 10140279 1642331 -6963459 -10487498
19-04-2019 55180991 57468697 6778611 0 1083357 7861968 6979046
20-04-2019 68744323 60013159 -31196993 19408277 853707 -10935009 -20322098
21-04-2019 62546086 63535354 3172845 62938 390269 3626052 4172744
22-04-2019 61071051 61846229 3234683 4154 927583 4166420 3802328
23-04-2019 64807076 66714629 2901363 75766 453085 3430214 2320608
24-04-2019 72503666 66611622 -17762271 8237777 2271972 -7252522 -9068331
25-04-2019 74540298 67892416 -21000062 9978418 1223891 -9797753 -14105489
26-04-2019 66052255 68504410 6184398 0 1674982 7859380 5079851
27-04-2019 65909298 67941153 6316389 18645 988943 7323977 6542717
28-04-2019 64707018 66780844 2644622 0 213847 2858469 3224549
29-04-2019 63003290 68484425 11321261 0 3204075 14525336 7752347
30-04-2019 66781641 69537343 5264243 41278 1242807 6548328 3759630
TOTAL 1858415831 1863163188 10633224 74748061 58135733 143517018 41288029
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
MPPuKVVCL
DATE SCHEULE in ACTUAL in DEVIATION CAP AMOUNT ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in in RS. DEVIATION DEVIATION DEVIATION
RS. CHARGE in RS. CHARGE in RS. CHARGE in RS.
01-04-2019 56680639 64632950 26446992 0 10909154 37356146 20378201
02-04-2019 56854229 58828766 10169967 913717 4849511 15933195 11509105
03-04-2019 58244538 58213559 233147 2525505 2376752 5135404 3528542
04-04-2019 57198364 60401455 11461804 0 1444602 12906406 8730872
05-04-2019 58580297 60798766 5926102 1107859 1406450 8440411 5618836
06-04-2019 57384463 58741893 5314915 211505 2386906 7913326 4448517
07-04-2019 57329237 57808201 573192 1239627 1447100 3259919 1880543
08-04-2019 55091496 56263591 5282921 373453 391485 6047859 4875344
09-04-2019 57124620 61106956 12859022 0 2498843 15357865 10676855
10-04-2019 61591675 62674918 4904992 976948 1523962 7405902 5299160
11-04-2019 60281197 60907195 646489 4604435 856170 6107094 4321166
12-04-2019 55460475 58554215 12279854 307192 4124419 16711465 12117239
13-04-2019 58814674 60133186 3616025 101538 250283 3967846 2757492
14-04-2019 55140632 61666409 17737705 0 4742740 22480445 14284211
15-04-2019 59202738 60862124 4423021 364466 622066 5409553 3337254
16-04-2019 49540803 54672051 15551409 0 5634303 21185712 13516280
17-04-2019 50624769 41768855 -21117425 12610515 2469122 -6037788 -12674323
18-04-2019 46101223 47716671 2683344 320194 711921 3715459 2683184
19-04-2019 53203537 53585594 942828 723424 224293 1890545 1678229
20-04-2019 50206703 56804713 22556186 21377 8436461 31014024 19772727
21-04-2019 58089047 58789331 792819 606691 141773 1541283 1773659
22-04-2019 57558614 59020543 4159566 318840 1110399 5588805 5100412
23-04-2019 58811743 61110476 1542999 369992 742680 2655671 1796613
24-04-2019 57691174 62707661 16584864 0 5150591 21735455 18237721
25-04-2019 58741707 64931715 19340591 0 5948436 25289027 18769683
26-04-2019 63130702 65354089 5859857 0 1454772 7314629 4727752
27-04-2019 65458937 64988038 -2158319 1369423 1293001 504105 450332
28-04-2019 64701874 64652844 -3571599 1377283 237478 -1956838 -1881420
29-04-2019 67173487 66228352 -3216803 2242322 829224 -145257 -481689
30-04-2019 62411232 66652637 7571960 0 1768574 9340534 5362725
TOTAL 1728424826 1790577754 189398425 32686306 75983471 298068202 192595222
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
SEZ
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT DEVIATION DEVIATION DEVIATION
RS. in RS. CHARGE in RS. CHARGE in CHARGE in RS.
RS.
01-04-2019 1064896 1055024 27097 0 31292 58389 59529
02-04-2019 1064896 1094182 137749 0 12015 149764 207982
03-04-2019 1064896 1073612 16029 0 27056 43085 36050
04-04-2019 1064896 1059904 -34932 0 2973 -31959 -37447
05-04-2019 1064896 1115185 147804 0 1287 149091 147982
06-04-2019 1064896 1119346 95620 0 0 95620 97914
07-04-2019 1004528 981143 -115278 0 13370 -101908 -100374
08-04-2019 1064896 1094652 86476 0 3977 90453 93891
09-04-2019 1064896 1128063 200935 0 4648 205583 186632
10-04-2019 1064896 1131039 294771 0 37448 332219 290306
11-04-2019 1064896 1118905 203762 0 0 203762 177858
12-04-2019 1064896 1112348 197396 0 15617 213013 203611
13-04-2019 1064896 1097000 120345 0 15410 135755 138031
14-04-2019 1029888 1008322 -107080 0 35769 -71311 -72891
15-04-2019 1064896 1101847 57727 0 4340 62067 58049
16-04-2019 1064896 1152870 228451 0 14384 242835 295360
17-04-2019 1064896 1136392 172961 0 0 172961 147811
18-04-2019 1064896 1124102 144975 0 0 144975 131805
19-04-2019 1064896 1101364 107089 0 1637 108726 103127
20-04-2019 1041528 1147013 359946 0 0 359946 320207
21-04-2019 1006368 1041504 112351 0 8656 121007 106588
22-04-2019 1047336 1114885 197694 0 16390 214084 200002
23-04-2019 1041528 1149208 276272 0 9896 286168 257715
24-04-2019 1031728 1124123 239593 0 4480 244073 252112
25-04-2019 1041528 1148528 333040 0 10560 343600 316739
26-04-2019 1041528 1171805 341427 0 11840 353267 348011
27-04-2019 1080576 1147816 217566 0 10664 228230 213596
28-04-2019 968440 990486 57178 0 23984 81162 73759
29-04-2019 1080576 1153519 147596 0 8368 155964 137620
30-04-2019 1080576 1189814 168977 0 0 168977 167026
TOTAL 31599360 33184001 4433537 0 326061 4759598 4558601
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Railways
DATE SCHEULE in ACTUAL in DEVIATION CAP AMOUNT ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in in RS. DEVIATION DEVIATION DEVIATION
RS. CHARGE in CHARGE in CHARGE in RS.
RS. RS.
01-04-2019 5484335 5911777 1086604 0 30935 1117539 1139302
02-04-2019 5200088 5854365 2794486 0 590757 3385243 4701141
03-04-2019 5327366 6087263 3501843 0 229924 3731767 3122440
04-04-2019 5454118 5711511 702507 0 20120 722627 621657
05-04-2019 5643167 5631203 -29257 0 152093 122837 121921
06-04-2019 5268691 5650225 395207 0 2225 397432 406950
07-04-2019 5386775 5650547 354143 0 90566 444709 450353
08-04-2019 5677321 5765152 237463 0 40401 277863 288433
09-04-2019 5536109 5909480 1147121 24008 20267 1191396 1081539
10-04-2019 5554219 5970260 1886810 0 399708 2286518 1998069
11-04-2019 5544775 5750856 767104 0 12503 779607 680500
12-04-2019 5544618 5593135 66775 0 89654 156429 149526
13-04-2019 5535166 5789544 931487 0 154048 1085535 1103732
14-04-2019 5515020 5911310 1145531 0 56454 1201985 1178236
15-04-2019 5497360 5774951 781736 969 52700 835405 781356
16-04-2019 5528981 5382723 -446937 14145 191869 -240923 -184384
17-04-2019 5536142 5450941 -247849 522 37326 -210001 -247648
18-04-2019 5541144 5495460 65068 0 164878 229946 209046
19-04-2019 5668667 5565373 -167371 5223 40284 -121863 -129297
20-04-2019 5558850 5640074 419905 2450 58344 480699 427630
21-04-2019 5550411 5627142 236124 0 103198 339322 298881
22-04-2019 5554096 5500495 -180228 0 71702 -108527 -117376
23-04-2019 5624151 5561399 -113516 5657 144930 37071 33385
24-04-2019 5798097 5538826 -588440 14166 264608 -309666 -297743
25-04-2019 5576034 5636880 357707 0 58734 416440 383885
26-04-2019 5513219 5472045 -10405 12796 204659 207051 203968
27-04-2019 5522922 5737919 718685 0 135162 853847 799106
28-04-2019 5520884 5424316 14517 125 283507 298150 270947
29-04-2019 5551526 5458483 77278 6388 352097 435763 384513
30-04-2019 5570264 5390419 -202399 13439 435963 247002 244154
TOTAL 165784516 169844074 15701698 99888 4489617 20291203 20104222
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED,
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
M/s BLA POWER PVT. LTD.
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in
RS. RS. RS.
01-04-2019 696301 705444 -32053 6348 3186 -22519 -22557
02-04-2019 770259 790897 -94414 31053 1816 -61545 -61305
03-04-2019 0 9776 0 0 0 0 0
04-04-2019 0 0 0 0 0 0 0
05-04-2019 0 0 0 0 0 0 0
06-04-2019 0 0 0 0 0 0 0
07-04-2019 0 0 0 0 0 0 0
08-04-2019 0 0 0 0 0 0 0
09-04-2019 0 0 0 0 0 0 0
10-04-2019 0 0 0 0 0 0 0
11-04-2019 0 0 0 0 0 0 0
12-04-2019 0 0 0 0 0 0 0
13-04-2019 0 0 0 0 0 0 0
14-04-2019 0 0 0 0 0 0 0
15-04-2019 0 0 0 0 0 0 0
16-04-2019 0 0 0 0 0 0 0
17-04-2019 0 0 0 0 0 0 0
18-04-2019 0 0 0 0 0 0 0
19-04-2019 0 0 0 0 0 0 0
20-04-2019 0 67428 0 0 0 0 0
21-04-2019 628975 629247 23805 -15061 2774 11518 11505
22-04-2019 615360 621684 -20286 4131 1069 -15086 -15034
23-04-2019 615360 621472 -15519 2800 2956 -9763 -9719
24-04-2019 692767 717220 -101575 34120 1866 -65589 -65489
25-04-2019 706811 749316 -149169 42918 12757 -93494 -93388
26-04-2019 706587 707580 -8342 961 3172 -4209 -4211
27-04-2019 689670 699901 -28027 6410 5710 -15907 -15829
28-04-2019 619162 624508 -12858 1920 2419 -8519 -8589
29-04-2019 615360 617002 -2660 170 2099 -391 -388
30-04-2019 688483 690160 -6974 382 1429 -5163 -5181
TOTAL 8045095 8251635 -448072 116152 41253 -290667 -290185
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED,
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
M/s JAYPEE BINA THERMAL POWER PLANT, UNIT-I&II
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in
RS. RS. RS.
01-04-2019 7469743 7457050 13402 23985 5362 42749 43585
02-04-2019 7559038 7563278 -122940 95327 1771 -25842 -12797
03-04-2019 7120062 7141765 -178120 108610 0 -69510 -85031
04-04-2019 7158291 7152815 -8388 15513 805 7930 6821
05-04-2019 7010623 7006046 -13451 13561 1806 1916 1902
06-04-2019 7009761 7001354 6170 1563 3020 10753 11005
07-04-2019 7014740 7010246 -29173 14917 13381 -875 -862
08-04-2019 7034990 7035033 6825 56 2741 9622 9990
09-04-2019 7014959 7010312 13416 -4441 6092 15067 13676
10-04-2019 7094884 7117123 -67763 -318 42138 -25943 -30086
11-04-2019 7014963 6887647 398298 -20621 46510 424187 370266
12-04-2019 7124785 7134276 -38117 -1458 1741 -37834 -39763
13-04-2019 7121280 7116401 9215 12772 5522 27509 27970
14-04-2019 7015139 7010961 -8139 8871 1253 1985 1950
15-04-2019 7298957 7289120 11414 -1093 3055 13376 12509
16-04-2019 7023247 7031056 -24061 16270 27676 19885 24188
17-04-2019 7023268 7019088 -9306 8593 0 -713 -842
18-04-2019 7033543 7027527 4452 3968 487 8907 8096
19-04-2019 7031520 7026423 5819 5958 0 11777 11167
20-04-2019 7031520 7029072 822 3920 668 5410 4813
21-04-2019 7031520 7021108 8330 3896 56 12282 10821
22-04-2019 7030080 7025208 5155 3565 2693 11413 10657
23-04-2019 7030080 7020148 -8703 11341 1640 4278 3852
24-04-2019 7355998 7357372 -11243 4043 559 -6641 -6385
25-04-2019 7464991 7461596 -51671 25524 0 -26147 -28529
26-04-2019 7465009 7442455 52146 -7478 4359 49027 48299
27-04-2019 7261086 7264604 -33796 12041 4649 -17106 -18807
28-04-2019 7029075 7039762 -93514 33252 1824 -58438 -67106
29-04-2019 7024388 7021816 -9363 6584 1683 -1096 -1264
30-04-2019 7465277 7446005 45601 -322 4530 49809 49239
TOTAL 214362817 214166667 -126683 398399 186021 457737 379334
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED,
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Sanjay Gandhi Thermal Power Station -III
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in
RS. RS. RS.
01-04-2019 10395000 10365761 148377 -101673 69049 115753 118011
02-04-2019 10952500 10916059 45205 3078 19507 67790 94139
03-04-2019 11337500 11324519 96714 -67664 19610 48660 40716
04-04-2019 10831250 10764378 254045 -137465 1914 118494 101939
05-04-2019 10995000 10938172 104046 -42706 10282 71622 71087
06-04-2019 10757500 10549449 250520 -68377 0 182143 186503
07-04-2019 9605000 9543358 115919 -24167 35227 126979 128589
08-04-2019 10337500 10292275 44678 -1496 0 43182 44821
09-04-2019 10988750 10928246 128238 -31662 2457 99033 89902
10-04-2019 11400000 11381942 83911 -52248 2863 34526 30167
11-04-2019 11100000 10971676 483742 -260581 0 223161 194792
12-04-2019 9418750 9452097 -170461 120695 29928 -19838 -20853
13-04-2019 10223750 10200422 -156127 157385 31716 32974 33520
14-04-2019 9840000 9823838 14543 -3458 6218 17303 16962
15-04-2019 9840000 9809786 53926 -13404 5031 45553 42609
16-04-2019 9660000 9645974 -81529 66561 7193 -7775 -5958
17-04-2019 9127500 9069101 175828 -81523 2389 96694 82637
18-04-2019 9028750 9022093 -2357 5213 22185 25041 22767
19-04-2019 7800000 7830824 -118231 59974 5009 -53248 -56496
20-04-2019 7800000 7809698 -28334 5501 15189 -7644 -8589
21-04-2019 7800000 7811160 -50317 22140 5634 -22543 -26241
22-04-2019 7800000 7884393 -267567 125698 11578 -130291 -140912
23-04-2019 7800000 7806345 -74255 48112 8511 -17632 -20217
24-04-2019 7800000 7842414 -216785 129802 3256 -83727 -80503
25-04-2019 7800000 7839244 -150676 83587 3623 -63466 -69255
26-04-2019 7800000 7792028 -36257 29422 4091 -2744 -2795
27-04-2019 7800000 7813816 -84317 46763 26430 -11124 -12236
28-04-2019 7800000 7759152 49973 -7714 3539 45798 41619
29-04-2019 7800000 7811156 -30458 11604 21104 2250 1985
30-04-2019 7800000 7808506 -29381 3950 24684 -747 -761
TOTAL 279438750 278807882 552613 25347 398217 976177 897949
(+) Payable (-)
Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Satpura Thermal Power Station -IV
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in RS. CHARGE in CHARGE in
RS. RS.

01-04-2019 10565000 10505408 -149188 156929 405 8146 8302


02-04-2019 11137500 10936504 784753 -418165 30942 397530 552059
03-04-2019 9805000 9793227 20974 6412 14197 41583 34799
04-04-2019 9665000 9572606 285852 -99968 5624 191508 164743
05-04-2019 8460000 8377407 22349 66936 43272 132557 131573
06-04-2019 9548750 9459667 -126817 133478 483 7144 7313
07-04-2019 6883750 6902855 -88608 59865 172733 143990 145816
08-04-2019 6081250 5895163 181597 -53242 51677 180032 186879
09-04-2019 8741250 8767220 -81398 15648 26745 -39005 -42939
10-04-2019 9372500 9372681 -113530 95455 3109 -14966 -17357
11-04-2019 5520000 5411857 447299 -197171 0 250128 218330
12-04-2019 10307500 10296741 -48180 46220 1092 -868 -916
13-04-2019 10998750 10802161 724294 -355632 33228 401890 408632
14-04-2019 10466250 10368513 218198 -81178 3480 140500 137725
15-04-2019 10790000 10722533 246533 -72923 112485 286095 267585
16-04-2019 9148750 9066268 -109628 102315 64999 57686 70165
17-04-2019 7627500 7769922 -268581 62361 80962 -125258 -147711
18-04-2019 9263750 9209015 191472 -79033 23106 135545 123225
19-04-2019 10221250 10013759 518618 -152117 5727 372228 353062
20-04-2019 10096250 10107086 -116659 80420 2884 -33355 -37477
21-04-2019 9911250 9858710 102187 -16932 4918 90173 79424
22-04-2019 11160000 11093579 95954 -16010 0 79944 74685
23-04-2019 11160000 11036310 175222 -28832 6473 152863 137664
24-04-2019 11137500 11039680 328531 -141206 10669 197994 204515
25-04-2019 11160000 11029851 383085 -132357 0 250728 231126
26-04-2019 11160000 11101594 95495 -12743 378 83130 81895
27-04-2019 11040000 10956709 38980 23355 4470 66805 62517
28-04-2019 9697500 9622316 36803 12929 8270 58002 52711
29-04-2019 10160000 10100374 113613 -32784 22063 102892 90793
30-04-2019 9965000 9852915 199988 -60540 34137 173585 171580
TOTAL 291251250 289042631 4109208 -1088510 768528 3789226 3750718
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
SHREE SINGAJI THERMAL POWER PROJECT-I
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in
RS. RS. RS.
01-04-2019 15960000 15888075 153864 -14262 16584 156186 159227
02-04-2019 15840000 15803021 92759 822 31327 124908 173460
03-04-2019 15840000 15793171 173314 -57106 9642 125850 105306
04-04-2019 15840000 15786638 154064 -51244 6724 109544 94236
05-04-2019 14520000 14403892 185514 180291 169579 535384 531389
06-04-2019 13380000 13311621 -12027 100320 10339 98632 100993
07-04-2019 15225000 15130526 165366 -44663 51345 172048 174231
08-04-2019 15840000 15751274 198457 -52414 0 146043 151594
09-04-2019 15840000 15808603 33821 4619 6526 44966 40825
10-04-2019 15840000 15746249 369365 -125332 7884 251917 220135
11-04-2019 15840000 15794433 151723 -46428 0 105295 91910
12-04-2019 15840000 15811696 59138 -11426 9602 57314 54784
13-04-2019 15840000 15772696 127560 4563 6622 138745 141067
14-04-2019 16690000 16582275 263676 -54049 6990 216617 212334
15-04-2019 18987500 18898383 289548 -63687 140823 366684 342956
16-04-2019 17072500 16981709 201619 -76502 35616 160733 195503
17-04-2019 16040000 15930766 222975 -49337 2257 175895 150321
18-04-2019 17940000 17802305 389640 -86939 21422 324123 294662
19-04-2019 18003000 17917714 172732 -3089 0 169643 160906
20-04-2019 18230500 18055189 683440 -242025 1116 442531 393672
21-04-2019 18205250 18146361 177020 -42776 13872 148116 130458
22-04-2019 18831500 18587136 509720 -100750 58383 467353 436609
23-04-2019 20126750 19890203 609036 -128709 19257 499584 449903
24-04-2019 22220250 21977590 821928 -271951 86059 636036 656978
25-04-2019 19414000 19322768 340880 -138980 11211 213111 196450
26-04-2019 19127500 18827968 538113 -112335 0 425778 419450
27-04-2019 22105000 22084860 49886 7739 80450 138075 129220
28-04-2019 19327500 19216227 271926 -61611 15001 225316 204766
29-04-2019 17227500 17159724 5838 14172 11341 31351 27666
30-04-2019 16690000 16629663 -27721 53008 27903 53190 52574
TOTAL 517883750 514812736 7373174 -1470081 857875 6760968 6493585
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Sanjay Gandhi Thermal Power Station I&II

DATE SCHEULE in ACTUAL in DEVIATION CAP AMOUNT ADDITIONAL TOTAL ADJUSTED


KWH KWH CHARGE in RS. in RS. DEVIATION DEVIATION DEVIATION
CHARGE in CHARGE in CHARGE in RS.
RS. RS.
01-04-2019 15647500 15539476 436118 -201550 41911 276479 281867
02-04-2019 15435000 15464390 -299065 194233 24236 -80596 -39916
03-04-2019 15408750 15456853 -239886 145381 11007 -83498 -102135
04-04-2019 15387500 15411573 -157351 83428 4986 -68937 -80778
05-04-2019 16076250 16084542 -139701 97213 32495 -9993 -10076
06-04-2019 14797500 14666935 107999 -60434 118422 165987 169964
07-04-2019 15385000 15353775 -188026 99534 43310 -45182 -44497
08-04-2019 15503750 15543905 -319371 174881 907 -143583 -137501
09-04-2019 15772500 15703117 112963 -24070 0 88893 80699
10-04-2019 15816250 15876645 -317984 192761 3225 -121998 -141507
11-04-2019 16282500 16303397 -76005 37178 4727 -34100 -39643
12-04-2019 15590000 15561992 50664 -9172 14448 55940 53475
13-04-2019 13740000 13748629 -67430 42811 19276 -5343 -5227
14-04-2019 12000000 11997528 -114824 74501 8908 -31415 -32109
15-04-2019 12000000 12031475 -151381 75930 19181 -56270 -60773
16-04-2019 12000000 11985989 40272 -7763 42569 75078 91321
17-04-2019 12000000 12010449 -62196 38591 8283 -15322 -18069
18-04-2019 12000000 11943857 108364 -37633 15958 86689 78813
19-04-2019 12000000 12038389 -178256 85600 3088 -89568 -95035
20-04-2019 12000000 11986651 18283 2682 4166 25131 22357
21-04-2019 12000000 11887830 312697 -129189 7126 190634 167910
22-04-2019 12000000 12003216 -44955 27821 12496 -4638 -5015
23-04-2019 12000000 12021871 -93697 60626 32899 -172 -201
24-04-2019 12000000 11952420 101308 -27453 8107 81962 84661
25-04-2019 12000000 11978398 52355 -16790 0 35565 32787
26-04-2019 12000000 11923286 203036 -78898 4991 129129 127207
27-04-2019 12000000 11901266 172333 -63903 9962 118392 110803
28-04-2019 12000000 11940452 77533 -4661 31726 104598 95055
29-04-2019 10741250 10659127 110156 -21018 14423 103561 91376
30-04-2019 8980000 8904292 113272 -35677 23488 101083 99915
TOTAL 400563750 399881725 -432775 714960 566321 848506 775728
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Amarkantak Thermal Power Station -III
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in RS. AMOUNT in DEVIATION DEVIATION DEVIATION
RS. CHARGE in RS. CHARGE in CHARGE in RS.
RS.
01-04-2019 4632000 4644863 -66947 43449 6327 -17171 -16749
02-04-2019 4632000 4648983 -111360 76078 2100 -33182 -16438
03-04-2019 4632000 4647098 -81446 55513 124 -25809 -31574
04-04-2019 4632000 4639317 -43414 28753 2310 -12351 -14469
05-04-2019 4632000 4646033 -70323 45945 9444 -14934 -15058
06-04-2019 4632000 4634039 -23905 15628 8493 216 220
07-04-2019 4632000 4625358 -42784 32630 5082 -5072 -4994
08-04-2019 4572000 4581894 -71591 48558 2611 -20422 -19554
09-04-2019 4632000 4637890 -54112 39838 1583 -12691 -13973
10-04-2019 4632000 4640658 -50667 35603 2023 -13041 -15123
11-04-2019 4632000 4641781 -55095 38620 329 -16146 -18770
12-04-2019 4632000 4641097 -71637 53139 794 -17704 -18604
13-04-2019 4632000 4637197 -37238 28215 7754 -1269 -1248
14-04-2019 4632000 4634079 -30351 18129 2122 -10100 -10323
15-04-2019 4632000 4628425 -11675 8899 4608 1832 1716
16-04-2019 4632000 4623096 -23456 20636 2044 -776 -589
17-04-2019 4632000 4630379 1854 -918 321 1257 1077
18-04-2019 4632000 4621987 7394 -494 2777 9677 8797
19-04-2019 4632000 4626906 14317 -4978 2318 11657 11055
20-04-2019 4632000 4643825 -57905 36274 898 -20733 -23297
21-04-2019 4632000 4630000 -15057 10568 2182 -2307 -2687
22-04-2019 4632000 4632481 -21614 15554 1489 -4571 -4942
23-04-2019 4632000 4628914 -23242 17301 4316 -1625 -1867
24-04-2019 4632000 4629399 -27508 24460 0 -3048 -2933
25-04-2019 4632000 4635640 -38310 29342 0 -8968 -9785
26-04-2019 4632000 4619461 -5330 14041 2094 10805 10645
27-04-2019 4632000 4635651 -64944 46842 2106 -15996 -17586
28-04-2019 4632000 4629158 -28370 15787 2450 -10133 -11635
29-04-2019 4632000 4624100 -15626 10955 3502 -1169 -1347
30-04-2019 4632000 4615451 10051 -3598 2890 9343 9234
TOTAL 138900000 138955160 -1110291 800769 85091 -224431 -230801
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED,
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Satpura Thermal Power Station
DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in
RS. RS. RS.
01-04-2019 12216250 11560662 1624830 -521260 81446 1185016 1208088
02-04-2019 10935000 10625256 1437603 -687805 85801 835599 1160405
03-04-2019 10620000 10357057 1279775 -567481 34062 746356 624492
04-04-2019 6973750 6679397 1057742 -310915 64308 811135 697796
05-04-2019 6820000 6606113 711567 -211813 62419 562173 557980
06-04-2019 8047500 7792877 441179 -56407 11395 396167 405662
07-04-2019 7532500 7344256 326682 -81284 56246 301644 305472
08-04-2019 7160000 6913809 699269 -128482 2187 572974 594768
09-04-2019 6610000 6487287 382211 -102097 1916 282030 256030
10-04-2019 6960000 6817161 664215 -275032 9995 399178 348817
11-04-2019 9553750 9181100 1350728 -483547 0 867181 756945
12-04-2019 10456250 10170917 1241455 -499520 53922 795857 760744
13-04-2019 10332500 10130579 512474 -82655 2625 432444 439691
14-04-2019 10341250 10304289 13829 13510 4866 32205 31569
15-04-2019 10236250 10164493 134331 5065 31608 171004 159939
16-04-2019 9877500 9925174 -140823 37630 70631 -32562 -24920
17-04-2019 9870000 9856004 27321 -12518 11486 26289 22466
18-04-2019 10045000 9947098 313859 -71576 34978 277261 252063
19-04-2019 10075000 9872101 588942 -108351 1781 482372 457535
20-04-2019 9850000 9679218 625975 -175272 713 451416 401577
21-04-2019 9985000 9591659 1168363 -336512 0 831851 732709
22-04-2019 10160000 9833967 1058181 -323039 52554 787696 735879
23-04-2019 10055000 9866329 586015 -207410 35071 413676 372542
24-04-2019 9555000 9226004 933561 -278559 2147 657149 678789
25-04-2019 6888750 6479127 1364944 -420259 76217 1020902 941088
26-04-2019 6657500 6241717 1193555 -355151 14528 852932 840253
27-04-2019 8307500 7779055 1599869 -573054 38087 1064902 996624
28-04-2019 9268750 8842565 734957 -102233 0 632724 575010
29-04-2019 9480000 9383532 169311 -28458 3456 144309 127335
30-04-2019 9480000 9299242 253524 -33111 665 221078 218525
TOTAL 274350000 266958045 22355444 -6977596 845110 16222958 15635873
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
SHREE SINGAJI THERMAL POWER PROJECT-II
DATE SCHEULE in ACTUAL in KWH DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in RS. CHARGE in CHARGE in
RS. RS.
01-04-2019 23025000 21863820 5078628 -2500852 637102 3214878 3277475
02-04-2019 16027500 15862660 673400 -323833 26306 375873 521982
03-04-2019 15840000 15795900 279407 -162481 36864 153790 128679
04-04-2019 15172500 14765940 995420 -303386 361789 1053823 906580
05-04-2019 15840000 15835160 -36414 5555 33444 2585 2572
06-04-2019 16802500 16705700 55956 78 74960 130994 134131
07-04-2019 15840000 15681440 310484 -95868 2021 216637 219387
08-04-2019 15840000 15698460 424886 -133119 446 292213 303330
09-04-2019 16627500 17060680 -2216731 1888562 10982 -317187 -349187
10-04-2019 11545000 10921700 2713698 -1217139 168361 1664920 1454885
11-04-2019 11805000 11210340 2070572 -769541 147629 1448660 1264509
12-04-2019 12992500 12422940 2450879 -1071089 200012 1579802 1510095
13-04-2019 14407500 13911800 1387478 -420841 51591 1018228 1035302
14-04-2019 9982500 9772700 570570 -218264 37480 389786 382078
15-04-2019 6522500 6049600 1171859 -289775 223139 1105223 1033717
16-04-2019 0 -522480 1310436 -483972 27072 853536 1038164
17-04-2019 3915500 2615700 2607421 -560021 793812 2841212 2428092
18-04-2019 9581250 8898320 1870274 -543762 71595 1398107 1271057
19-04-2019 11392500 10926440 1445443 -423534 6880 1028789 975820
20-04-2019 11720000 11246680 1499542 -460229 25163 1064476 946955
21-04-2019 11032500 10551660 1484464 -475046 7905 1017323 896069
22-04-2019 11782500 11376280 1512316 -468296 162968 1206988 1127588
23-04-2019 14482500 13892140 1472191 -450291 89805 1111705 1001158
24-04-2019 12250000 11445160 2799932 -1113566 245213 1931579 1995182
25-04-2019 15120000 14448140 2177970 -751723 23429 1449676 1336338
26-04-2019 14370000 13778440 1515570 -472454 32153 1075269 1059283
27-04-2019 9475000 8689680 2908279 -1251072 301514 1958721 1833142
28-04-2019 11707500 11047980 1163376 -224474 21711 960613 872995
29-04-2019 11745000 10886900 1739471 -341753 62565 1460283 1288536
30-04-2019 9282500 8719540 869128 -173999 10543 705672 697523
TOTAL 376126750 361559420 42305905 -13806185 3894454 32394174 30593437
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
Indira Sagar Project
DATE SCHEULE in KWH ACTUAL in KWH DEVIATION CAP AMOUNT ADDITIONAL TOTAL ADJUSTED
CHARGE in RS. in RS. DEVIATION DEVIATION DEVIATION
CHARGE in CHARGE in CHARGE in RS.
RS. RS.
01-04-2019 8848000 8926900 -368231 0 23484 -344747 -336324
02-04-2019 5828000 5929200 -575839 0 7229 -568610 -281594
03-04-2019 1732000 1771200 -123412 0 0 -123412 -150956
04-04-2019 1134000 1170700 -99510 0 0 -99510 -116595
05-04-2019 1556000 1584600 -79043 0 14461 -64582 -65124
06-04-2019 1838000 1860600 -20889 0 35722 14833 15185
07-04-2019 962000 984800 -56107 0 1959 -54148 -53331
08-04-2019 2120000 2152200 -116239 0 4457 -111782 -107049
09-04-2019 2598000 2618400 -67437 0 0 -67437 -74238
10-04-2019 2646000 2683700 -171810 0 0 -171810 -199286
11-04-2019 1528000 1560500 -135902 0 4989 -130913 -152196
12-04-2019 2546000 2588500 -170038 0 738 -169300 -177943
13-04-2019 3118000 3145500 -103944 0 7910 -96034 -94102
14-04-2019 2804000 2842300 -128895 0 4666 -124229 -126980
15-04-2019 3662000 3695800 -62928 0 6512 -56416 -60934
16-04-2019 1194000 1218800 -51217 0 2725 -48492 -37111
17-04-2019 1332000 1357900 -55151 0 0 -55151 -65035
18-04-2019 2410090 2429000 -29869 0 10850 -19019 -21228
19-04-2019 2044000 2089700 -155531 0 1833 -153698 -163075
20-04-2019 2718000 2747500 -76875 0 2721 -74154 -83328
21-04-2019 3096000 3135200 -139239 0 557 -138682 -161397
22-04-2019 4510000 4569200 -150287 0 2551 -147736 -159779
23-04-2019 3673700 3728500 -224985 0 3991 -220994 -253326
24-04-2019 2371200 2432600 -245899 0 1359 -244540 -235125
25-04-2019 4280250 4324800 -177719 0 0 -177719 -193939
26-04-2019 2897700 2923800 -91354 0 6581 -84773 -86423
27-04-2019 2806050 2853400 -175707 0 16400 -159307 -175155
28-04-2019 990600 1021800 -48917 0 1773 -47144 -54139
29-04-2019 969150 1001500 -35977 0 5653 -30324 -34862
30-04-2019 3451500 3464600 -28319 0 7356 -20963 -21251
TOTAL 81664240 82813200 -3967270 0 176477 -3790793 -3726640
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
M/s BHILAI JAYPEE CEMENT LTD. SATNA DRWL

DATE SCHEULE in ACTUAL in DEVIATION CAP AMOUNT ADDITIONAL TOTAL ADJUSTED ENERGY DRAWN
KWH KWH CHARGE in RS. in RS. DEVIATION DEVIATION DEVIATION AGAINST
CHARGE in RS. CHARGE in RS. CHARGE in RS. CONTRACT
DEMAND
01-04-2019 167904 254393 0 0 0 0 0 86489
02-04-2019 113264 102817 -150563 0 25466 -125097 -124605 33563
03-04-2019 167904 202274 -125754 0 0 -125754 -125160 62975
04-04-2019 82216 164634 -1310 0 0 -1310 -1309 83222
05-04-2019 0 23291 0 0 0 0 0 23291
06-04-2019 0 18356 0 0 0 0 0 18356
07-04-2019 0 18188 0 0 0 0 0 18188
08-04-2019 0 16478 0 0 0 0 0 16478
09-04-2019 0 15930 0 0 0 0 0 15930
10-04-2019 0 16219 0 0 0 0 0 16219
11-04-2019 0 13861 0 0 0 0 0 13861
12-04-2019 0 15597 0 0 0 0 0 15597
13-04-2019 0 51950 0 0 0 0 0 51950
14-04-2019 167904 249221 -995 0 0 -995 -997 81606
15-04-2019 113096 194507 -356 0 1504 1148 1145 82270
16-04-2019 167616 254346 0 0 0 0 0 86730
17-04-2019 145808 229283 -1821 0 3681 1860 1881 85097
18-04-2019 167616 252173 0 0 0 0 0 84557
19-04-2019 124000 206228 -476 0 1969 1493 1492 82991
20-04-2019 167616 256134 0 0 0 0 0 88518
21-04-2019 124000 203545 -2536 0 0 -2536 -2536 80754
22-04-2019 167712 220962 -67489 0 0 -67489 -67246 70584
23-04-2019 140432 187909 -29555 0 10610 -18945 -18852 66841
24-04-2019 167712 251811 0 0 0 0 0 84099
25-04-2019 113152 192135 -1317 0 320 -997 -995 79778
26-04-2019 167712 245080 -1648 0 0 -1648 -1647 78247
27-04-2019 129520 201347 -10524 0 0 -10524 -10471 73498
28-04-2019 0 54374 0 0 0 0 0 54374
29-04-2019 0 11014 0 0 0 0 0 11014
30-04-2019 0 9042 0 0 0 0 0 9042
TOTAL 2595184 4133099 -394344 0 43550 -350794 -349300 1656119
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
M/s PRISM CEMENT LTD. MANKAHARI.SATNA DRWL

DATE SCHEULE in ACTUAL in KWH DEVIATION CAP ADDITIONAL TOTAL ADJUSTED ENERGY
KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION DRAWN
RS. RS. CHARGE in CHARGE in CHARGE in AGAINST
RS. RS. RS. CONTRACT
DEMAND
01-04-2019 217472 546927 0 0 0 0 0 329455
02-04-2019 254376 624843 0 0 0 0 0 370467
03-04-2019 201264 319721 0 0 0 0 0 118457
04-04-2019 227152 581737 0 0 0 0 0 354585
05-04-2019 218528 569567 0 0 0 0 0 351039
06-04-2019 227152 566589 0 0 0 0 0 339437
07-04-2019 287520 686082 0 0 0 0 0 398562
08-04-2019 170608 411643 0 0 0 0 0 241035
09-04-2019 248712 372137 0 0 0 0 0 123425
10-04-2019 37138 356008 0 0 0 0 0 318870
11-04-2019 57504 356124 0 0 0 0 0 298620
12-04-2019 72808 313678 0 0 0 0 0 240870
13-04-2019 143760 366789 0 0 0 0 0 223029
14-04-2019 287520 572828 0 0 0 0 0 285308
15-04-2019 244044 584627 0 0 0 0 0 340583
16-04-2019 210528 578875 0 0 0 0 0 368347
17-04-2019 287136 630055 0 0 0 0 0 342919
18-04-2019 175152 509954 -3852 0 0 -3852 -3852 336056
19-04-2019 287136 615095 0 0 0 0 0 327959
20-04-2019 287136 678482 0 0 0 0 0 391346
21-04-2019 301632 612727 0 0 0 0 0 311095
22-04-2019 213600 557499 0 0 0 0 0 343899
23-04-2019 247116 631017 0 0 0 0 0 383901
24-04-2019 223176 546502 0 0 0 0 0 323326
25-04-2019 247116 458848 0 0 0 0 0 211732
26-04-2019 247116 554503 0 0 0 0 0 307387
27-04-2019 175296 460702 0 0 0 0 0 285406
28-04-2019 290208 468033 0 0 0 0 0 177825
29-04-2019 213568 446297 0 0 0 0 0 232729
30-04-2019 175296 325335 0 0 0 0 0 150039
TOTAL 6476770 15303224 -3852 0 0 -3852 -3852 8827708
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
M/s PRISM CEMENT LTD. UNIT II MANIKAHARI,SATANA DRWL

DATE SCHEULE in ACTUAL in DEVIATION CAP ADDITIONAL TOTAL ADJUSTED ENERGY


KWH KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION DRAWN
RS. RS. CHARGE in CHARGE in CHARGE in AGAINST
RS. RS. RS. CONTRACT
DEMAND
01-04-2019 532620 814888 0 0 0 0 0 282268
02-04-2019 532620 809279 0 0 0 0 0 276659
03-04-2019 575040 991823 0 0 0 0 0 416783
04-04-2019 514080 902760 0 0 0 0 0 388680
05-04-2019 579648 922527 0 0 0 0 0 342879
06-04-2019 530472 931287 0 0 0 0 0 400815
07-04-2019 579648 900878 0 0 0 0 0 321230
08-04-2019 455424 752247 0 0 0 0 0 296823
09-04-2019 455424 818288 0 0 0 0 0 362864
10-04-2019 405384 822385 0 0 0 0 0 417001
11-04-2019 455424 837058 0 0 0 0 0 381634
12-04-2019 409704 744380 0 0 0 0 0 334676
13-04-2019 527888 819171 -5005 0 1535 -3470 -3476 293108
14-04-2019 579648 990084 0 0 0 0 0 410436
15-04-2019 578784 896171 0 0 0 0 0 317387
16-04-2019 578784 857852 0 0 0 0 0 279068
17-04-2019 436352 783950 0 0 0 0 0 347598
18-04-2019 505248 855659 0 0 0 0 0 350411
19-04-2019 422004 788888 0 0 0 0 0 366884
20-04-2019 493824 841296 0 0 0 0 0 347472
21-04-2019 597024 751960 0 0 0 0 0 154936
22-04-2019 424800 702882 0 0 0 0 0 278082
23-04-2019 585600 914851 0 0 0 0 0 329251
24-04-2019 525300 896374 0 0 0 0 0 371074
25-04-2019 585600 910655 0 0 0 0 0 325055
26-04-2019 525300 902395 0 0 0 0 0 377095
27-04-2019 525300 924111 0 0 0 0 0 398811
28-04-2019 585600 988932 0 0 0 0 0 403332
29-04-2019 525240 837168 0 0 0 0 0 311928
30-04-2019 525240 873865 0 0 0 0 0 348625
TOTAL 15553024 25784064 -5005 0 1535 -3470 -3476 10232865
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur
STATE LOAD DESPATCH CENTRE
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED, JABALPUR
DATE WISE DEVIATION REPORT FOR THE MONTH OF April - 2019
MSEDCL DRWL
DATE SCHEULE in ACTUAL in KWH DEVIATION CAP ADDITIONAL TOTAL ADJUSTED
KWH CHARGE in AMOUNT in DEVIATION DEVIATION DEVIATION
RS. RS. CHARGE in CHARGE in CHARGE in RS.
RS. RS.
01-04-2019 246822 288016 108369 0 0 108369 108214
02-04-2019 246822 257144 106692 0 18660 125352 125490
03-04-2019 246822 239560 -24051 0 2798 -21253 -21153
04-04-2019 246822 235000 -19652 0 7755 -11897 -11886
05-04-2019 246822 246656 8321 0 16856 25177 25154
06-04-2019 246822 271160 72209 0 18319 90528 90044
07-04-2019 246822 257944 27492 0 17753 45245 45110
08-04-2019 246822 253928 50854 0 6580 57434 57309
09-04-2019 246822 251144 45848 0 4113 49961 49888
10-04-2019 246822 273584 133769 0 0 133769 133304
11-04-2019 246822 254360 46924 0 0 46924 46857
12-04-2019 246822 266112 90753 0 3429 94182 93946
13-04-2019 246822 260384 57822 0 1910 59732 59645
14-04-2019 246822 259952 39715 0 12949 52664 52579
15-04-2019 246434 259600 41465 0 8233 49698 49606
16-04-2019 246434 175592 -227520 0 50866 -176654 -175085
17-04-2019 246434 90008 -361649 0 65390 -296259 -293400
18-04-2019 246434 245576 1512 0 2618 4130 4130
19-04-2019 246434 248568 6269 0 3296 9565 9562
20-04-2019 246434 241032 -14123 0 546 -13577 -13574
21-04-2019 246434 239168 -1069 0 301 -768 -768
22-04-2019 246494 236872 -7095 0 10839 3744 3762
23-04-2019 246494 233880 -41626 0 14630 -26996 -26864
24-04-2019 246494 254152 2295 0 1972 4267 4270
25-04-2019 246494 237920 26876 0 9427 36303 36347
26-04-2019 246494 231984 -29028 0 19926 -9102 -9096
27-04-2019 246494 174888 -136473 0 74464 -62009 -61686
28-04-2019 246494 261600 60797 0 18212 79009 78506
29-04-2019 246416 277128 69485 0 2760 72245 71990
30-04-2019 246416 267968 51205 0 18135 69340 69140
TOTAL 7398836 7290880 186386 0 412737 599123 601341
(+) Payable (-) Receivable

Assistant Engineer(LD) Executive Engineer(LD)


MPPTCL,Jabalpur MPPTCL,Jabalpur

Das könnte Ihnen auch gefallen